Council archive · source document
RFI - Appendix B Civil Engineering Report · MCU22/0038
Very large file (17.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 76, section 1. The text section number identifies this passage in the reader.
12 May 2022 Table of Figures Figure 1 – Proposed Development 5 Figure 2 – Site Location 6 Figure 3 – Treatment Plan 13 Table of Tables Table 1 – MUSIC Rainfall Runoff Parameters (Commercial) 11 Table 2 – Pollutant Export Parameters (Commercial) 11 Table 3 – Water Quality Objectives 12 Table 4 – Percentage Based Load Reduction Results 13 Table of Appendices Appendix 1 Architectural Plans 20 Appendix 2 Site Survey 21 Appendix 3 MPN Plans 22 Appendix 4 Bioretention Basin Maintenance Checklist 23 Excellence with Economy in Engineering 4 l:\8000-8999\8600-8699\8662\reports\12-05-22 stormwater management plan_issue b.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Appendix B Civil Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.