10/0819 - Operational Works - Jetty [As Published] · 142010.819

of 17

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

Integrated|DevelopmentiAssessment[Systempormy

 

 

 

 

 

 

 

 

 

Application Details - IDAS form 1

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

You MUST complete ALL questions unless the form indicates otherwise. incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.

For all development applications, you must:
« complete this form (Application details - IDAS form 1)
* complete any other forms relevant to your application

. provide any mandatory supporting information identified on the forms as being required to accompany your
application. .

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable.
Planning Regulation 2009.

 

 

Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)

 

 

Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.

 

Name/s (individual or company name in full) _ [Noosa Jetty Builders

 

 

For companies, contact name
Postal address

Contact phone number

Mobile number (non-mandatory)
Fax number (non-mandatory)

e-mail address (non-mandatory)

Danny Reed

 

 

PO Box 299 Noosaville

 

 

10408137526

 

 

 

 

54743480

 

 

 

[email protected]

 

 

 

 

1. What is the nature of development proposed? (tick all applicable boxes)

 

 

[Cs material change of use of premises
building work
(1 operational work

[]_ teconfiguring a fot

 

Development Counter
. ~J JUN 2010

 

 

 

Tewantin fk

 

7

 

Deparimentof Infrastructure and Planning

 

 

“Queensland
. Overnmenit

 

 
Full text of the other 16 pages

Page 2

Oo

 

 

2. What type of approval is being sought?

 

 

{]_ development permit

(1 preliminary approval
()_ both - provide details below

 

 

13. Is the application for a mobile and temporary environmentally relevant activity (ERA)?

 

 

—] No

(1 Yes - complete table A and then go to question 5

 

4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)

 

 

Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises

 

 

 

Street Address Lot on plan
. description
- Local government area
Unit | Street Street name and official Post Lot No Plan type (e.g. Logan,Cairns)
No. | No. suburb/locality name code “| and plan no.
1 41 | Sunseeker ert 4566 |167 |RPB45980 | Sunshine coast regional

 

 

 

 

 

 

 

 

 

(]Street address / lot on plan

Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)

Table C - premises coordinates (appropriate for development in remote areas, over part of a tot or in water e.g.
channel! dredging in Moreton Bay)

 

 

 

 

Coordinates (note: place each set of
coordinates in a separate row) Zone Datum Local government
Easting | Northing | Latitude | Longitude | "ference area (If applicable)
LJ GDA94
CL] wesse4
(J other

 

 

 

 

 

 

 

 

 

 

5. Total area of the premises on which the development is proposed (indicate hectares or m?)

 

707m2

6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)

 

 

 

 

1 | duplex

 

 

 

 

7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)

 

Timber jetty and floating Boat Lift

 

 

 

 

Application Details - IDAS form 1 ‘
Version 1.0 18 December 2009

Page 3

 

SHER. se = —

 

8. Is owner's consent required for this application? (refer to notes at the end of this form for more information) | -

 

 

 

(] No

Yes - complete either table D, table E or table F as applicable

 

 

 

 

Table D (note: do not complete this table if lodging the application on-line using Smart eDA)

 

 

. lan Priestley
Name of owner/s of the land Jan Priestley

 

 

 

 

Robin Paton yo
We, the above-mentioned owner/s of the land, consent to the making of this application. ,
=a

Signature of owner/s of the land) \. e.? ; se Khon, Col oe
Date U a\ W}to .

ble E

 

 

 

 

 

 

 

 

Name of owner/s of the land |

 

(C) The owner's written consent is attached or will be provided separately to the assessment manager

 

 

Table F

 

 

Name of owner/s of the land

 

 

oO By making this application, |, the applicant, declare that the owner has given written consent to the making of
the application. ‘

 

 

9. Does the application involve a State resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)

 

 

@* No LlYes - complete table G

 

40. Identify if any of the following apply to the premises (tick applicable box/es) -

 

 

 

<a adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
{) on strategic port land under the Transport Infrastructure Act 1994 - complete tabie |

(1 __ ina tidal water area - complete table J

 

Table H Name of water body, watercourse or aquifer

 

4 |Noosa Waters

 

 

 

 

 

44. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.) ™ .

 

 

 

No [_] Yes - ensure the type, location and dimension of each easement is included in the plans submitted

 

Application Details - IDAS form 4
Vareinn 1 0 18 Necember 2009

Page 4

ooo

 

 

12. Does the proposal include new building work or operational work on the premises? (including any
services)

 

(JNo {Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted

 

13. ls the payment of a portable Jong service leave levy applicable to this application? (refer to the notes at the
end of this form for more information)

 

 

[x] No - Go to question 15 CJ Yes

 

15. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?

 

 

XX) No
(Yes - provide detaits below ”

 

16. List below all of the forms and supporting information that accompany this application (include ail IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA) .

 

 

Method of lodgement to

Description of attachment or title of attachment assessment manager

 

1 jformé over the counter

 

2 }check list

 

 

 

 

 

17. Applicant's deciaration

 

 

x By making this application, | declare that ail information in this application is true and correct (note: it is
unlawful to provide false or misleading information).

 

 

 

Application Details - DAS form 1
Version 1.0 18 December 2009

 

 

 

Page 5

LET). ;

Notes for completing this form

Question 8:

¢ Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.

¢ Owner's consent is not required for a mobile and temporary ERA.

Question 9: :

¢ Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.

Question 13:

© The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
{ong service leave levy is payable.

¢ The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14:

* The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued. :

¢ Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at

www.gleave.qid.gov. au. For further information contact QLeave on 1800 803 481 or www.gleave.ald.gov.au.

Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.

 

OFFICE USE ONLY

 

 

 

 

 

 

Date received 4 [vu he Reference numbers (o [ AA

 

 

NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER

 

 

 

 

 

To: Council. | have been engaged as the private certifier for the
. building work referred to in this application.
Date of N BSA Certification Building
jame : ae
engagement : license number classification/s

 

 

 

 

 

 

 

Application Details - DAS form 1
Version 1.0 18 December 2009

 

Page 6

Mo ee

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)

 

Date receipted
form sighted by|Name of officer who
assessment sighted the form

manager

QlLeave Project |Amount

Description of the work Number paid (3)

Date paid

 

1

 

 

 

 

 

 

 

 

 

The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies. : .

 

Application Details - IDAS form 1
Version 1.0 18 December 2009

Page 7

 

 

 

 

 

 

Integrated|Development’Assessment[systemyorm]

 

 

 

 

 

Building or operational work assessable
against a planning scheme - IDAS form 6

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

This form must be completed for development applications for building works or operational work assessable against
a planning scheme.

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.

For all development applications, you must:
¢ — complete Applicant details - IDAS form 1

« — complete any other forms relevant to your application

* provide any mandatory supporting information identified on the forms as being required to accompany your
application.

e@ All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.

 

 

1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)

 

 

building work - complete table A (J) operational work - complete table B

 

Table A

What is the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering,
underpinning, moving or demolishing a building)?

 

jetty

 

@ What type of approval is being sought? (if you have indicated multiple works in the above question, please generate
another Table A to detail each approval request)

{J development permit (J preliminary approval

Are there any current approvals associated with this application? (e.g. material change of use)

No (CYes - provide details below

 

 

2. What is the dollar value of the proposed building work? (inc GST, materials and labour)| $ 18,500

 

 

 

 

 

Department of Infrastructure and Planning @in

 

 

 

 

Page 8

‘ ’

ee -— oe ee

3. Confirm the following mandatory supporting information accompanies this application

 

 

 

Confirmation

of lodgement Method of lodgement

 

|All applications for operational works

 

site plans drawn to scale which show the following:

@ the location and site area of the land to which the application relates
(relevant land) :

* the north point .

@ the boundaries of the relevant land

@ the allotment layout showing existing lots, any proposed lots (including
the dimensions of those lots), existing or proposed road reserves, {confirmed jover the counter
building envelopes and existing or proposed open space (note:
numbering is required for all lots)

je any existing or proposed easements on the relevant land and their
function

@ any access limitation strips
all existing and proposed roads and access points on the relevant land

 

a statement about how the proposed development addresses the focal .
e@ government's planning schemes and any other planning documents [|confirmed | over the counter
relevant to the application

 

Applications for operational works involving earthworks (filling and excavating)

 

drawings showing:

existing and proposed contours

areas to be cut and filled

# the location and level of any permanent survey marks or reference
stations used as datum for the works [confirmed electronic

e the location of any proposed retaining walls on the relevant land and
their height

* the defined flood level (if applicable)

e the defined fill level (if applicable)

 

Applications for operational works involving roadworks

 

drawings showing:

¢ existing and proposed contours

@ « the centreline or construction line showing chainages, bearings, offsets
if the construction line is not the centreline of the road and all
intersection points

e information for each curve including tangent point chainages and

_ offsets, curve radii, arc length, tangent length, superelevation (if

applicable) and curve widening (if applicable)

kerb lines including kerb radii (where not parallel to centreline) and

tangent point changes (where not paratlel to centreline)

edge of pavement where kerb is not constructed {_] confirmed

position and extent of channelisation

location and details of all traffic signs, guideposts, guardrail and other

street furniture

pavement markings including details on raised pavement markers

catchpit, manhole and pipeline locations

drainage details (if applicable)

cross road drainage culverts (if applicable)

concrete footpaths and cycle paths

location and details for access points, ramps and invert crossings

changes in surfacing material ,

 

 

 

 

Building and operational work assessable against a planning scheme - IDAS form 6
, Version 1.0 18 December 2009

 

Page 9

 

OI

 

Confirmation
of lodgement

Method of lodgement

 

Applications for operational works involving stormwater drainage

 

drawings showing:

e existing and proposed contours

« drainage focations, diameters and class of pipe, open drains and
easements

« manhole location, chainage and offset or co-ordinates and inlet and
outlet invert levels

¢ inlet pit locations, chainage and offset or co-ordinates and invert and
kerb levels

[_|confirmed

 

Applications for operational works involving water reticulation

 

drawings showing:

kerb lines or edge of pavement where kerb is not constructed
* location and levels of other utility services where affected by water
reticulation works

pipe diameter, type of pipe and pipe alignment

water main alignments

water supply pump station details (if applicable)

minor reservoir details (if applicable)

conduits

location of valves and fire hydrants

tocation of house connections (if applicable)

location of bench marks and reference pegs

(CO confirmed

 

Applications for operational works involving sewerage reticulation

 

drawings showing:
location of ali existing and proposed services

location of all house connection branches

kerb lines or edge of pavement where kerb is not constructed
chainages

design sewer invert levels

design top of manhole tevels

type of manhole and manhole cover

pipe diameter, type of pipe and pipe alignment

location of house connections (if applicable)

sewer pump station details (if applicable)

location of all existing and proposed sewer lines and manhole locations

[_|confirmed

 

Applications for operational works involving street lighting

 

drawings showing:

location of all light poles and service conduits

location of all other cross road conduits

type of wattage and lighting

any traffic calming devices

additional plans for roundabouts and major roads (if applicable)
details of any variations to normal alignment

details of lighting levels

(confirmed

 

 

 

 

 

Building and operational work assessable against a planning scheme - IDAS form 6
Version 1.0 18 December 2009

Page 10

 

Confirmation
of lodgement

Method of lodgement

 

Applications for operational works involving public utility services

 

drawings showing:

* any existing light poles and power poles
e any existing underground services

'* details of proposed services

® alternation to existing services

[_lconfirmed

 

Applications for operationai works involving landscaping works

 

drawings showing:

e the location of proposed plant species

© aplant schedule indicating common and botanical names, pot sizes
and numbers of plants :

¢ planting bed preparation details including topsoil depth, subgrade

preparation, mulch type and depth, type of turf, pebble, paving and

garden edge

the location and type of any existing trees to be retained

construction details of planter boxes, retaining wails and fences

the proposed maintenance period

irrigation system details

 

L_]confirmed

 

 

 

Notes for compteting this form:

e This form can also be used for development applications for building works or operational works assessable
against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is

mentioned, take it to mean the land use plan for the airport land.

Privacy -please refer to your assessment manager for further details on the use of information recorded in

this form.

 

OFFICE USE ONLY

 

 

 

 

 

Date Received Reference Numbers

 

 

 

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.

 

Building and operational work assessable against a planning scheme - IDAS form 6

Version 1.0 18 December 2009

 

Page 11

 

 

 

 

 

 

 

de

 

 

iis = |. +.

 

 

Development assessment checklist - IDAS
checklist 1 _

{Sustainable Planning Act 2009, version 1.0 18 December 2009)
This checklist applies to the carrying out of development generally.

You are not required to complete this checklist as part of your development application, however you may submit the
checklist with your application if you wish. The purpose of the checklist is to assist you in identifying:

* whether you need to make a development application for the proposed development
+ if a development application is required, the relevant IDAS forms you need to complete as part of your application
* whether you need to give a copy of your application to any referral agencies.

if your development involves a material change of use, reconfiguring a lot or operational works, it is recommended
that you complete Material change of use - IDAS checklist 2, Reconfiguring a lot - IDAS checklist 3 or Operational
works - IDAS checklist 4, as applicable.

If you are unsure how to answer any questions on this checklist, phone or visit your focal government, or go to the
Department of Infrastructure and Planning's website at www.dip.qid.gov.au.

All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.

 

Part 1 - General questions

 

 

1.1 Have you received a referral agency response in retation to this proposed development prior to making
an application?

 

 

KJNo

 

yes | To assist you in preparing your application, completing Referral agency responses - IDAS checklist
6 is recommended

 

 

1.2 Do you wish the proposed development to be assessed against a superseded planning scheme?

 

 

KI No

 

. You must complete Request to apply a superseded planning scheme - Sustainable Planning Act
Yes form 2 and give this notice to the relevant local government. If the local government agrees to
your request, details must be provided in Application details - IDAS form 1

 

 

 

1.3 Does the proposal involve removing quarry material from a watercourse or lake for which an allocation
notice is required under the Water Act 2000?

 

 

{x]No

 

E]Yes | — It is recommended that you complete part 2 of this checklist

 

 

1.4 Is any part of the proposed development intended to be carried out on a Queensland heritage place under
the Queensland Heritage Act 1992? ,

 

 

B.No |

 

It is recommended that you complete part 3 of this checklist

CJ Yes

 

 

 

Department of Infrastructure and Planning Gin

 

eensiand
CeW7-Fai lea lesal a

 

 

 

 

 

Page 12

2

 

1.5 Does the proposal involve development on a local heritage place?

 

 

BaNo

ClYes |- It is recommended that you complete part 4 of this checklist

 

 

 

 

1.6 Does the proposal involve an environmentally relevant activity, other than an agricultural ERA, a mining
activity or a chapter 5A activity 7

BX] No

L]Yes | It is recommended that you complete part 5 of this checklist

 

 

 

 

 

 

1.7 ls any part of the development on strategic port fand or airport land (other than development for a
material change of use that is inconsistent with the land use pian for the strategic port land or airport land)

 

 

(No
OYes | It is recommended that you compiete part 6 of this checklist

 

 

 

 

1.8 Is any part of the development on land below a high water mark within the limits of a port under the
Transport Infrastructure Act 1994?

[x] No

Ll Yes |} It is recommended that you complete part 7 of this checklist

 

 

 

 

 

1.9 Is any part of the premises designated for community infrastructure?

 

 

 

 

 

 

 

 

[Xx] No

LlYes |- It is recommended that you complete part 8 of this checklist

1.10 Does the proposal involve the establishment or expansion of a waste water disposal system?
—XJNo

Ll Yes | It is recommended that you complete part 9 of this checklist

 

 

 

1.11 Is the development on land that adjoins a declared fish habitat area under the Fisheries Act 1994?

 

 

No
OYes |- It is recommended that you complete part 10 of this checklist

 

 

 

 

Privacy - please refer to your assessment manager for further details on the use of information recorded in
this checklist.

Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this
checklist and provided as part of this process will be of assistance to you, it is provided on the basis that you will
not rely on the information without first making your own enquiries regarding the interpretation and application of
the applicable legislation to your circumstances.

To the full extent permitted by law DIP. expressly disclaims alll liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or
other consequence which may arise from your reliance on this process and the information contained on this
checklist.

 

Development application assessment checklist - DAS checklist 1
Version 1.0 18 December 2009

 

Page 13

—____-- fie oo

 

OFFICE USE ONLY

 

 

Date received

 

 

 

 

Reference numbers

 

 

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.

 

Development application assessment checklist - DAS checklist 1

Version 1.0 18 December 2009

Page 14

 

 

 

@ €£Z-PORT

GRAPHIC

 

 

 

 

 

 

LitT ALS

 

 

 

@FLIP-UP CLEAT

NOTE:

 

 

LI]

ST

LJ

ery

 

 

 

 

 

 

 

i

 

L

 

ra

 

SECTION A-A |

@)12" ROLLER

POSITION ALL ROLLERS IN THE LOWEST POSITION

65,7665+0.875

    

[208014PH

@)18" ROLLER

 

 

 

 

 

 

 

@ GRAPHIC MIG

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

p=
q
77,.6875+40.5000
q
r=
14} 1 | 008808 {EZ DOCK BAR CODE GRAPHIC
13] 12 | BOS14SS [BOLT 5/16T18X1~174
32 | 12 | S32050_ JSPACERS BLACK POLY
u | 8 | 60575SsjBOLT $/16~18x3/4
10] 1 | 0085S _|GRAPHIC EZ~PORT USE
9 | 20] 110236 [NUT S/16° 4 PRONG
8 | 500] 220221 |ROTOMOLD RESIN LOW DENSITY
7_| 0,83) 120222E4 PIGMENT, EZ-DOCK BEIGE
6 | 40; 60100 BRASS INSERT 5/16°X16 CLOSED
5S | 4 [103547 {SPIN WELDS
4 | 2 | 00844 [GRAPHIC MOLD-IN, EZPORT 4
3 | 3 | Sesoi2 [12° KEEL ROLLER
2 41 | Sesoie jie" KEEL ROLLER
1 1 | S27060 [FLIP-UP CLEAT
FTEM | QTY. {PART NO. | DESCRIPTION .
BILL OF MATERIAL
EZ-Deck, INC.
8768 HWY 60
Monett, MO 65708
1-888-084-8168
- FAX: 497/235-2252
EZ-PORT 4 so” xX 14’

 

 

7 TOLERANCES

 

 

 

 

 

  

   

PWC DOCK SECTION

    

LOPE POLYETHLENE

 

 

 

 

€_{6080|BAR CODE GRAPHIC UPDATE lo2715706)0RI UAL
8 _[5186|CHANGED POSITION OF ROLLERS 04—27—04DUS rT 4043002 | NATURAL COLOR
A [S014 /RELEASE, NEW PRINT lo2/14/04/DUSTN CABLE. FOR a —
Rev.| ecw | DESCRIPTION OF REVISION ecr| pate | py | PURCHASED ITEWS)

 

 

 

 

 

 

    

 

 

Page 15

 

Regional Council

 

Sunshine Coast LAND USE SECTION FEES

 

 

 

 

 

 

 

. CIVICA TYPE RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme Documentation 520:
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation _ 111
APPLICATION FEES
Material Change of Use - Code/Impact MCU
Consistent 521
Inconsistent 521
Assessment under Superseded Planning Scheme : 521
’ Modification to a Development Permit MOD DP . 521
Extension of a Currency Period 521
Lot Reconfiguration RECONFIG 521
Bldg Work assessable against the Planning Scheme 521
@ LODGEMENT REVIEW
Half Hour §22
One Hour §22
ADVERTISING __
: + Purchase Advertised Applications §23
JETTIES
’ Jetty Application Fee V2 524
- Jetty Bond Sea « 54 ‘
(Category 4)
BONDS
Performance Bond 51
(Category 9)
SEARCH FEE .
Search of Land Use Section file 112
/ Liquor Licensing Request 113
TOTAL $ Irmo
NAME: ( o- forsee, « K Paton
ADDRESS: fo Boye 172) 9
AR ee ASA S USLT
FILE NO: eo) AS DATE: sp /tofiy :
qT - v 7 7 .
RECEIPT NO: ©27299 Signature of TP Officer: f2 nae 3
AUTHORITY NO:

 

NH[ree/ mf

1 Suck see hen Ce

Page 16

CALCULATION OF FEES

 

APPLICATION

FEE

TOTAL
FEES

 

MCU - CODE ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

MCU - IMPACT ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

>

FEE CALCULATION

‘
‘ ‘

 

OPERATIONAL WORKS
Details of Development |

FEE CALCULATION

 

 

 

TOTAL FEES

 

 

 

Page 17

 

PILES:
ALL PILES SHALL BE APPROVED HARDWOOD
AND TREATED TO HAZARD 6.

ALL PILES SHALL BE INSTALLED IN ACCORDANCE
WITH AS 2159 - PILING CODE

          
   
  
 
 

  
 

JETTY USE:
SINGLE USER, PRIVATE
NO VEHICULAR ACCESS

WALKWAY DECK VERTICAL
DESIGN LIVE LOAD - 2.0 kPa
MAXIMUM MOORED VESSEL - 5m
BERTHING VELOCITY - 0.5 m/sec

SUNSEEKER CLOSE

 

| ELEVATION 2

WCKER:

75 x 38 HWO

‘UT6 x No14 TYPE 17
STAINLESS STEEL

SCREWS @ 450 CRS

LOT 167

   
 

PLES:

@ 200 H6 MARINE HWD POLES
NOTE THAT ALL POLES TO COMPLY
WITH AS 2189 - PILING CODE

TYPICAL SECTION
™ (No.11)
- seonreiamp SUNSEEKER CLOSE
ee muse John Norden
OTE THAT ALL POLES TO COMPLY & Associates
200 x 76 HWD WAT A8 2168 - PILING CODE ACN 010 263 877

Suuchwal / Chl Design Engineers

aay \

1. UNLESS NOTED OTHERWISE ALL TIMBER SHALL BE DURABILITY CLASS 1 OF APPROVED SPECIES
AND HAVE A STRESS GRADE OF F14 MIN.

2. UNLESS NOTED OTHERWISE ALL CONSTRUCTION SHALL COMPLY WITH THE ENVIRONMENTAL
AGENCYS' OPERATIONAL POLICY - “BUILDING AND ENGINEERING STANDARDS FOR TIDAL

3. ALL STAINLESS STEEL BOLTS, RODS, ETC., SHALL BE APPROVED MARINE GRADE 316. ALL OTHER
STEELWORK INCLUDING NUTS, BOLTS, WASHERS, SCREWS, NAILS, ETC., SHALL BE HOT DIPPED
GALVANISED OR STAINLESS STEEL.

/ RP 845980 SITE PLAN 4. TOP OF PILES SHALL BE SEALED AND FULLY CAP FLASHED OR RINGED.

PARISH WEYBA X
FRAMING LAYOUT 2 COUNTY MARCH om 6. DIMENSIONS AND LEVELS SHALL NOT BE SCALED FROM THE DRAWINGS. _—
10/80-1 |

 

Used in these records

About this file

File size
915 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

10_0819 - Operational Works - Jetty [As Published].pdf · 915 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.