6.0 CONCLUSIONS & RECOMMENDATIONS
An integrated water management approach has been used to assess the site’s stormwater
requirements and water management needs. In summary:
The proposed reconfiguration at 2 Pearsons Road from one (1) lot into eighteen (18) lots
plus the balance park lot, can be treated by a stormwater treatment train consisting of:
o One Bioretention Basin (BB4)
o Three roadside Bio Pods (BB1 to BB3)
o Three tree pits (TP1 to TP3)
This proposed stormwater treatment train achieves the current best practice load based
reduction targets as prescribed in State Planning Policy 2017 (Appendix 2: Table B)
The new lots have sufficient flood free areas to build residential infrastructure in
accordance with Council’s requirements.
The increased flood storage achieved with the measures:
o Detention volume in detention basin, and
o Detention in the main stormwater pipe.
The riparian re-vegetation will be carried out as necessary,and freehold land is elevated
well above flood levels.
19
2035 2 Pearsons Road IWMP – Revision 2 February 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.