Council archive · source document
Minor Change Existing Approval MCU23/0094 01 [AS PUBLISHED] · MCU23/0094.01
Qualified Person
21. Qualified Person, for the purpose of:
a. Supervising landscape works and preparing a landscape certification, is considered to
be a landscape architect, landscape designer or horticulturist with a minimum of three
years current experience in the field of landscape design.
b. Undertaking landscape construction and establishment works is considered to be a
person with five years current experience in commercial landscape construction
projects.
c. Undertaking, supervising tree works and preparing arboriculture certification, is
considered to be a person with a minimum three years current experience in tree
protection, hazard identification/mitigation and assessment and either:
i. International Society of Arboriculture (ISA) certification; or
ii. A Diploma of Arboriculture.
d. Undertaking Fauna site works and calculating compensatory habitat is considered to
be a Fauna Spotter Catcher with current certification under the Queensland Parks and
Wildlife Service.
e. Assessing and certifying soil quality is considered to be an Agronomist or
Horticulturalist with three years current experience in soil testing.
Landscape Works
14. The applicant must pay the re-inspection fee in accordance with Council's Fees and Charges
Register where:
a. An inspection revealed that any constructed rehabilitation/landscape works do not
comply with the conditions of the Decision Notice, Approved Plans and or Approved
Documents
b. Certification is submitted to Council falsely stating that works comply with the approved
plans, documents and or conditions of the Decision Notice.
15. Public amenity trees are defined as any tree located within public streets, parks or areas that
will become publicly owned as a result of this development.
Erosion & Sediment Control Plans
16. The ESC plans submitted with the application have not been approved and are not
considered suitable for addressing the conditions of this permit. Specialist advice and input
should be sought in the preparation of ‘for construction’ ESC plans.
8. PROPERTY NOTES
Not applicable.
9. VARIATION APPROVAL DETAILS
Not applicable.
10. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Building Works All building work.
11. SUBMISSIONS
Not applicable.
Page 28 of 30
Document Set ID: 23245480
Version: 4, Version Date: 17/09/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU23/0094 01 [AS PUBLISHED]Related documentApplication case desk ↗
About this file
- File size
- 270 KB (small file)
- File type
No other editions are linked here.