Council archive · source document
20201221085022221 · OPW21/0001
Attached to the e-mail OPW21-0001 - Vehicle Crossover - 19 Bartholomew Crt Cooroy.msg.
Department of Infrastructure, Local Government and Piann
Section 2 — Further development details
7) Does the proposed development application involve any of the following?
Material change of use (1 Yes — complete division 1 if assessable against a local planning instrument
Reconfiguring a lot (1 Yes — complete division 2
Operational work CO Yes — complete division 3
Building work (1 Yes — complete DA Form 2 - Building work details
Division 1 — Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a local
planning instrument.
8.1) Describe the proposed material change ofuse -. :
Provide a general description of the Provide the planning scheme definition | Number of dwelling Gross floor
proposed use (include each definition in a new row) units (if applicable) area (m?)
"(if applicable):
Pe heehee nk natenciiin:
CO Yes
Mio
Division 2 - Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.
9.1) What is the total‘number of existing lots making up the errata
dings on the premises?
oe el Ls Re lm ames Receile oes ag Eye ces)
((] Subdivision (complete 10) (1 Dividing land into parts by agreement (complete 11)
(J Boundary realignment (complete 12)) (Creating or changing an easement giving access to a lot from
a construction road (complete 13))
10) Subdivision ; 2
10.1) For this development, how many lots are’ being
qeyeeice and what is the intended use of those lots:
Intended use of lots created Residential Commercial Industrial Other, please specify:
Number of lots created
RP remedies tke ks
C1 Yes — provide additional details below
lo
How many stages will the works include? ca
What stage(s) will this development application
apply to?
11) Dividing land into parts by agreement — how many parts are being created and what is the intended use of the
parts?
Intended use of parts created
Residential Commercial Industrial Other, please specify:
Number of parts created
Page 4
DA Form 1 — Development Application details
Version 1.0—3 July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20201221085022221.pdfRelated documentApplication case desk ↗
About this file
- File size
- 984 KB (small file)
- File type
No other editions are linked here.