Council archive · source document
Delegated Report - Code - Planning MCU26 0001 - AS PUBLISHED · MCU26/0001
h. Establishment of a communication protocol with the general public, adjoining owners,
emergency services and local businesses to advise of agreed construction times,
impacts on traffic and services and other relevant issues;
i. Include a post out to the local residents and businesses advising of the proposed
development, the expected time frames and the site contact details;
j. Include signage in prominent locations on the boundaries of the site advising of the
proposed development, the expected time frames and the site contact details;
k. identification of complaint management procedures including:
i. contact details for the on-site manager;
ii. dispute resolution procedures.
10. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction, must be notified to council in writing within five business days of the
change occurring.
11. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Engineering
12. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets must
be repaired immediately where it creates a hazard to the community. In circumstances where
the damage does not create a hazard to the community, it must be repaired immediately on
completion of the works associated with the development.
13. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
who is independent of the Developer and Principal Contractor, and they must certify that all
works conform to the Operational Works permit. Where municipal works are involved, such
confirmation must be submitted for the respective hold points prior to any site inspection by
Council Officers.
14. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice;
b. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines; and
c. The latest version of the Healthy Waterways document “Water Sensitive Urban Design
Technical Design Guidelines for South East Queensland” for all water quality devices
to be constructed on site.
Retention of Existing Trees and Vegetation
15. All trees and vegetation identified for retention must be protected in accordance with AS
4970, Protection of trees on development sites.
16. A qualified person * must be engaged for the duration of the works to:
a. Oversee installation of all tree protection fencing prior to commencement of any works
onsite (including any clearing).
b. Supervise tree protection within the development site and frontages, prior to, during
and following construction in accordance with AS 4970, Protection of trees on
development sites.
c. Oversee approved tree removal in proximity to retained trees.
Page 25 of 33
Document Set ID: 24436845
Version: 6, Version Date: 09/09/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU26 0001 - AS PUBLISHEDRelated documentApplication case desk ↗
About this file
- File size
- 8.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.