Skip to the record
Search everything, all in one place.

Council archive · source document

OPW14/0362 Operational Works for reconstruction of stormwater pit

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

1.3 Does any of the proposed operational work involve taking or interfering with:
e water from a watercourse, lake or spring, or from a dam constructed on a watercourse or lake
¢ artesian water as defined under the Water Act 2000, schedule 4
e overland flow water
. ©  subartesian water

 

 

Xx]

No ¢ Continue to question 1.4

 

 

L] Yes |* Complete part 4 of this checklist

 

 

1.4 Is the operational work the construction of a dam, or carried out in relation to a dam, and, because of the
works, the dam must be failure impact assessed?

 

 

Dx] No ¢ Continue to question 1.5

 

L] Yes | Complete part 5 of this checklist

 

 

1.5 Is any of the proposed operational work tidal works?

 

 

Dx] No ¢ Continue to question 1.6

 

 

[-] Yes |« Complete part 6 of this checklist

 

 

1.6 Is any of the operational work proposed to be carried out completely or partly within a coastal
management district?

 

 

No ¢ Continue to question 1.7

 

OX

Yes |e Complete part 7 of this checklist

 

 

1.7 Is any of the proposed operational work for constructing or raising waterway barrier works as defined
under the Fisheries Act 1994?

 

 

Dx] No e Continue to question 1.8

 

 

[_] Yes | + Complete part 8 of this checklist

 

 

1.8 Is any of the proposed operational work to be carried out completely or partly within a declared fish
habitat area as defined under the Fisheries Act 1994?

 

 

No ¢ Continue to question 1.9

 

[] Yes | Complete part 9 of this checklist

 

 

 

1.9 Is any of the proposed operational work removing, destroying or damaging marine plants as defined
under the Fisheries Act 1994?

 

 

IX] No e Continue to question 1.10

 

[] Yes |e Complete part 10 of this checklist

 

 

1.10 Does the proposal involve operational works that are high impact earthworks in the Great Barrier Reef
Wetland Protection Area?

 

 

 

[X]| No e Continue to question 1.11

 

 

 

 

Checklist 4—Operational work
Version 4.1—1 October 2014

 

Used in these records

About this file

File size
2.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW14_0362 Operational Works for reconstruction of stormwater pit.pdf · 2.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.