Skip to the record
Beware of cheap imitations.

Council archive · source document

Delegated Report - Code - Planning OPW25 0057 · OPW25/0057

of 23

Text shows just the words. Original shows the document exactly as it was published.

                         C100          D   Bulk Earthworks – Phase 1 Site Strip and 24/03/2025
                                           Remedial Works, prepared by, Covey

                         C101          D   Bulk Earthworks – Phase 2 Cut and Fill, 24/03/2025
                                           prepared by, Covey

                         C121          D   Earthworks Sections – Sheet 2, prepared 24/03/2025
                                           by, Covey

                         C200          D   Road 1 & 2 Longitudinal Sections, prepared 24/03/2025
                                           by, Covey

                         C201          D   Lake Macdonald Dr Longitudinal Section, 24/03/2025
                                           prepared by, Covey

                         C220          E   Road 1 Cross Sections – Sheet 1, prepared 17/06/2025
                                           by, Covey

                         C221          D   Road 1 Cross Sections – Sheet 2, prepared 24/03/2025
                                           by, Covey

                         C222          D   Lake Macdonald Dr Cross Sections – Sheet, 24/03/2025
                                           prepared by, Covey 1

                         C223          D   Lake Macdonald Dr Cross Sections – Sheet 24/03/2025
                                           1, prepared by, Covey

                         C240          E   Road 1 Detail Plan – Sheet 1, prepared by, 17/06/2025
                                           Covey

                         C241          E   Road 1 Detail Plan – Sheet 2, prepared by, 17/06/2025
                                           Covey

                         C242          D   Road 1 Detail Plan – Sheet 3, prepared by, 24/03/2025
                                           Covey

                         C243          D   Road 1 Detail Plan – Sheet 4, prepared by, 24/03/2025
                                           Covey

                         C244          C   Kerb & Tee Longitudinal Sections, prepared 24/03/2025
                                           by, Covey

                         C250          E   Road 1 Detail Plan – Sheet 4, prepared by, 24/03/2025
                                           Covey

                         C250          E   External Roadworks Detail – Sheet 1, 17/06/2025
                                           prepared by, Covey

                         C251          D   External Roadworks Detail – Sheet 2, 24/03/2025
                                           prepared by, Covey

                         C252          D   External Road Linemarking Plan, prepared 24/03/2025
                                           by, Covey

                         C260          D   Typical Road Details, prepared by, Covey   24/03/2025


                                                                                        Page 7 of 23

Document Set ID: 23977399
Version: 6, Version Date: 22/08/2025

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning OPW25 0057.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.