Council archive · source document
07/0261 - Op Works - Transport Type 5 - Domestic Marine (Jetty) [As Published] · 142007.261
INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport
For more information refer to Guide 23, schedule 8A
of the IPA, & schedule 2 of the IP Regulation.
Unless you answered “none of the above”, the
application triggers referrat to QT as a concurrence
agency,
IDAS Assessment Checklist, Version 18.0, 10 November 2006
22. The application involves: (tick the applicable box/es)—
(C1 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the iP Regulation and exceeding the thresholds set by that
schedule.
(1 (ii) reconfiguring a fot—
Oe)
Ct)
O@
O@
Oe
on land that is completely or partly within a public transport corridor, and the
total number of lots increases;
on land that is completely or partly within a future public transport corridor or
an airport's public safety area;
on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
for a residential purpose within the 25 ANEF contour for an airport;
for a residential purpose resulting in 100 or more allotments,
( (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on
Ota)
OO)
land that—
is completely or partly within a public transport corridor or a future public
transport corridor;
will result in work that encroaches into an airport's operational airspace.
Hi none of the above.
Railway safety and efficlency
For more information refer to Guide 23, schedule 8A
of the [PA & schedule 2 of the IP Reaulation.
Unless you answered "none of the above’, the
application triggers referral to QT as a concurrence
agency.
Moonie to | to Brisbane pipeline
For more informabon refer to schedule 2of the IP.
Reaulation.
Unless you answered “none of the above’, the
application viggers referral to the hokder of pipeline
heence No 1 issued under the Petrokeum Act 1923,
currently Santos QNT Pty Lid, for advice.
23. The application involves: (tick the applicable box/es})—
CO (i) a materiat
mentioned
schedule.
change of use assessable against the planning scheme for a purpose
in schedule 13D of the IP Regulation and exceeding the thresholds set by that
C1 (ii) reconfiguring a lot—
Ow
Oo)
Oe
Od)
Oe)
Of
on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;
on land that abuts rail corridor land, commercial corridor {and or future railway
land, and the total number of lots increases;
on land that abuts rail corridor !and, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases:
for a residential purpose resulting in 100 or more allotments.
(1) (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m’, on land that—
Oe
Oe)
i. Oe i
(iv) none of the above.
is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
is completely or partly within future railway land, or a railway tunnel easement;
abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
24. The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic
0 (i) a materia
pipeline, and involves: (tick the applicable box/es)—
change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.
D1 (ii) reconfiguring a fot
UO (iii) operational work assessable against the planning scheme, that is filing, excavation,
compaction, drilling, boring or piling not associated with a reconfi iguring a lot, and the
work is located wholly or partly in the easement.
{iv) none of the above.
Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0261 - Op Works - Transport Type 5 - Domestic Marine (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.