Council archive · source document
Delegated Report - Code - Planning OPW25 0057 · OPW25/0057
C100 D Bulk Earthworks – Phase 1 Site Strip and 24/03/2025
Remedial Works, prepared by, Covey
C101 D Bulk Earthworks – Phase 2 Cut and Fill, 24/03/2025
prepared by, Covey
C121 D Earthworks Sections – Sheet 2, prepared 24/03/2025
by, Covey
C200 D Road 1 & 2 Longitudinal Sections, prepared 24/03/2025
by, Covey
C201 D Lake Macdonald Dr Longitudinal Section, 24/03/2025
prepared by, Covey
C220 E Road 1 Cross Sections – Sheet 1, prepared 17/06/2025
by, Covey
C221 D Road 1 Cross Sections – Sheet 2, prepared 24/03/2025
by, Covey
C222 D Lake Macdonald Dr Cross Sections – Sheet, 24/03/2025
prepared by, Covey 1
C223 D Lake Macdonald Dr Cross Sections – Sheet 24/03/2025
1, prepared by, Covey
C240 E Road 1 Detail Plan – Sheet 1, prepared by, 17/06/2025
Covey
C241 E Road 1 Detail Plan – Sheet 2, prepared by, 17/06/2025
Covey
C242 D Road 1 Detail Plan – Sheet 3, prepared by, 24/03/2025
Covey
C243 D Road 1 Detail Plan – Sheet 4, prepared by, 24/03/2025
Covey
C244 C Kerb & Tee Longitudinal Sections, prepared 24/03/2025
by, Covey
C250 E Road 1 Detail Plan – Sheet 4, prepared by, 24/03/2025
Covey
C250 E External Roadworks Detail – Sheet 1, 17/06/2025
prepared by, Covey
C251 D External Roadworks Detail – Sheet 2, 24/03/2025
prepared by, Covey
C252 D External Road Linemarking Plan, prepared 24/03/2025
by, Covey
C260 D Typical Road Details, prepared by, Covey 24/03/2025
Page 7 of 23
Document Set ID: 23977399
Version: 6, Version Date: 22/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW25 0057.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.