RFI - Appendix B Civil Engineering Report · MCU22/0038
Very large file (17.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 81, section 1. The text section number identifies this passage in the reader.
12 May 2022 A bioretention basin will be located along the southern boundary of the site with bypass flows discharging to the existing stormwater in the south east corner of the site. The treated flows only will connect to the basement drainage system for pump out to the external drainage system. This is required due to the high invert levels of the existing external stormwater network. No other flows other than the treatment flows from the bioretention basin subsoil drains will connect to the basement drainage system for pump out. The basement pump system will consist of a new tank under the basement slab with submerged pumps. The pumps and tanks will be accessed from within the basement via access cover. As the only flows that will enter this system from the bioretention basin are the treatment flows, the flows will be minimal. The size of the tank and pumps required will be confirmed at detail design and part of any required operational works and plumbing applications. The pump out system and tanks will have no impact on the basement layout. A bioretention basin will be located on the western boundary of the site with bypass flows discharging to the existing stormwater in the north west corner of the site. The treated flows and overflows will discharge to the existing external network. Stormwater treatment will be implemented to remove sediments, nutrients, gross pollutants and hydrocarbons in accordance with the requirements of Noosa Council and the State Planning Policy. Stormwater discharged from site is proposed to be consistent with the existing commercial development discharge. This development sits within a lot that has been allowed for in previous stormwater calculations with the overall Noosa Civic and Noosa Business Centre discharging to large overland flow paths and creeks, therefore no detention is proposed for this development as per the existing centre. The proposed conceptual stormwater drainage layout is depicted on MPN Plan 8662-CP.1.01 attached in Appendix 3. 4.5.2 Stormwater Quantity Management Strategy The proposed development site will connect into the existing drainage system for the Noosa Civic Shopping Centre and Hofmann Drive drainage system. The sites minor flows will run through the existing pipe system whilst the major overflows will overland flow down the internal roads prior to discharging to the creek to the south of the site in accordance with the overall Noosa Civic and Noosa Business Centre development. There will be no impacts to external properties as a result of the development flows through the internal site system. The proposed development site has existing stormwater infrastructure which will be utilised for the Medihub development, with additional stormwater pits constructed as part of the subdivision works currently under construction. Excellence with Economy in Engineering 9 l:\8000-8999\8600-8699\8662\reports\12-05-22 stormwater management plan_issue b.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Appendix B Civil Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.