Skip to the record
The only place to find full transcripts.

Council archive · source document

Part 14 of 37 Appendix 12 - Bushfire Assessment MCU12/0208

of 44

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (36.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 16, section 1. The text section number identifies this passage in the reader.

Noosa on Weyba
Bushfire Assessment Report
                                                                                           (.J-’CardnO.

It is also noted that reduced            BAL
                                        requirements for residential and commercial buildings adjacent to
hazardous vegetation may be permitted if a more detailed     analysis of BAL requirements is carried out in
accordance with the Detailed Method for Determining the Bushfire Attack Levels (Method 2) of AS3959-2009
Construction of buildings in bushfire prone areas. Such an assessment is outside of the scope of this report.


4.2                Water Supplies

The SPP 1/03 Guideline states that, for all development involving new or existing buildings with a gross floor
area     greater than 50 m2, each lot has:

              a)      a reliable reticulated water supply that has sufficient flow and pressure characteristics for fire
                      fighting purposes at all times (minimum pressure and flow is 10 litres a second at 200 kPa); or

              b)      an on-site water storage of not less than 5,000 litres (e.g. accessible dam or tank with fire

                      brigade tank fittings, swimming pool).
The Noosa on Weyba project would be serviced by a reticulated water supply that would be available for fire

fighting/suppression purposes. To ensure that access to this reticulated water supply is readily available for
fire suppression and property protection purposes in the event of a bushfire, a series of hydrants should be
established around the perimeter of proposed residential precincts.

The establishment of a reticulated water supply servicing the Noosa on Weyba                 project would also be of
benefit to adjacent residents who are dependent on rain fed storage facilities (e.g. tanks and dams) for a
supply of water for fire management purposes. Given that high risk bushfire periods typically coincide with
periods of low rainfall the reliability of rain fed storage facilities can be limited, unless diligently managed by
the dependent residents.

The Noosa on Weyba project also incorporates an                  Integrated Water Cycle Management system capturing
100% of all roof water which would provide a backup water source for fire fighting should the mains supply
be interrupted.


4.3                Lot Layout and Siting

It is a requirement of the SPP 1/03 Guideline that lots be designed so that their size and shape allow for the

following.
1.        Efficient emergency access to buildings for fire-fighting appliances (e.g. by avoiding long narrow lots
          with long access drives to buildings).

2.        Setbacks and building siting such that buildings can be situated in locations of lowest hazard within
          the lot and appropriate setbacks from hazardous areas can be established and maintained.

In respect of the above, it is noted that internally the Noosa on Weyba Concept Master Plan generally:

     >    avoids the creation of long narrow allotments and each of the proposed building areas has direct road

          frontage to facilitate emergency access and egress; and
     >    makes       appropriate provision    for   buildings setbacks (see Section 4.1) and    the establishment of

          necessary firebreaks and fire maintenance trails (see Section 4.4).

Notwithstanding the above, proposed Rural Residential Precinct J is the only proposed building site where a
long driveway is proposed through areas of potentially hazardous vegetation. In respect of Precinct J it is
noted that:

     >    a building envelope is defined to ensure that appropriate separation is provided between any dwelling
          and adjacent areas of potentially hazardous vegetation; and

     >    alternative routes of access/egress would be maintained to the west and north to minimise the

          potential for entrapment in the event of a bushfire; and
     >    the Precinct will be serviced by a reticulated water supply; and

     >
          any dwellings constructed in Precinct J would need to be of a design and materials that complies with
          the requirements of AS3959-2009 Construction of buildings in bushfire prone areas.




Northbrook Corporation Pty Ltd                                Version 1                                 30 November 2012
Bushfire Assessment Report vl.docx                     Commercial in Confidence                                  Page 12

Used in these records

About this file

File size
36.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 14 of 37 Appendix 12 - Bushfire Assessment MCU12_0208.pdf · 36.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.