Council archive · source document
OPW14/0362 Operational Works for reconstruction of stormwater pit
catchpit, manhole and pipeline locations drainage details (if applicable) cross road drainage culverts (if applicable) concrete footpaths and cycle paths location and details for access points, ramps and invert crossings changes in surfacing material. Applications for operational work involving stormwater drainage Drawings showing: xX Confirmed Mail existing and proposed contours CL Not applicable e drainage locations, diameters and class of pipe, open drains and easements e manhole location, chainage and offset or coordinates and inlet and outlet invert levels e inlet pit locations, chainage and offset or coordinates and invert and kerb levels. Applications for operational work involving water reticulation Drawings showing: (_] Confirmed e kerb lines or edge of pavement where kerb is not constructed Not applicable e location and levels of other utility services where affected by water reticulation works pipe diameter, type of pipe and pipe alignment water main alignments water supply pump station details (if applicable) minor reservoir details (if applicable) conduits location of valves and fire hydrants location of house connections (if applicable) location of bench marks and reference pegs. Applications for operational work involving sewerage reticulation Drawings showing: L] Confirmed location of all existing and proposed services xX Not applicable location of all existing and proposed sewer lines and manhole locations location of all house connection branches kerb lines or edge of pavement where kerb is not constructed chainages design sewer invert levels design top of manhole levels type of manhole and manhole cover pipe diameter, type of pipe and pipe alignment location of house connections (if applicable) sewer pump station details (if applicable). Applications for operational work involving street lighting Drawings showing: (_] Confirmed location of all light poles and service conduits Not applicable location of all other cross road conduits type of wattage and lighting any traffic calming devices additional plans for roundabouts and major roads (if applicable) details of any variations to normal alignment IDAS form 6—Building or operational work assessable against a planning scheme Version 3.0—1 July 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW14/0362 Operational Works for reconstruction of stormwater pitRelated documentApplication case desk ↗
About this file
- File size
- 2.0 MB (small file)
- File type
No other editions are linked here.