Skip to the record
For the highest quality transcripts.

Council archive · source document

07/0261 - Op Works - Transport Type 5 - Domestic Marine (Jetty) [As Published] · 142007.261

of 18

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

   

INTEGRATED PLANNING ACT 1997

Part E, Version 2.0, 4 October 2004

 

 

c Operational &/or building work

assessable against a local government's planning scheme

ohana

pee a

aa

 

Completion of all question

on Part E is mandatory for all applications involving the assessment of operational work and/or building work {including detailed

engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does

not involve assessment of a material change of use of premises at the same

Nature of the application 41.

A development permil authorises

Preliminary approval
development to occur, while a preliminary O ty app

infrastructure, etc

+ provide

time) assessable against a local government's planning scheme.

This application is for (tick one (1) or both if applicable)

details of the type of work eg, roadwork, stormwater, water and sewerage

 

approval is a step in the approval process

and does not authorise development to occur.
The types of work that are assessable against!
a planning scheme are determined by the
scheme for a particular tocal government and
will vary across the State,

To determine the types of work thal are
assessable under a particular planning
scheme, contact the relevant locat
government.

e

 

 

 

Infrastructure, etc

AND/ 2,
evelopment permit -

provide details of the type of work eg. roadwork, stormwater, water and sewerage

 

©

Privede Jetty

 

 

 

 

 

 

 

 

 

2. Are the works subsequent to a previous development approval?
0 (DYES - provide details of all previous approvals (ag. file references)
3. ne for a canal estate?
NO
- Lives
Portable Long Service Leave levy (if |4. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?

applicable)
Prior to issuing a development permit for the
works, the assessment manager is required

(11 YES - complete 05
[EAN10 - 05, 6& 7 do not apply

 

 

Used in these records

About this file

File size
1.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0261 - Op Works - Transport Type 5 - Domestic Marine (Jetty) [As Published].pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.