Council archive · source document
Minor Change Existing Approval MCU23/0094 01 [AS PUBLISHED] · MCU23/0094.01
22. The fence and any associated retaining walls along the boundary adjoining Lots 1 & 2
SP208257, Lot 75 RP71151 & Lot 49 SP298783 must be constructed to prevent nuisance
from car head lights and be acoustically constructed to limit the transfer of noise. Written
certification must be provided to Council confirming the acoustic treatments have been
incorporated prior to the sealing of the survey plan.
Clothes Drying Areas
23. Each dwelling must be provided with access to an outdoor clothesline which is screened from
public view (external to the development site) and where achievable, internal to the
development.
24. The notated “drying court” as shown on the Ground Level Plans of Units 101, 102, 105 &
701-704, are not to be enclosed. The outer side of each “drying court” is to achieve a
minimum of 50% transparent screening.
25. Deleted.
Community Management Statement
26. Any proposed Community Management Statement required for the development pursuant to
the Body Corporate and Community Management Act 1997 must be submitted to Council for
endorsement at the same time as submission of the Building Format Plan (or similar) to
Council for compliance assessment.
27. All clauses and by-laws of the proposed Community Management Statement must accord
with the requirements of this Decision Notice and, in particular, must include the following
additional clauses:
a. The site includes a stormwater management and water quality treatment system.
b. The stormwater management and water quality treatment system must be maintained
in accordance with the Water by Design (2009) Maintaining Vegetated Stormwater
Assets (Version 1).
c. The full cost of maintaining the system in accordance with the Water by Design (2009)
Maintaining Vegetated Stormwater Assets (Version 1) must be included in the
proposed levies for each dwelling owner/body corporate.
d. All service vehicles are to access the site from Eumundi Noosa Road only. Waste must
be serviced in accordance with Reference Plan 33132.OW5.1-A (vehicle turning
plans), the refuse bin area is to be located to allow for servicing internal to the
development site.
Landscaping Works
28. The development site must be landscaped. The works must be undertaken in accordance
with an Operational Works approval and the Noosa Plan for that specific area and must
include in particular:
a. the works shown on the referenced landscape plans;
b. vegetated screening of any electrical transformers, bin storage areas and the like from
the road frontage
c. provision of 1 street tree within the road reserve for every 8 metres of road frontage
29. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
Fauna Management
30. Vegetation must only be removed or disturbed in accordance with a Fauna Management
Plan (or part thereof) prepared by a qualified person* and endorsed through an Operational
Works approval.
Page 6 of 30
Document Set ID: 23245480
Version: 4, Version Date: 17/09/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU23/0094 01 [AS PUBLISHED]Related documentApplication case desk ↗
About this file
- File size
- 270 KB (small file)
- File type
No other editions are linked here.