Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Attachment 17- Biting Insect Investigation and Risk Management Report MCU12/0208

of 15

Text shows just the words. Original shows the document exactly as it was published.

Noosa on Weyba: Biting Insect Investigation and Risk Management
Prepared for Northbrook Corporation Pty Ltd
Ver 1.1: 21 May 2013                                                Page 13 of 14


A buffer of any practical size (even exceeding 100m) would have limited
benefit in reducing passage of long-range dispersing species such and Aedes
vigilax and Culex annulirostris. On occasions where these species are active,
insect screening fitted by home-builders to external windows and doors of
dwellings will provide general reduction in human domestic exposure (per the
Code)


       Code Outcome 2 – On Site Works

Code outcome 2 states:
                “Development does not intensify the presence of
                or expand breeding sites for mosquito larvae”

On-site works during construction of the development has some potential to
produce opportunities suitable for freshwater breeding mosquitoes. Drainage
works, temporary sediment basins, vehicle tracks and other potential habitat
would be monitored for presence of mosquito breeding. If significant amounts
of mosquito breeding were detected (say > 5 larvae per standard mosquito
sample dipper) then corrective actions would be required. Corrective actions
may be to fill or drain the offending breeding site.

          Code Outcome 3 – Design and Use of Wetlands and
          Waterways

Code Outcome 3 states:
                “New waterbodies or stormwater treatment
                wetlands / detention basins are designed to
                minimise the potential breeding opportunities of
                biting insects.”

As general guidance, the following generic criteria for permanent water bodies
within the development are:

      The batter around the constructed wetlands should be as steep as
       practical (within the design standards for public safety) to minimise
       shallow water (< 500mm) suited to mosquito breeding. If fencing is not
       used for public safety, a batter not greater than 1:6 is recommended.
      Normal water levels within a wetland should maintain at a minimum of
       500mm water depth except for the margins.
      Improve opportunities for wind action to keep the water surface
       disturbed to reduce availability to mosquito larvae (require contact with
       stable surface film for respiration). Therefore basin margins should not
       be planted with shrubs or trees.
      Aquatic macrophytes should not be planted in more than 60% of
       shallow water (<500mm) around the margin. They should be clumped
       with separations of open water allowing wind disturbance on the water
       surface.

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 17- Biting Insect Investigation and Risk Management Report MCU12_0208.pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.