EXECUTIVE SUMMARY
This report has been commissioned by Stockwell to support the Development Application for the
proposed Lot 22 Medihub development at the Noosa Business Centre located at Eenie Creek Road
Noosaville.
The application is being made under the now superseded Noosa Plan (2006) and subject to code
assessment.
This report addresses the following Engineering aspects of the proposed development:
Topography
Flooding
Stormwater Quality Management
Stormwater Quantity Management.
Revision B of this report address the Noosa Shire Council Request for Further Information dated 22 April
2022. Additional information relating to the stormwater discharge arrangements for basement pump out
and connection to external networks, and minor amendments to the extent of earthworks are depicted
on the revised concept plans.
Excellence with Economy in Engineering 2
l:\8000-8999\8600-8699\8662\reports\12-05-22 stormwater management plan_issue b.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Appendix B Civil Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.