Original source · versioned page text
5179SQMP_2 PearsonsRd_Feb2021_Rev2_
Callaghan & Toth
2.0 INTRODUCTION
This Integrated Water Quality Management Plan (IWMP) has been prepared as part of the
Reconfiguration of a Lot application to Noosa Council.
This IWMP has been prepared in accordance with:
1. Water Sensitive Design Code in the Noosa Plan;
2. The latest Water Sensitive Urban Design Technical Design Guidelines for South East
Queensland, published by Health Waterways; and
3. Environmental Protection (Water) Policy 2008.
The lot contributing to the overall development and subject to this report is shown in Site
Location Plan, Figure 1.1 and are described as Lot 3 on RP113733, located at 2 Pearsons
Road, Cooroy.
This IWMP considers the new hardstand areas, including roadways, footpaths, allotments, and
new roof areas for the proposed 18 lots (17 new lots) and one park lot. This report also aims to
demonstrate that the proposal complies with relevant codes and guidelines and that the storm
water runoff will not change the surrounding hydrology.
In order to receive planning approval from Noosa Council, this site must demonstrate that it
complies with Council’s Water Sensitive Design Code and that the storm water runoff will not
change the surrounding hydrology.
The Model for Urban Stormwater Improvement Conceptualization (MUSIC) has been used to
assess the suitability of various treatment devices and to model existing and predicted pollution
export loads and concentrations.
6
2035 2 Pearsons Road IWMP – Revision 2 February 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.