Council archive · source document
07/0261 - Op Works - Transport Type 5 - Domestic Marine (Jetty) [As Published] · 142007.261
am NOOSA Checklist - Applications Involving Land
ns Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any !DAS application. Please check each of the following items before accepting an
application at the counter.
41. APPLICATION FORMS
1.1 Form 1 PartA
1.1.1. Ensure that the form is fully completed.
1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 ifthere are multiple owners, the consent of each owner is required.
1.1.2.2 ifthe owner of the tand is a company, either ACN No. or Company Seal required.
4.2. Form1 Part B-O Supporting information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [4
1.1.2.1 Ensure that each of Forms B-O which are attached are fully completed. [a
2. REFERRAL INFORMATION
2.1 Ensure that items 1-23 have been checked and/or completed with regard to referrals. [7]
3. ENVIRONMENTALLY RELEVANT ACTIVITIES
3.4 Ensure that Part G is completed if EPA referral is required.
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
4. FORM 2- REQUEST TO CHANGE APPROVAL
4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.
5. PLANS
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational ue
Works) accompanies the application. In addition ensure that each set is complete. t
§.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or Ad format and is “
unbound.
6. SUPPORTING INFORMATION
6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that itis
capable of reproduction. [|
6.2 In the case of reports, ensure that 1 of the > copies is in an A3 or A4 format and is unbound. =
7. FEE . . .
7.1. Ensure that the application fee, as 5 determined from the Council's adopted scale of fees,
“
accompanies the application or has been paid.
7.2. Ensure that the fee which has been paid is recorded on the application form.
. Date ..... 15) tye deseeceneees
plication, please deliver both to the following IDAS Application Receiving
Receiving Officer f2 saves
Having completed this form and accepted t
trays:-
« Ifthe application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.
« — {fthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.
¢ If the application is for Operational Works (for parking, access, sewerage or drainage) exclusively — AOD2 in the
Land Development Section.
» Inall other circumstances - AOP1’s desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
SEP! g:\ant\forms\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 17 pages
Page 2
ea
INTEGRATED PLANNING ACT 1997
Form 1 Development Application
V Common details
Part A, Version 2.4, 29 May 2006
e
a.
The comptetion of all applicable questions on Part A is mandatory for alt applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.ckd.gov.au.
Any information requested in the form may be provided in an attachment to the application, For further information about completing the following details, refer to Guide 1
Description of Jand 1. Street address: fnelucinghouse number, street name, suburbvlocality name & postcode) {if applicable)
Alltand the subject of the application, must be i *
identified. However, a description of the land is not [ {4 3 Sheorehaven det ve.
ited in retati bi va . . yn
ee eal Retort teh (ERA 2. Name of water body or watercourse, within which the development is proposed: (ifapplicabie)
Adyice for completing Q2 - Q2 apples if V,
development is proposed wilhin a water body or | [ CORK Lh tas
walcourse 3. Lot on plan description (eg. Lot 123 on RP 4567}/ GPS coordinates:
Advice for completing Q3 ~ Most land can be
identified by a lot on plan description. These details | Lo ft 7 6 g kg PIO ¥2 gS }
can be obtained from title documents or through the ge
focal goverment. ons or vou 4. The above description is for: {tick applicable box)
However ihe don which te development oe the land on which the development is proposed; or
proposed does nof have a lot on pian description (i.e. fe hoe ape ‘ .
the development Is proposed in 1 waterbody or é (ii) the land adjoining the water body or watercourse, within which the development is
nocae provide - ttn or proposed; or
i} the lot on plan description for the se
adjoining/adjacent tand; or Lo ii) the water body or watercourse.
(i) GPS coordinates where there is no
adjoiningladjacent tand (ag. in Moreton Bay). 5. Shop / tenancy number 6. Storey / level: 7. Total area of land: (m or ha):
Advice for completing Q7 - 07 does not apply if the 2
development is within a water body or watercourse. h L ! GAG, x _
Advice for completing Q8 - Q8 apptes if an whi fe ei . ff annie
development is within a local covennert area. 8. Local government area in which the land is situated: feg. Esk, Hervey Bay, Woocoo etc) (if applicable)
Note: Areas below high water mark are not within a : .
focal government's atea unless provided for under the L Noosa,
Local Gavemment Act 1993. 9. Port authority for the strategic port land or strategic port land tidal area on which the
icp for completing Q9 - i + . . , 1 .
brtinees somal ee ogie ot antes A strategic development is proposed: (eg. Port of Brisbane, Port of Townsville) {if applicable)
port land tidal area, For more details refer to Guide 14 [ L A feo Sz }
Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc.)
lf there is insufficient room available, details may be [ t |
provided in an attachment to the application. Aue Lakh
11. Proposed use of the tand: (eg. 6 unit apartment building, 30 Jot residential subdivision, ERA for aquaculture in
ponds with a total area of 7 ha for which wastes are released into waters etc).
L__ Jetty
}
Other applicable parts of Form 1 12. Other parts of Porm 1 completed as part of this application: (eg. Part D, Part 1, etc)
Pan A must always be accompanied by other
completed parts of Farm 1. For information about | P ‘aut E _ i
when a part of Form 1 may apply refer to Guide 1.
coplcant details 13. Applicant's name: 15. Contact person:
arty identify who is making the application. The
applicant need ngt be the owner of the land. Meas . letley & ilders Lasatey / Zec/ _
When signing and lodging this application 14. Contact number: 16. Facsimile ntmber/e-mail address:
‘The appicantis responsible for ensuring the
information provided is correct. The assessment S&% Z ¢ 2 % & o
manager, any referral agency & the Chief Executive
(where applicable) will raly on this information when | 17. Postal address:
assessing and deciding the application.
Ifthe applicant Is a company - a contact person
must be shown, 18. Signature:
ASHIRE COUNCIL
NOOSA SUPT Se
Page 3
ll
~
7s
INTEGRATED PLANNING ACT 1997
Land owner’s consent (if applicable)
Section 3.2.1(3) of the IPA prescribes that an
application must contain, of be supported by, the
written consent of the land owner!s, if the application
invonves:
@ a material change of use,
(i) reconfiguration of a lot;
{work on land below high-water mark & not within a
canal as defined under the Coastal Protection and
Management Act 1995,0r
(iv) work on sail corridor land defined under the
Transport infrastructure Act 1994.
Section 3.8.1(2)(2) of the IPA provides that
landowner's consent is net requked for a mobile or
temporary ERA .
For more information refer to Guide 4.
20.
Part A, Version 2.4, 29 May 2006
Land owner's consent to the making of this application:
Name Signature Date
OR WI Wiatince DO. (9-02-07
ID, WAuace Ba Wece }2-0207
Resource entitlement (if applicable) 21.
Section 3.2.1(5) of the IPA requires evidence of
resource entitlement be given for applications that
involve a prescribed State resource,
Section 3.2. 1(10){a}{l) of the IPA prescribes that an
application cannat be taken to be properly made
without evidence of the resource entitement.
Advice for completing Q21 & 22
Refer to schedute 10 of the /niegrated Pisnning
Regulation 1996 that prescribes ihe nature of evidence
required by the State in support of the lodging of this
development application.
Advigg for complet
The information in (i) - {v) is mandatory if evidence is
required under O22 (ii) or (iil) above.
The official stamp of the Department of Natural
Resources, Mines and Water is mandatory where the
application involves any water or riverine quarry
material under the Water Act 2000.
Section 3.2.1(5A) allows the resource manager to limit
the time the evidence may be used. Q23 (vi) must be
completed if the evidence is time fmited.
23.
Does this application involve a State resource prescribed under a regulation (other than involving
quarp/ material on State coastal fand under the Coastal Protection and Management Act 1995)?
NO - go to Q24 (YES - goto 922
. This application is accompanied by evidence: (tick applicable box)
(71 (i) of the allocation of, or entitlement to, the resource - attach evidence and go to Q23(vi)
C1 (ii) the chief executive of the department administering the resource is satisfied the
development is consistent with an allocation of, or entitlement to, the resource - go
10. Q23
C1 fill) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go to Q23
Evidence of the resource entitlement:
(i) Resource entitlement / authority details (vii) Official stamp of the department
administering the resource (if
applicable)
{ii) Name of “— officer
(ii) Position of “a officer
(iv) Signature of delegated officer
(v) Date
(vi) pe date of evidence fete
Assessment triggers
This checklist does not apply if the application requires
the competion of Parts A and B of the Form onfy, It
musi be completed for afl other applications.
24.
Is the IDAS Assessment Checklist completed and attached to this application?
(J Yes
oO NO - the assessment manager may refuse to accept this application on the
grounds that the application has not been properly made
Plans / drawings / reports
An application should be accompanied by details to
support the proposal & enable tha assessment
manager, referral agencies and any person viewing
the application during public scrutiny or public
notification to understand the scope of the proposal
and any potential impact.
25,
Plans/drawings/reports accompanying this application:
Plan / Drawing / Report Number
V9O62Q6Er1 Nbc dt
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager's)
Date ofengagement. / /
Accreditation Number:
DATE RECEIVING OFFICER'S 4 REFERENCE |
[ree ® (7oe RECEIVED | (sj2(e) NAMEIS IPD Kroon ag) NUMBERS | a [ oe | |
Notification of Engagement of Private Certifier (Optional format) v
To. Council. | have been engaged as the private cerlifier for the building work referred to in this application.
__ Name: Signature:
Page 4
INTEGRATED PLANNING ACT 1997
Part E, Version 2.0, 4 October 2004
c Operational &/or building work
assessable against a local government's planning scheme
ohana
pee a
aa
Completion of all question
on Part E is mandatory for all applications involving the assessment of operational work and/or building work {including detailed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does
not involve assessment of a material change of use of premises at the same
Nature of the application 41.
A development permil authorises
Preliminary approval
development to occur, while a preliminary O ty app
infrastructure, etc
+ provide
time) assessable against a local government's planning scheme.
This application is for (tick one (1) or both if applicable)
details of the type of work eg, roadwork, stormwater, water and sewerage
approval is a step in the approval process
and does not authorise development to occur.
The types of work that are assessable against!
a planning scheme are determined by the
scheme for a particular tocal government and
will vary across the State,
To determine the types of work thal are
assessable under a particular planning
scheme, contact the relevant locat
government.
e
Infrastructure, etc
AND/ 2,
evelopment permit -
provide details of the type of work eg. roadwork, stormwater, water and sewerage
©
Privede Jetty
2. Are the works subsequent to a previous development approval?
0 (DYES - provide details of all previous approvals (ag. file references)
3. ne for a canal estate?
NO
- Lives
Portable Long Service Leave levy (if |4. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
applicable)
Prior to issuing a development permit for the
works, the assessment manager is required
(11 YES - complete 05
[EAN10 - 05, 6& 7 do not apply
Page 5
INTEGRATED PLANNING ACT 1997
State-controlled road matters (cont)
IDAS Assessment Checklist, Version 18.0, 10 November 2006
C1 (ii) development on land not contiguous to a State-controlled road and -
O(a) material change of use —
* assessable against the local govemment's planning ucheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
; that schedule;
1 (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(1 (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
+ assessable against the local government's planning scheme; and
= mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
whi none of the above
Clearing vegetation / 3. The application involves: (tick appticable box/es}
For more information refer to Guide 12. oO (i) material change of use-
‘Unless you answered "none of the above” to Q3, the . .
application requires assessment by the Department (a) assessable against the planning scheme;
of Natural Resources Mines and Water (NRMW). a
lf an agency other than NRMW is the assessment (b) on alot containing .
manager for the application, NRMW Is 3 * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
concurrence agency fer the appkcation in relation to « if there is no property map of assessable vegetation for the lot - remnant vegetation;
If you ticked ©2() or (i), your application requires (c) where the existing use of the land is a rural or environmental use; and
relerral to NRMW for assessment regardless of {d) where the size of the land is 2 hectares or larger - complete Part J of Form 1 ©
whether vegetation clearing is proposed or not, . . .
Oi) reconfiguring a tot - .
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
{b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
Cl (iii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a fot mentioned in (ii) - complete Part J of
Form 1 .
cai none of the above.
Strategic port land : _ 4. The application involves:
Far more information refer to Guide 11.
Ifyou ticked (i) - the relevant Port Authority is the
assessment manager for the application.
If you ticked {u) Queensland Transport is a
concurrence agency for the applicalion.
Acid sulfate soils
For more information refer to Guide 10,
Unless you answered “none of the above” to Q5, the
application requires assessment by Departnent of
Natural Resources Mines and Water (NRMW).
{fan agency other than NRMW is the assessment
‘manager for the application, NRMW is an advice
agency for the application in relation io this matter.
C1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 {Tl
Act) - complete Part t of Form 1
(1 (ii) a material change of use that is inconsistent with the land use plan approved under the
Tl Act for the strategic port land - comptete Part ! of Form 1
(iii) none of the above
@
5. The application involves development on land situated in an identifieds local government area
and where the surface of the land is: (tick applicable box)
CJ (i) below 20m AHDS and the development will involve the excavation of 1000m?or more of
soil or sediment at or below Sm AHD, or
CO (ii) at or below Sm AHD and the development will involve filling the site with 1000m? or more
of material
al (iii) none of the above
5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Counglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay. Hinchinbrooke. Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Maium Vale, Mornington, Noosa, Pine Rivers,
Redciifle, Redland, Rockhampton, Sarina, Thunngowa, Tiaro, Torres, Townsville, Whitsunday.
6 Australian Height Datum (AHD).
Page 2
Page 6
INTEGRATED PLANNING ACT 1997
Major hazard facilities or possible
major hazard facilities
For more information refer to Guide 17.
ifyou answered “YES” to 06, the application
requires assessment by the Department of
Emernency Services (DES).
If an agency other than DES is the assessment
manager for the application, DES is a concurrence
agency for the application a relation to this matter.
IDAS Assessment Checklist, Version 18.0, 10 November 2006
Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safely Management Act 2001?
NO
(YES - complete Part & of Form 4
Water related development under the | 7.
Water Act 2000
For more information about items {a} - {d), refer to
Guige 15. For more information about item (e),
refer to Gui fication i
assessment of a referable dam?
Unless you answered “none of the above” fo Q7, the
application requires assessment by the Departmen:
of Natural Resources Mines and Water (NRMW),
If an agency other than NRMW is the assessment
manager for the application, NRMW is a
concurrence agency for the apptication in relation to
this matter.
The application involves:
[J (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable box/es)
cre
Oe
CI (b)
Oo
O@)
Oe}
DO (h
in a watercourse, lake or spring, or from a dam constructed on a watercourse (eg.
apump, gravity diversion, stream re-direction, weir or dam) - complete Part Kz, Ka, Ks, Ks, or Ko of
Form 1 whichever is applicable;
for an artesian bore anywhere in the State, no matter what the use - complete Part
K: of Form 1;
for a subartesian bore, in declared groundwater area’, for use for purposes other
than stock and/or domestic use - complete Part K: of Form 1;
for a subartesian bore, in certain declared groundwater area, for use for stock
and/or domestic purposes - complete Part K: of Form 1;
for constructing a referable dams or that will increase the storage capacity of a
teferable dam by more than 10% - complete Part Ks of Form 1; OF
for taking or interfering with overland flow water - compie‘e Parts Ks and G of Form 1
none of the above,
“Removal of quarry material from a 8.
watercourse
For more information refer to Guide 16.
If you answered “YES* to Q8, the application
requires assessment by the Department of Natural
Resources Mines and Water (NRMW),
If an agency other than NRMW is the assessment
manager for the appiication, NRMW is a
concurrence agency for the application in relation to
this matter.
Note: Par G of Form 1 is required to be completed
as the activily of removing quarry material from a
watercourse is also an Environmentally Relevant
Activity (ERA).
Does the application involve development for the removal of quarry material from a watercourse?
requjring an allocation notice under the Water Acf 2000?
MN
)
(J YES - complete Parts Kr and G of Form 1
7 The declared ground water areas are listed in Guide 13 Development in a declared catchment area,
8 Referabte dam fs defined under the Water Act 2000.
9 Watercourse is defined in sch 10 of the IPA.
Page 3
Page 7
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006
Operational works ina tidal areaor |9. The application involves operational work that is: (tick the applicable box/es)
coastal management district Forme (1 (i) tidal work'® as defined under the Coastal Protection and Management Act 1995 (the
information about prescribed tidal work in local Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; OF
government tidal areas refer Guide 24 LO Wii) tidal work that is prescribed tidal work" other than in a canal’? -complete Part P of Form 1; or
Uniess you answered *none of the above" fo Q9, the a . a oe
application requices assessment by the Ci (ii) carried out within a coastal management district under the Coastal Act and for - complete
Environmental Protection Agency {EPA). Part M of Form 1 if any box/es (a) to {i) below are ticked.
marae Necppeaten EST (1) constructing or installing works in a watercourse between MHWS and HAT (ie.
agency for the application in relation to this matter. other than those works in tidal water) where the development has been determined not
Local government is the assessment manages for all to be assessable against the Water Act 2000 ;
prescribed tidal work.
(1 (b) constructing a canal’? intended to be connected to tidal waters;
C1 (c) constructing an artificial waterway: ‘
(1 (d)_ reclaiming land under tidal water;
LJ (e) disposing of dredge spoil or other solid waste material in tidal water;
(1 (f) interfering with quarry material on State coastal land above high-water mark;
(Dg) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
[1 (h)_ removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
(1 (i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
{iv) none of the above. , e
Operational work below high water 110. The application involves operational work that is: ( tick the applicable box/es)
mark information refer to Guide 48. For mare (1 (i) tidal work"3 as defined under the Coastal Protection and Management Act 1995 (the
information about prescribed tidal work in focal Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
Votes you answered vane . eae ‘oot (i) tidal work that is prescribed tidal work" - complete Part P of Form 1; oF
the application ages cera to Queensland C1 (ii) carried out within a coastal management district'S under the Coastal Act and for -
concurrence agency O {a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Local government is the assessment manager for all Mof Form 1;
Prescribed Idol work (1) (b) reclaiming {and under tidal water - complete Part M af Form 1; or
[1 (c) constructing a canal's, if the canal is associated with reconfiguring a lot - complete
of Part M of Form 1,
{iv) none of the above.
Coastal management 11. The application involves: (tick the applicable bowes)
For more information refer to ane on CI (i) amaterial change of use assessable under a planning scheme involving operational
Unless you answered “none of the above" to Q11, 1 i istrict!S
the application requives assessment by the work carried out completely or partly in a coastal management district
Environmental Protection Agency (EPA). Ci) a material change of use assessable under a planning scheme involving building
If an agency other than EPA is the assessment i i istri is —
manager lr the appicabon, EPA is @ concurrence work, carried out completely or partly in a coastal management district that is
agency for the applicaton in relation to this matter. + the construction of a new premises with a GFA" of at least 1000m? @
+ the enlargement of the GFA of existing premises by more than 1000m?2
Ci(ii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
C1 (iv) reconfiguring a lot's assessable under schedule 8 of the IPA and in connection with
the construction of a canal'® - complete Pant M of Form 1
di {v} none of the above
10 Tidal work is defined in sch 10 of the IPA.
11 Prescned tidal work is defined in the Coastaf Protection and Management Regulaton 2003 and includes certain udal works completely or partly within a local government tidal area
12 Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain udal works completely or partly within 2 focal government bdal area.
45 Coastal management distict is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management disirict under section 47(2) of that AcL
16 Canal means canal as defined under the Coastal Protection and Management Act 1995
17 GFA is defined in sch 14 of the IPA to mean the gross floor area. For 2 definition of how to calculated GFA, go to the planning scheme against which the apphcation is being assessed.
18 Under $117 of the Coasta! Protection and Mai jent Act 1995, an application for ration, where the F uration is associated wiih the construction of an artificial waterway, must be
accompanied by the appkication for the operational works to construct the artificial waterway.
Page 4
Page 8
INTEGRATED PLANNING ACT 1997
Development within the limits of a
port
For more information refer to Guide 18. For
information about prescribed tidal work refer to
Guide 24.
It you answered “YES” to Q12, the application
tigers referrat to the Port Authority.
The Port Authority is a concurrence agency if the
development is -
‘* within 200m of a shipping channel or an entry
and exit shipping corridor for the port
‘© within 1000m of a swing basin, a commercial
shipping wharf, a mooning, anchorage or spoil
grounds;
* within 1000m of a planned port facility identified
in a tand use ptan approved under the Transport
infrastructure Act 1994.
tn al other situation the Port Authority is an advice
agency.
12.
IDAS Assessment Checklist, Version 18.0, 10 Navember 2006,
Does the application involve development below high water mark’? and within the limits of a port
under the Transport Infrastructure Act 1994?
lO
{77 YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
Marinas
For more information refer to Guide 18. For
information about whether a marina is prescribed
tidal work refer to Guide 24. The local government
is the assessment manager for all prescribed tidal
work,
tf you answered “YES” to Q13, the application
triggers referral to Queensiand Fire ang Rescue
13.
Does the application involve operational work that is tidal work for a marina2° with more than 6
vessel} berths?
NO
(YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
Applications involving material change of use and?
of reconfiguring a lot may trigger this referral.
For more information refer to Guide 5.
Unless you answered “none of the above" to Q17,
the application requies assessment by the
Environmental Protection Agency (EPA). If an
agency other than EPA is the assessment manager
for the application, EPA will be a concurrence
agency for the application in relation to this matter.
Service as an advice agency. |
Tidal works in strategic port land tidal] 14. Does the application involve tidal works within a strategic port land tidal area"?
areas Ero
For more information refer to Guide 18. y
- complete Part M of Form 1
Unless you answered “NO” to Q14, the relevant Port oO ES pe
Authority is the assessment manager for the
application and the Environmental Protection
Agency (EPA) and Queensland Transport (QT) are
concurrence agencies for the application.
Heritage 15. Does the application involve development in a heritage registered place as defined under the
For further information refer to Guide 19. Queensland Heritage Act 1992?
Ifyou answered “YES” to Q15, the application ho
triggers referrat to the ind Heri ung
as concurrence agency for the application. oO YES - complete Part C of Form 1
Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and
For more information, inctuding a list of the declared involves: (tick the applicable boxes)
catchment areas within Queenstand, refer to Guide . so 7 . oo
C1 (i) reconfiguring a Jot if any lot resulting from the reconfiguration is less than 16 hectares;
mass you angered "none ot ihe above’ 76, CJ (ii) development assessable against the planning scheme involving the establishment or
Deparment of Nata Resources ines and Water expansion of a waste water disposal system, other than a disposal system for carrying
(NRMW). out an environmentally relevant activity under the Environmental Protection Act 1994;
Mf an agency other than NRMW is the assessment fs
manager for the application, NRMW is a aii) none of the above
concurrence agency for the apptication in relation to
this matter.
Contaminated land 17. The application involves: (tick the applicable box/es)
(i) reconfiguring a fot for which all of part of the premises are -
{a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
+ item 5, including the exemption otherwise provided for by paragraph (d);
+ item &, including the exemption otherwise provided for by paragraph (e); or
+ item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
(b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
C1 (i) a material change of use -
{a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
[M(iii) hone of the above
19 High water mark is defined in the Coastaf Protection and Management Act 1995 and means the ordinary high water mark at spring tide,
20 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.
21 Strategic port land tidal areas are the areas generally 50 metes seaward of high water mark adjacent to stategic port land.
Page 5
Page 9
INTEGRATED PLANNING ACT 1997 Electricity infrastructure For more information refer to schedute 2of the IP. Regulation. Unless you answered “none of the above" to 018, the application Wiggers referral to the agency to which the easement is granted in favour of as advice agency. ‘Land designated for community infrastructure Applications involving devekxpment on land designated for community infrastructure may tigger this reterral. For more information refer to schedule 2 of (he 1P Regulation. If you answered "YES" to Q19, the application requires assessment by the chief executive of the department administering the Aci aulhorising the development for the designated purpose. If an agency other than the designator is the assessment manager for the application, the designating agency will be a concurrence agency for Ihe application in relation to this matler. 19. Does the application involve development assessable against the planning scheme and on land 18. The application involves: tick the applicable box/es) IDAS Assessment Checklist, Version 18.0, 10 November 2006 Oi (i) reconfiguring a tot where any part of the lot is - + subject to an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 and the easement is for a transmission grid or supply network under that Act; or + situated within 100m of a substation site: iti) with reconfiguring a lot if - a material change of use, assessable against a planning scheme and not associated + any part of the premises is subject to an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 and the easement is for a transmission grid or supply network under that Act; and . * any structure or work that is the natural and ordinary consequence of the use is, or will be, located wholly or partly in the easement; D iii) site; Ow) a material change of use, assessable against a planning scheme and not associated with reconfiguring a lot if any part of the premises is situated within 100m of a substation operational work that is filling or excavation assessable against the planning scheme, not associated with reconfiguring a lot, if — + any part of the premises is subject to an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 and the work is located wholly or partly in the easement; re none of the above. designated for community infrastructure? « the work is located wholly or partly within 10m of a substation site; (i) intended to be supplied by a public sector entity; and (ii) on land not owned by or on behalf of the State; and (iii) other than development - (a) for the designated purpose; or Ane carried out by, or on behalf of, the designator. NO C1 Yes Page 6
Page 10
INTEGRATED PLANNING ACT 1997
SEQ Regional Plan
For more information refer to schedule 2 of the IP
Regulation.
Refer to Chapter 2, part SA and schedule 10 of the
Integrated Planning Act 1997, and schedule 2 of the
Reguiatory Provisions for relevant definitions.
Unless you answered “none of the above" to Q20,
the application requires assessment by the Office of
Urban Management (OUM).
‘Fisheries matters
For more information refer to schedule 2of the [P
Regulation.
Uniess you answered “none of the above” to 021,
the application requires assessment by the
Oepartment of Primary Industries and Fisheries
(OPI8F).
if an agency other than OPI8F is the assessment
manager for the application, OPI&F is a concurrence
agency for the application in relation to items (i) —
(iv) and an advice agency in relation to item (v).
IDAS Assessment Checklist, Version 18.0, 10 November 2006
20. The application involves (tick appicable box/es) -
(2 (i) amaterial change of use of premises -
{a) in a Major Development Area in the Urban Footprint for -
OO (i) anurban activity -
(11 inan area included in a structure plan where the IPA, section 3.1.6
applies;
(2 inan area not included in a structure plan where -
« the IPA, section 3.1.6 applies to the application for the material change
of use; or
« the premises exceeds 10,000m2; or
the gross floor area (GFA) on the premises will exceed 10,000m2; or
* impact assessment is required under the relevant planning scheme
O (ii) intensive animal husbandry, or
O (it) residential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
© (i) anurban activity and not specified in section 2.4(2); or
1 (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
(d) in the Investigation Area for -
(3 (i) anurban activity and not specified in section 2.10(2);
(2 (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
CO (ili) intensive animal husbandry
C1 (i) reconfiguring a fot-
On land in a Major Development Area in the Urban Footprint that is:
(a} not included in a structure plan; and
(b) not specified in section 3.1(2).
{XY (iii) none of the above
21. The application involves: (tick the applicable boxes)
(1 (i) anassessable material change of use for aquaculture - complete Part O1 of Form 1;
C1 (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1;
(1 (iii) assessable operational work completely or partly within a declared fish habitat area.
complete Part Oz of Form 1;
C1 (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
(2) (v) devetopment assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
Bir none of the above.
Page7
Page 11
INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport
For more information refer to Guide 23, schedule 8A
of the IPA, & schedule 2 of the IP Regulation.
Unless you answered “none of the above”, the
application triggers referrat to QT as a concurrence
agency,
IDAS Assessment Checklist, Version 18.0, 10 November 2006
22. The application involves: (tick the applicable box/es)—
(C1 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the iP Regulation and exceeding the thresholds set by that
schedule.
(1 (ii) reconfiguring a fot—
Oe)
Ct)
O@
O@
Oe
on land that is completely or partly within a public transport corridor, and the
total number of lots increases;
on land that is completely or partly within a future public transport corridor or
an airport's public safety area;
on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
for a residential purpose within the 25 ANEF contour for an airport;
for a residential purpose resulting in 100 or more allotments,
( (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on
Ota)
OO)
land that—
is completely or partly within a public transport corridor or a future public
transport corridor;
will result in work that encroaches into an airport's operational airspace.
Hi none of the above.
Railway safety and efficlency
For more information refer to Guide 23, schedule 8A
of the [PA & schedule 2 of the IP Reaulation.
Unless you answered "none of the above’, the
application triggers referral to QT as a concurrence
agency.
Moonie to | to Brisbane pipeline
For more informabon refer to schedule 2of the IP.
Reaulation.
Unless you answered “none of the above’, the
application viggers referral to the hokder of pipeline
heence No 1 issued under the Petrokeum Act 1923,
currently Santos QNT Pty Lid, for advice.
23. The application involves: (tick the applicable box/es})—
CO (i) a materiat
mentioned
schedule.
change of use assessable against the planning scheme for a purpose
in schedule 13D of the IP Regulation and exceeding the thresholds set by that
C1 (ii) reconfiguring a lot—
Ow
Oo)
Oe
Od)
Oe)
Of
on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;
on land that abuts rail corridor land, commercial corridor {and or future railway
land, and the total number of lots increases;
on land that abuts rail corridor !and, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases:
for a residential purpose resulting in 100 or more allotments.
(1) (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m’, on land that—
Oe
Oe)
i. Oe i
(iv) none of the above.
is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
is completely or partly within future railway land, or a railway tunnel easement;
abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
24. The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic
0 (i) a materia
pipeline, and involves: (tick the applicable box/es)—
change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.
D1 (ii) reconfiguring a fot
UO (iii) operational work assessable against the planning scheme, that is filing, excavation,
compaction, drilling, boring or piling not associated with a reconfi iguring a lot, and the
work is located wholly or partly in the easement.
{iv) none of the above.
Page 8
Page 12
INTEGRATED PLANNING ACT 1997 Koala habitat area For more information, refer to Guide 26 and schedule 2 of the [P Requlaton. Unless you answered “none of the above’, the application requires referral to the Environmental Protection Agency as a concurrence agency. IDAS Assessment Checklist, Version 18.0, 10 November 2006 25. The application involves: (tick the applicable box/es)— CD (i) a material change of use of premises in a koala conservation area or koala sustainability area made assessable under a planning scheme, that is not for a domestic activity and will result in - Ca) Oo) Oo) clearing of native vegetation over an area greater than 2500m?; a new building and any reasonably associated structure with a total footprint greater than 1000m?; an extension to an existing building and any reasonably associated structure if the extension has a total footprint greater than 1000m2; extracting gravel, rock or sand from an area greater than 5000m?, excavating or filling an area greater than 5000m?; additional traffic in a koala conservation area or koala sustainability area, between 6p.m. on a day and 6a.m. on the following day. OO (il) reconfiguring a tot in a koala conservation area or koala sustainability area that will result in - (J (a) anincreased number of lots; (1 (b) clearing of native vegetation over an area greater than 2500m?. (11 (iii) operational work in a koala conservation area or koala sustainability area made asse ssable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with reconfiguring a lot mentioned in (ii) above} that will result in the clearing of native vegetation over an area greater than 2500m2, LO (iv) operational work in a koala conservation area or koala sustainability area made assessable under a planning scheme (not associated with a material change of use mentioned in (i) or reconfiguring a fot mentioned in (ii) above) that is not for a domestic activity and will result in - L) (a) clearing of native vegetation over an area greater than 2500m?; ( (b) extracting gravel, rock or sand from an area greater than 5000m?; LC (c) excavating or filling an area greater than 5000m2, (Tv) none of the above. Referral coordination An information request requires referral coordination if the application involves - () 3 or more concurrence agencies; or (i) a facility or area assessable under a planning scheme and prescribed in schedule? or 8 of the IP Regulation; or (iii), development which is subject to an application for preliminary approval mentioned in 53.1.6 of the IPA. For more information go to Guide2.and Guide 6. 26. Does the application trigger referral coordination? NO (1 YES, as the application: (tick the appticable box/es) (1 (i) triggers 3 or more concurrence agencies; LI (ii) involves a material change of use made assessable under a planning scheme and prescribed in schedule 7 of the IP Regulation; O (iii) involves a material change of use (other than a dwelling house, outbuilding or farm building) made assessable under a planning scheme, or reconfiguring a fot, in an area prescribed in schedule 8 of the IP Regulation; C1 (iv) _ is for a preliminary approval mentioned in s3.1.6 of the IPA Referral agency responses Prior to lodgement Under $3.3.2 of IPA a referral agency may give a referral agency response on a matter within its jurisdiction about a proposal before an application for the proposal is made to the assessment manager. This is commonly the case where an application requires referral to a building referral agency (eg. Qld Fire and Rescue Service). 27. Did a referral agency give a referral agency response under 3.3.2 of the IPA before the application was made to the assessment manager? © aN 0 (J YES - attach a copy of the referral agency/s response/s PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the completed IDAS Assessment Checklist (if applicable). OFFICE USE ONLY (appiicabie to assessment manager) [_DATERECEWED | i REFERENCE NUMBERIS | Page 9
Page 13
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 18.0, 10 November 2006
SECTION 2 — BUILDING REFERRALS (completion not mandatory)
Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.
For more informaton go to schedule 2 of the IP
Reauiation
Special fire services - generally 1. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
For more information go to schedule 2 table 1 and requires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998
schedule 2A of the IP Regulation. (IP Regulation) or includes an alternative solution assessed against the performance requirements of the
Assessment period 15 days. No response is a Building Code of Australia.
deemed refusal
Fire safety for budget accommodation 2. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
For more information go to schedule 2 of the IP the subject of the application requires the installation of a fire safety system for a budget accommodation
Beoulation building,
Spray painting 3. An application may trigger referral to the Department of Industriat Relations (DIR) as a concurrence agency
For more information go to schedule 2 of the (P if the application involves a workplace incorporating spray painting.
Regulation
Retail meat premises 4. An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
For more information go to schedule 2 of the 1P tetail meat premises.
Regulation
Private health facilities 5. An application may trigger referral to the Department of Health as a concurrence agency if the application
For more information go to schedule 2 of the iP involves a private health facility.
Regulation
Workplace area less than 2.3m? 6. An application may trigger referral to the Department of tndustrial Relations (DIR) as an advice agency if the
For more information go to schadule 2 of the 1B application involves a work place area fess that 2.3m?.
Regylation
Land contiguous to a State-controlled |7. An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
road agency if the application involves land contiguous to a State-controlled road.
For more information go to schedule 2 of the IP
| Regula ton :
Pastoral workers accommodation 8. An application may trigger referral to the Department of Indusirial Relations (DIR) as a concurrence agency
For more information go to schedule 2 of the IP if the application involves pastoral workers accommodation.
Regulation
Child care centre 9. An application may trigger referral to the Department of Communities as a concurrence agency if the
For more information go to schedule 2 of the IP. application involves a childcare centre.
Regulation
Coastal development 10. An application may trigger referrat to the Environmental Protection Agency (EPA) as a concurrence agency
For more information go to schedule 2 of the IP if the application involves land completely or partly seaward of a coastal building line?2.
Regulation
Heritage 11. An application may trigger referral to the Heritage Council as a concurrence agency if the application
For more information go to schedule 2 of the IP involves a heritage registered place.
| Regulation
Fisheries matters 12. An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
For more information go to schedule 2 of the [P concurrence agency if the application involves assessable building work in a declared fish habitat area; or
Reaulation as an advice agency if the application involves assessable building work on land that adjoins a declared fish
habitat area. .
‘ Integration of land use and public 13. An application may trigger referral to Queensland Transport as a concurrence agency if the application
transport involves existing or future public transport corridors, or airport operational airspace23.
For more information go to schedule 2 of the |P
Reaviation
Railway safety and efficiency 14. An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves future railway land.
NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS
The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications retating to design and siting (17, 18 & 19), and building work for removat or rebuilding {23}, the assessment period is 5 days. For alt
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no
fesponse is taken to be a deemed approval.
Amenity and aesthetic impact of
particular building work for single
detached class 1 building or class 10
building or structure
For moxe information go to schedule 2 table 1 of the
IP lation.
Assessment period 15 days. No response is a
deemed appraval.
15.
An application will trigger a referral to the local government if it is :
* fora single detached class 1 building or class 10 structure; and
e the loca! government has declared by resolution the following:
— the appearance of the building or structure will have an extremely adverse impact on the amenity of
the locality; and
— the appearance of the building or structure would be in extreme conflict with the character of the
locality.
2 Coastal buikding lines are prescribed under the Coasta! Protection and Menagement Act 1995.
2 Operabonal airspace is as defined in State Pianning Polcy 1/02 "Development in the Vicinity of Certain Airports and Aviation Facilities”.
Page 10
Page 14
ry IDAS Assessment Checklist, Version 18.0, 10 November 2006 _INTEGRATED PLANNING ACT 1997 designated rainwater tank area For more information go to schedule 2 table 1 of the IP Regulation and the QOC part 25. Assessment period 15 days, No response is a deemed refusal. Whether particular buildings may be | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a occupied for residential purposes feferral to the local government as the concurrence agency. For more information go to schedule 2 table 4 of the IP Requiation, Assessment period 15 days. No response is a deemed refusal. Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work For more information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code. JP Regulation. 18. An application may trigger referral to the local government as the concurrence agency if the building work Assessment period 5 days. No response is a does not comply with the qualitative statement for building clearance and site cover. deemed refusal 19. An application may trigger referrat to the local government as the concurrence agency if the building work does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland Development Code, part 11 or 12. Fire safety in particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has For more information go to schedule 2 table 1 of the been completed. Assessment period 15 days. No response is a deemed refusal. Higher risk personal appearance 21, An application may trigger referral to the tocal government as the concurrence agency to determine if the services building work For mora information go to schedule 2 table 1 of the * — complies with the performance criteria of the Queensland Development code part 15; and IP Regulation and the QDC part 15. « the work does not comply with an acceptable solution stated in the part. Assessment period 15 days. No response is a deemed refusall, Building work for residential service | 22. An apptication for building work for premises in which residential care service under the Residential For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger IP Regulation and the QOC part 20. teferral to the local government as the concurrence agency. Assessment period 15 days, No response is a deemed refusal, Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger rebuilding feferral to the tocal government as the concurrence agency. For more information go to schedule 2 table 1 of the Assessment period 5 days. No response is a deemed refusal. Building work for rainwater tank in | 24. An application may trigger referral to the local government as the concurrence agency to determine if the buitding work or structure complies with the relevant performance criteria if - ¢ Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant building work, in a designated rainwater tank area; and * Under the Queenstand Development Code, part 25, the rainwater tank does not include an acceptable solution for a relevant performance criteria. Page 11
Page 15
ax NOOSA LAND USE SECTION FEES =) SALE OF DOCUMENTS Superseded Planning Scheme Documentation : 146104 520 Copy of Permit/Approval Letter 32 146120 The Noosa Plan Documentatian 32 146564.1 APPLICATION FEES Material Change of Use - Code/Impact - Consistent . 32 146102 521 Inconsistent 32 146102 521 Assessment under Superseded Planning Scheme 32 146102 521 Modification to a Development Permit 32 146102 521 Extension of a Currency Period 32 146102 521 Operational Works - Landscaping . 32 146102 521 Bldg Work assessable against the Planning Scheme 32 146102 521 E LODGEMENT REVIEW Half Hour 146119 522 \ One Hour 146119 522 ADVERTISING . Purchase Advertised Applications 31 146110 523 JETTIES . Jetty Application Fee }2Za<D 146115 524 Jetty Bond Soo 942220 92 BONDS . Performance Bond 33 95 943200 SIGNS Registration Fee 32 137510 222 SEARCH FEE Search of Land Use Section file 32 146120 ) Liquor Licensing Request . 32 146120 ToTAL $ /700 NAME: 4 Ud (\attareg ADDRESS: ale tO Bon. 299 Tt NESSAVICLE Sh FILENO: o7/ 2L | DATE: _/S 2-07 REcEIPTNO: —/! 0D Signature of TP Officer: PQ Sron AUTHORITY NO: Mel 2209 J orter |;
Page 16
. CALCULATION OF FEES APPLICATION FEE TOTAL FEES MCU - CODE ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION MCU - IMPACT ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION OPERATIONAL WORKS Details of Development FEE CALCULATION TOTAL FEES
Page 17
180 x 75 HWD: 2AAi0 86 2M16 3 PLES. KICKER: 2 200 H6 MARINE HWD POLES 136 HWO NOTE THAT ALL POLES TO COMPLY 1475 x No14 TYPE 17 WITH AS 2150 - PLING CODE STAINLESS STEEL 150 x 75 HWD SCREWS @ 450 CRS 2 200 H6 MARINE HWD POLES NOTE THAT ALL POLES TO COMPLY WITH AS 2150 - PILING CODE DeTAll : ) ™ NOTES: 1. UNLESS NOTEO OTHERWISE ALL TIMBER SHALL BE DURABILITY CLASS 1 OF APPROVED SPECIES AND HAVE A STRESS GRADE OF F14 MIN. SECTION 2. UNLESS NOTED OTHERWISE ALL CONSTRUCTION SHALL LU) COMPLY WITH THE ENVIRONMENTAL PROTECTION AGENCYS’ OPERATIONAL POLICY - “BUILDING AND ENGINEERING STANDARDS FOR TIDAL WORKS. 3. ALL STAINLESS STEEL BOLTS, RODS, ETC., SHALL BE APPROVED MARINE GRADE 316. ALL OTHER STEELWORK INCLUDING NUTS, BOLTS, WASHERS, SCREWS, NAILS, ETC., SHALL BE HOT DIPPED GALVANISED OR STAINLESS STEEL. 4. TOP OF PILES SHALL BE SEALED AND FULLY CAP FLASHED OR RINGED. 5. DIMENSIONS AND LEVELS SHALL NOT BE SCALED FROM THE DRAWINGS. JETTY USE: LOT 768 No.193 SHOREHAVEN DRIVE WALKWAY DECK VERTICAL NOOSA WATERS RABRINK PTY LTD T/A DESIGN LIVE LOAD - 2.0 kPa Fer onrn MAXIMUM MOORED VESSEL - 5m & Associates BERTHING VELOCITY - 0.5 m/sec Ing cna Engineers Bi EMAL. 172 PILES: ALL PILES SHALL BE APPROVED HARDWOOD AND TREATED TO HAZARD 6. SINGLE USER, PRIVATE NO VEHICULAR ACCESS ALL PILES SHALL BE INSTALLED IN ACCORDANCE WITH AS 2159 - PILING CODE
Page 18
__| b-29z/90
OUT ONPOM . tok, i @, 4NOAWT ONINVe
7 ALLar
9002 USGNEAON NOLHSY § gasod0ud
4
“ALA ee woe NV1d SIS a a
‘wiQ 0008
1
= we HOMWW ALNNOO :
S07 NLLNWM3L VGASM HSidvd
wiviontiog S¥TB0BY \iuee .
cums -woyegh ZV MUNVHL G94 LOT bE APs
11
cai eres-upxvg SO Ts NOLLdD630
LENZ 6995 - 40 He o1 aLins
asseudug Lowe AluadOUd Tw3u —t—»>— . P .
2
pNQyernonas:
—— EEE
£28 E92 OT NOW INI
¥
sovepossy 9
USPJON uYor f ° F @
W/L GL Ald INISEVY
OSZLb
$310d GQMH
-—-__—_————. J3LVSuL NIW 002 @
SZX OSL
‘SI1d
” “SL OSE
SYALVM VSOON
SAIN NSAVHSYOHS
€61°ON
89Z LO)
ALLAar GasOd0ud
SOVTTVM ‘€
2b 4.06%
¥i9ds
ON3 HOV3
SM3YOS S/S OML
HLIM SusYuvas OL
O3XId GMH wtd SZ X BE
“ONDIDS0
9POHL L190 i987 PD
PPLE) BOP SHIOHY epee} BECO
ZTRLPSIPS 10 HBAs Ong weUnE 8
92 BED 080 9 NE
ORze22 ON eovsorn |
——?— - . OMEVs FNXSLOZO
i PN GALVIDOSSV ONV ONIHDLId
8 ALdOUd ANOLS JO YVATO 38 OL S3Td
et \
TV ONINIVLSY SLLONOD + Ssmon Ausse
SYs0 ing
ALLA VSOON
SV ONIOVELL
GLI Ald Li-F1ld
Os}
see ew 'ONYOHOOOY NI & NOILVAI 1A
GATWLSNI 398 TIVHS S3Td TV $94 107
‘9 GUVZVH OL
Galva. ONY COOMCAYVH
Q3A0UddY 38 TIVHS S31ld TIV
‘Sad ]
oo
L NOILVAS 1S
GHV ¥F'0 Ta SSLV¥M WNWINIW
OHV 0} Ta
OHV 071 TY 4030
FM-O-dOL
OHY 00°2 TY T3AS1 GOO1S GIGUOOTY WANIXWW ,
Used in these records
07/0261 - Op Works - Transport Type 5 - Domestic Marine (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.