Council archive · source document
Part 14 of 37 Appendix 12 - Bushfire Assessment MCU12/0208
Very large file (36.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 19, section 1. The text section number identifies this passage in the reader.
Noosa on Weyba
Bushfire Assessment Report
(.J-’CardnO.
5 Conclusions
The proposed Noosa on Weyba development would increase the number of people living and working within
an area that contains substantial reserves of bush land that present a hazard to human health and property in
the event of a bushfire. As such it is a requirement of SPP 1/03 that the Noosa on Weyba development
make appropriate provision for bushfire hazard mitigation and management measures.
It is the conclusion of this assessment that the Noosa on Weyba proposal, as represented in the Concept
Master Plan, makes appropriate provisions for the mitigation and management of bushfire hazards.
Specifically the proposed development makes provision for:
> the establishment of appropriate building setbacks from areas of hazardous vegetation within and
external to the site;
> a reticulated water supply with the capacity to service the bushfire and general fire fighting
requirements for the proposed development;
>
upgrading of the external road network to provide enhanced access to the Noosa on Weyba site
locality for the deployment of fire management personnel and equipment, and evacuation of residents
if required, in response to a bushfire event;
> an appropriately designed internal network of formed roadways and fire maintenance trails that will
enable for the safe and efficient deployment of fire management personnel and equipment;
> an appropriate system of firebreaks comprised of roadways, maintenance trails and managed
vegetation zones to separate hazardous vegetation from potential building sites; and
>
ongoing maintenance and management of on-site vegetation, property and fire management
infrastructure by the Noosa on Weyba Body Corporate.
Notwithstanding the above, it will be necessary for relevant consideration to be given to bushfire hazard and
management issues during the further development of each stage of the Noosa on Weyba project.
Appropriate building standards, as specified in AS3959-2009 Construction of buildings in bushfire prone
areas, will also need to be enforced.
Northbrook Corporation Pty Ltd Version 1 30 November 2012
Bushfire Assessment Report vl.docx Commercial in Confidence Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 14 of 37 Appendix 12 - Bushfire Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 36.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.