Skip to the record
The only place to find full transcripts.

Original source · versioned page text

OPW10AKLandscapingRoadRes

Attached to the e-mail 23-8-21 FW OPW Application Landscaping Road Reserve - 10 Arakoon Crescent Sunshine Beach (2).msg.

of 16

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (17.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

11) Dividing land into parts by one a how TAIN en are being created and what is the intended use of the

parts?

    
    

    

    
  

   

   

   

| Industrial | Other, please specify:

| Intended use of parts created | Residential | Commercial

Number of parts created

       

 

42) Boundary realignment

12.1) What are the current and proposed areas for each lot comprising the premises?

Current lot Proposed lot

Lot on plan description | Area (m?)

| Lot on plan description | Area (m2)

_———_— ——— —

 

13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
(attach schedule if there are more than two easements)

     

| Existing or Width (m) Length (m) Purpose of the easement? (e.g. | Identify the land/lot(s)
| proposed? | | | pedestrian access) benefitted by the easement —

   

 

Division 3 — Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.

14.1) What is the nature of the operational work?

  

| Road work Stormwater Water infrastructure
| Drainage work Earthworks Sewage infrastructure
,/ Landscaping Signage Clearing vegetation

 

     
 

| Other — please specify: |
14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
| Yes — specify number of new lots:

_ No

  
  

$

 

PART 4 —-ASSESSMENT MANAGER DETAILS

 

| 15) Identify the assessment manager(s) who will be assessing this development Baoan

 

Page 6
DA Form 1 — Development application details
Version 1.3— 28 September 2020
Log in to download the original file

OPW10AKLandscapingRoadRes.pdf · 17.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.