Skip to the record
Every meeting, every word.

Council archive · source document

SUPERDEDED Compiled Approved Plans for OPW20-0145.04 · OPW20/0145.04

of 217

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (69.3 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 33, section 1. The text section number identifies this passage in the reader.

   LEGEND:
                                                                                                                                                                                                                                                                                                                                                               -
                                                                                                                                                                                                                                                                                                                                                 NOOSA COUNCIL
   B1     BARRIER KERB (B1 TYPE) 450mm CHANNEL
   SM4    SEMI-MOUNTABLE TYPE
   ER2    EDGE RESTRAINT
   CH     CHANNEL 600mm WIDE
                                                                                                                                                                                                                                                                                                                                                 APPROVED PLAN
                                                                                                                                                                                                                                                                                                                                              OPW20/0145 17 DEC 2020




                                                                                                                                                                                              3.895




                                                                                                                                                                                                                                                                                                BDY
                                                                                                                                                                                                                                                                       3.491
                                                                                                                                                        LOT EARTHWORKS                                     2.5%            2.5%           -2.5%         -2.5%
                                                                                                                                                                                                                                                                                      1:-




                                                                                                                                                                                                                                                                                                      1m
                                                                                                                                                                                      ER2                                                                                                   2




                                                                                                                                                                                                                                                                                                 11 68
                                                                                                                                                                                                                                                                                B1




                                                                                                                                                                                                                                                                                                   .15
                                                                                                                                                                                                                                                                                                 2.4
                                                                                                                                                                                                                                                                                                              Datum 2
                                                                                                                                                                                                                                                                                                              Centreline R.L.3.688
                                                                                                                                                                                                                              CH180.000




                                                                                                                                                                                              4.148




                                                                                                                                                                                                                                                                                                BDY
                                                                                                                                                                                                                                                                       3.752
                                                                                                                                                                                                           2.5%            2.5%           -2.5%         -2.5%
                                                                                                                                                                                                                                                                                      1:-
                                                                                                                                                                                                                                                                                          2




                                                                                                                                                                                                                                                                                                           1m
                                                                                                                                                                                      ER2                                                                                       B1




                                                                                                                                                                                                                                                                                                      11 91
                                                                                                                                                                                                                                                                                                        .47
                                                                                                                                                                                                                                                                                                      2.4
                                                                                                                                                                                                                                                                                                        Datum 2
                                                                                                                                                                                                                                                                                                        Centreline R.L.3.942
                                                                                                                                                                                                                              CH140.000




                                                                                                                                                                                              4.349




                                                                                                                                                                                                                                                                                                BDY
                                                                                                                                                                                                                                                                       3.953
                                                                                                                                                         LOT EARTHWORKS                                    2.5%            2.5%           -2.5%         -2.5%
                                                                                                                                                                                                                                                                                      1:-




                                                                                                                                                                                                                                                                                                            1m
                                                                                                                                                                                     ER2
                                                                                                                                                                                                                                                                                B1          2            59
                                                                                                                                                                                                                                                                                                      2.8




                                                                                                                                                                                                                                                                                                         .24
                                                                                                                                                                                                                                                                                                       11
                                                                                                                                                                                                                                                                                                      Datum 2
                                                                                                                                                                                                                                                                                                      Centreline R.L.4.143
                                                                                                                                                                                                                              CH120.000
                                                                                                                                                                                              4.669




                                                                                                                                                                                                                                                                                                BDY
                                                                                                                                                                                                                                                                       4.272
                                                                                                                                                    LOT EARTHWORKS                                         2.5%            2.5%           -2.5%         -2.5%
                                                                                                                                                                                    ER2                                                                                               1:-




                                                                                                                                                                                                                                                                                                      0m
                                                                                                                                                                                                                                                                                            2




                                                                                                                                                                                                                                                                                                 11 05
                                                                                                                                                                                                                                                                                B1




                                                                                                                                                                                                                                                                                                   .20
                                                                                                                                                                                                                                                                                                 3.2
                                                                                                                                                                                                                                                                                                      Datum 3
                                                                                                                                                                                                                                                                                                      Centreline R.L.4.462
                                                                                                                                                                                                                              CH80.000

                                                                                                                                                                                                           5.4m                                         5.4m
                                                                                                                                                                                                         CARPARK                   6.2m               CARPARK                        3m
                                                                                                                                                                                              4.878




                                                                                                                                                                                                                                                                       4.476




                                                                                                                                                                                                                                                                                                BDY
                                                                                                                                                        LOT EARTHWORKS                                     2.5%            2.5%           -2.5%         -2.5%
                                                                                                                                                                                                                                                                                      1:-
                                                                                                                                                                                      ER2                                                                                                   2




                                                                                                                                                                                                                                                                                                           0m
                                                                                                                                                                                                                                                                                B1




                                                                                                                                                                                                                                                                                                      11 75
                                                                                                                                                                                                                                                                                                        .50
                                                                                                                                                                                                                                                                                                      3.1
                                                                                                                                                                                                                                                                                                        Datum 2
                                                                                                                                                                                                                                                                                                        Centreline R.L.4.666
                                                                                                                                                                                                                              CH40.000
                                                                                                                                                                                                                                                                                                                             PROJECT:                                  JOB NUMBER
  REV DATE DESCRIPTION                                                    BY   CHKD                                                           SCALE                                                        APPROVED                                                                                                         PROPOSED SUBDIVISION                            1856
   A     13-09-19   FOR APPROVAL                                          MM    CL                                                                                                                                                                                                                                          AT NOOSA CIVIC, WALTER HAY DRIVE
   B     25-08-20   REVISED FOR APPROVAL - WALTER HAY DRIVE TURN AROUND   MM    CL    DATUM           AHD                                                                                                                                                                                                                                                          SHEET:   26   OF   42
                                                                                                                 0              2               4              6              8               10m                                                                                                                           FOR STOCKWELL PTY LTD
   C
   D
         21-09-20
         15/10/20
                    REVISED FOR NOOSA COUNCIL DRAFT CONDITIONS
                    REVISED AS PER COUNCIL RFI [29/09/20]
                                                                          MM
                                                                          MM
                                                                                CL
                                                                                CL
                                                                                      DESIGN         MM                                                                                                   .................                                                                                                                                        DRAWING NUMBER      REV
                                                                                                                                                                                                                                                                                                                             DRAWING TITLE:
   E     23/11/20   REVISED AS PER COUNCIL RFI MEETING                    MM    CL    DRAWN          MM                                                                                               Director: CAMERON LANDRETH
                                                                                      DESIGN CHECK
                                                                                                                                              SCALE 1:200 A3
                                                                                                                                                                                                            (RPEQ 19358)                          p 07 5443 8285                                                            LOT 10-15 CROSS SECTIONS                   R55                 E
                                                                                                      CL
                                                                                                                                                                                                                                                  e [email protected] w www.barlowshelley.com.au
                                                                                      DATE           13-09-19
                                                                                                                This drawing is not to be copied or amended without written permission from
                                                                                                                Barlow Shelley Consulting Engineers                                                                                               a PO Box 899, Maroochydore,4558 ABN 89 215 591 077                        SHEET 1 OF 2


Document Set ID: 21426255
Version: 1, Version Date: 24/03/2021

Used in these records

About this file

File size
69.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERDEDED Compiled Approved Plans for OPW20-0145.04 .pdf · 69.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.