5179SQMP_2 PearsonsRd_Feb2021_Rev2_
Callaghan & Toth
4.3 MUSIC Modelling Results
The MUSIC modelling program has been used to investigate the performance of various
treatment options in the treatment train. MUSIC version 6.3 is the current version and capable
of incorporating rainwater re-use in the model. These features have been used in making
comparisons between different stormwater management systems for this report.
4.3.1 Water Quality Objectives
This model meets the pollution load reduction target as detailed in the State Planning Policy
2017 (Appendix 2: Table B). The following have been included in Appendix A.
The treatment train effectiveness for the system.
The MUSIC Version 6.3 Summary Report.
The information above indicates that the new carpark, sealing, footpaths, and associated
landscaping with the proposed stormwater treatment train will achieve reductions in pollutant
loads as detailed in Table 4.2 below.
TABLE 4.2: COMPARISON OF LOAD REDUCTIONS
Parameter MUSIC POLLUTANT LOAD
REDUCTION REDUCTION
RESULT TARGETS
(Source: SPP 2017)
Flow 3.5%
Total Suspended Solids 83% 80%
Total Phosphorus 57% 60%
Total Nitrogen 50% 45%
Gross Pollutants >5mm 100% 90%
4.3.2 Assessment of Results
The developed site has been modelled as a series of Urban Residential sub-catchments, which
incorporate Water Sensitive Urban Design (WSUD) treatment trains. Plan No 2035-01 to 03
Revision C shows the proposed location of the treatment system - BB4, BB1, BB2, BB3,TP1,
TP2 and TP3.
The reductions listed in Table 4.2 above generally comply with Council’s requirements, Water
by Design Deemed to Comply Solutions and the State Planning Policy December 2013 –
Appendix 2, Table B. except for Total Phosphorus being 3% lower than the pollutant load
reduction target of 60%. Total Phosphorus result for the site discharging into the tributary is
57% - which is considered suitable as the target is 60% and the result is within acceptable
model error. Further polishing can be expected from overland flow thru densely vegetated
buffer.
Therefore, it is considered that the proposed stormwater treatment system is currently sufficient
to reduce the pollutants prior to exiting the site and entering the tributaries of the Six Mile Creek.
16
2035 2 Pearsons Road IWMP – Revision 2 February 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.