EARTHWORKS CODE
Performance Criteria and Acceptable Solution
Noosa Medihub Lot 22
10 March 2022
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE
Dams
PO11 AO11.1 Not Applicable. No dams constructed as part of
Dam location and construction does not impact Where the site is in the Rural Zone— a) the land has a development
upon neighbouring properties in terms of— slope of less than 25%
a) hydrology; (1:4); and
b) alteration of existing overland flowpaths and b) the earthworks including cut and fill batters and
patterns; retaining walls are setback a minimum of 50m from
c) landslide or failure of dam wall; and the property boundary; and
effluent disposal areas. c) the size of the lot is greater than 5 hectares;
AND
AO11.2
Where the site is in the Rural Settlement Zone or the
Rural Zone where the lot is less than 5 hectares—
a) the land has a slope of less than 1:6; and
b) the earthworks including cut and fill batters and
retaining walls are setback a minimum of 20m from
the property boundary; and
c) involving less than 500m3 of material;
AND
AO11.3
For all other zones — No solution provided.
l:\8000-8999\8600-8699\8662\codes\10-03-22 earthworks code.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Appendix B Civil Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.