Skip to the record
Every meeting, every word.

Council archive · source document

Part 14 of 37 Appendix 12 - Bushfire Assessment MCU12/0208

of 44

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (36.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 19, section 1. The text section number identifies this passage in the reader.

Noosa on Weyba
Bushfire Assessment Report
                                                                                                (.J-’CardnO.

5                    Conclusions

The proposed Noosa on Weyba development would increase the number of people living and working within
an area that contains substantial reserves of bush land that               present a hazard to human health and property in
the event of a bushfire.               As such it is a requirement of SPP 1/03 that the Noosa on Weyba development
make appropriate provision for bushfire hazard mitigation and management measures.

It is the conclusion of this assessment that the Noosa on Weyba proposal, as represented in the Concept
Master Plan, makes                   appropriate provisions for the mitigation     and   management of bushfire hazards.
Specifically the proposed development makes provision for:
    >    the establishment of appropriate             building setbacks from areas of hazardous vegetation within and
         external to the site;

    >    a  reticulated water supply with the capacity               to service    the   bushfire and   general fire fighting
         requirements for the proposed development;
    >
         upgrading of the external road network to provide enhanced access to the Noosa on Weyba site
         locality for the deployment of fire management personnel and equipment, and evacuation of residents
         if required, in response to a bushfire event;

    >    an    appropriately designed internal network of formed roadways and fire maintenance trails that will
         enable for the safe and efficient deployment of fire management personnel and equipment;

    >    an  appropriate system of firebreaks comprised of roadways, maintenance trails                       and   managed
         vegetation zones to separate hazardous vegetation from potential building sites; and
    >
         ongoing        maintenance         and   management of on-site vegetation, property and fire management
         infrastructure by the Noosa on Weyba Body Corporate.

Notwithstanding the above, it will be necessary for relevant consideration to be given to bushfire hazard and
management issues during the further development of each stage of the Noosa on Weyba project.
Appropriate building standards, as specified in AS3959-2009 Construction of buildings in bushfire prone
areas, will also need to be enforced.




Northbrook Corporation Pty Ltd                                 Version 1                                     30 November 2012
Bushfire Assessment Report vl.docx                      Commercial in Confidence                                      Page 15

Used in these records

About this file

File size
36.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 14 of 37 Appendix 12 - Bushfire Assessment MCU12_0208.pdf · 36.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.