Skip to the record
Every meeting, every word.

Original source · versioned page text

Plans 1

Attached to the e-mail Operational Works Application OPW18/0028 - 8 Supplejack Crt Lake Macdonald.

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 

2.

| 3

 

¥€ (0,000 LTRs
MN mum
Port aloe. wale

 

 

GENERAL NOTES

ALL MATERIALS SHALL BE NEW.
FOOTING TO ENGINEER DETAILS.
FOOTINGS TO HAVE SOLID BOTTOMS
AND EVEN BEARING THROUGHOUT.
SLAB: TO ENGINEER DETAILS
UNDERLAY WITH 200mm POLYTHENE
WATERPROOF MEMBRANE AND ALL
PROTRUSIONS, CAST ON 50mm SAND
BEDDING ON APPROVED FILL
CONCRETE STRENGTH TO BE 20MPa
AT 28 DAYS, USE TERMTE CONTROL
AS PER BULDERS SPECIFICATIONS,
TIMBER FRAMING: ALL FIXINGS AS
PER CONNECTION DETAILS AND GOOD
WORKMANSHP. 2 Tita.

LININGS: AS PER BUILDERS SPECIFICATIONS.

ROOFING: COLORBOND METAL SHEET
ROOFING OR CONCRETE ROOF TILES
OVER AN APPROVED SARKING MATERIAL
AND FIXED IN ACCORDANCE WITH THE
MANUFACTURERS SPECIFICATIONS,
PLUMBER AND DRAINER: TO LOCAL,
AUTHORITY REGULATIONS,
ELECTRICIAN: TO LOCAL AUTHORITY
REGULATIONS. :

BRICKLAYER: GALVINISED WALL TIES

1 ROW AT 2 COURSES ABOVE FLASHING
LINE AND 7 ROW IN THE SECOND LAST
BED JOINT FROM TOP OF WALLAND @
‘S00ers, IN BETWEEN ON EACH STUD,
PROVIDE WEEP HOLES @ #00crs, ALONG
FLASHING,

ALL WET AREA FLOOR AND SHOWER FLOORS:

TO COMPLY WITH B.C.A. SECTION 3.8.1.
BUILDER TO CHECK AND CONFIRMALL

MEASUREMENTS PRIOR TO COMMENCEMENT
OF CONSTRUCTION, DO NOT SCALE DRAWINGS,
WRITTEN DIMENSIONS TAKE PRECEDENCE AT

ALL TIMES, STORMWATER THROUGH P.V.C.
PIPE TO LOCAL COUNCIL REGULATIONS.

15

SITE PLAN
1: 200

 

   
  

‘agetation

No: 17 2 és6,8

PH: 5443 7268

 SUNCOAST
"BUILDING APPROVALS

35
Q) FNOV 2017

ROSS BISHOP QBOG: A15666

PEVELOPMENT APPROVAL,

FOR BUILDING WORKS Pooaiarena?

 

 

     

 

 

  

 

 

 

 

 

| ag, SH- SHELF
ag a WATER & GAS SUPPLY TRA TOILET ROLL HOLDER
(i) ALL EXPOSED WATER AND GAS SUPPLY LINES TO BE METAL. UBO - UNDER-BENCH OVEN
& Fin WO - WALL OVEN
3/8 OPENINGS LEGEND - EXTERNAL
fla 27 i) DOORWINDOWS TO BE SCREENED. MAX APERTURE SIZE 2mm BV -BRICK VENEER
2 (i) VENTS/WEEPHOLES TO BE MESH COVERED TO MEET BAL |
Jo e382 . REQUIRMENTS, MAX APERTURE 2mm wl RHi- RENDERED ACOEL PANELS
LaF ie 42 (ii) DOORWINDOW FRAMES TO BE MADE OF FIRE-RESISTANT TIMBER Si] © RBB - RENDERED BLUEBOARD
zis 450x450x900 RUBBLE PIT " 7 36 (iv) GARAGE DOOR TO BE FITTED WITH NON-COMBUSTABLE WEATHERSTRIP. | = Ber een come
| 8 (INFILTRATION OVERFLOW PIT) é By ; WITH MAX 3mm GAPS 5 SA- SCYON AXON
* i 4 7 ; : ; (¥) ALL GLAZING TO COMPLY WITH REQUIREMENTS SL SCYON LINEA aNELING
“ ROOENG ie insanace
. > / :
mp i %2, (i) SKYLIGHTS TO BE MADE FROM A NON-COMBUSTABLE MATERIAL
= 3 (i) ANY ATTACHED ITEM ON ROOF (ie ANTENNA) ARE TO BE ADEQUATELY
- : ; mes SEALED TO THE ROOF TO PREVENT GAPS >3mm AND BE MADE PROPERTY
nae et FROM A NON-COMBUSTABLE MATERIAL
- nots = ge - (ii) VENTILATION OPENINGS SHALL BE FITTED WITH EMBER-GUARDS DESCRIPTION
ke, ° a BE MADE FROMA NON-COMBUSTABLE MATERIAL AND LOT) §=35 —_-SP103503
S . ne Cs HAVE A MAX APERTURE SIZE OF 2mm PARISH: NOOSA
24 A ~ — TA 8 oN (iv) SARKING/ANTICON MUST HAVE A FLAME-INDEX GREATER THAN 5, COUNTY : MARCH
of 7 {v) SARKING TO COVER ENTIRE ROOF AREA TO EDGE OF FASCIA. ey AREA: 109m?
| gS | (vi) ALL GUTTERS TO BE NON-COMBUSTABLE AND CONTAIN GUTTER-GUARD.| = |
3 (vii) ALL VALLEYS TO BE COVERED BY GUTTFR-GUARD .
z Existing
* & | & Highset ISSUE
| Be ns Timber & GI [#] Date DETAILS BY
5 E ee | 42 House = [04-08-17] NHP ISSUE DB
‘ - Well Away  |29-08-17| WD ISSUE SjB
A |29-09-17] CONST ISSUE OB
| a> 46 B /18-10-17] COUNCIL AMEND] DB.
“090
22,700. :
Own: POLY TANK ; | Ss 45 ae
Stak ; © o7 =o
PROPOSED DWELLING & “8 SHSGHARGE TO: AUSMA R®)
PAD LEVEL 97.750 ans 7 HSTP aa COKERE & CHANNEL CISUITABLE SIZED SOAKAGE PIT =“
22,700L : Wy CIQSPERSE ON SITE CUINTER ALLOTMENT DRAINAGE PIT po box 8384 (07) S442 6419
% AINWATER STORAGE TANKS [“]TO EXISTING APPROVED SYSTE adage Gee 1089000
HSTPTOBEIN oy 7s . STORAMVATER TO BE DISCHARGED SO AS TO'NOT CAUS Ausrar Group and may ote
ACCORDANCE WITH ADJOINING NERS a in part or Inwhote w wnout
EEOreSHNICALDESGN A a © STORMWATER SYSTEM TO COMPLY WITH AS3500 PART 4 6 2017 Ausmar Group
SPECIFICATION é ® ALL OTHER DETAILS #9 LOCAL GOVERNMENT WRITTEN DIMENSIONS TO
Eg “6, REQUIREMENTS = ‘TAKE PRECEDENCE OVER SCALE
° 48 a
98.25 50 Oo SITE PLAN
Owners S
oN Stain . =
Fg ENE 98.50 ; a —J | PROJECT DESCRIPTION:
7 Sy, | s Proposed Dwelling For:
98.75 : © [cuent:
58 | F— |MRR.&MRS L. WILCOX
52 % Qa
Owners PROPOSED PROPERTY POLE 5354 s rs
Stake 2 LOCATION. TO BE CONFIRMED sg , Sy FE |tor 3s as)
— —iL, 55.46 as 1 | SUPPLEJACK COURT
92°05'25" Fe Se ee Os <C_ | LAKE MacDONALD
POSITION Sa _ FF. QC | vestenep sy ausMAR
e - Ose create eee oe Q Joramey  oprown
gS - z |orawn =a
EXISTING ACCESS DRIVEWAY SUPPLEJACK COURT 55 Ss a JOB CODE
a 4 £ DATE S-RLW
gp CONSTRUCTION PLAN | SS | YW htetow
S$ _
: DRIVEWAY CROSS SECTION SEE PAGE 6. ee B | S| sucer 4 of 43

 

  

 

 

 

 

 

 

 

 

 

 
  
  
   

 

 

 
 

at

  
 
  

NB: SITE DESIGNATED BUSHFIRE PRONE
Construction in accordance with AS3959-2009,

Narth./ South / East / West /-AllL Elevations.

BAL \S to North Geuth+East:West/ All Elovatians

Refer to conditions on permit

NOTE:
BATTERS IN ACCORDANCE WITH
ENGINEERS DETAILS & NCC REQUIREMENTS

 
    
  

 

SITE COVER

SITE AREA : 4109.00 m?

DWELLING SITE COVER : 5.55 % ( 228.07m*)
OUTDOOR AREA SITE COVER: 0.95 % ( 39.12m?)
TOTAL SITE COVERAGE : 6.50 % ( 267.19m?)

 

 

BUSHFIRE REQUIREMENTS - BAL19

DESIGN IN ACCORDANCE WITH AS 3959-2009
REFER SECTION 3 & 6 FOR DETAILED REQUIREMENTS

 

 

  

 

 

 

 

 

 

LEGEND - INTERNAL

AP - APPLIANCE CUPBOARD
BC - BROOM CUPBOARD
C’BD - CUPBOARD

DP - DOWNPIPE

DW - DISHWASHER PROV.
FW- FLOOR WASTE

GAS - GAS CONNECTION

HP - HOT PLATE

HWS - HOT WATER SYSTEM
L-LINEN

MH - MANHOLE

MW - MICROWAVE PROV.

OHC - OVERHEAD CUPBOARD.
PTY - PANTRY

R-ROBE

REF - REFRIDGERATOR SPACE
RH - RANGEHOOD:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
Log in to download the original file

Plans 1.pdf · 1.7 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 12 pages

Page 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

  

 

 

 

 

 

  
    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

      

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

-—_—__ T as LEGEND - INTERNAL
#| SIZE ss 300 7335 16es 1250 + | STEEL FRAME WALLS AND TRUSSES IN ACCORDANCE | £80-cupsoaro
W1_|920 | — “= f WITH MANUFACTURERS DESIGN AND SPECIFICATION. DW- DISHWASHER PROV.
we [24D 6390 175 4980 7% = 19301751665 700 550 GAS - GAS CONNECTION
WS [62013 Gass p,m, 7 He DESIGN AND ENGINEERING TO BE PROVIDED TO HP -HOTPLATE sew
wa [211886D 3270 175 4430 LIVING 75 3798 BED 2 92 940 WC 75 1960 BATH 3595 BED 3 475| 700 CERTIFIER PRIOR TO FRAME INSTALL. CEN HOLE
HE [at a + +f fe BNE CO
a 100 | 140 POST 3030 1 3590 75 20575 SS75ACTIITY 75 52575 «S195BED4 78 SUN CCAST PTY PANTRY
WE vata | et 7 - 7 7 4 ' L REF - REFRIDGERATOR SPACE
1 TBA 375 900 223088 42018002385 soe 460 1800 2410 E_.LDING APPROVALS Seer
__| fr a 7 # 47 ; TR- TOWEL RAIL
wi0 [213086D No: 172468 03 TRH - TOILET ROLL HOLDER
: : 3 NOV 2017 UBO - UNDER-BENCH OVEN
W11 |2131SGD DAD2131 WO - WALL OVEN
(2130h & rebated (AS ROSS BISHOP BOC: A1sAg6 LEGEND - EXTERNAL
door track) \ 8 / 3 DEVELOPMENT APPROVAL BV - BRICK VENEER
vat —~ CLEARANCE ZONE E CJ- CONTROL JOINT
sessetamuren ina rot <<  @). aos pi beaa 7204 OF BLINDING WORKS Fee Se stern
. Oy OWIB CS NT Ge a ae ee Le ! G48 ¢ - ELS
7 > Wie, Wi? OO, 5 cs SE a REN EreEG EEE
ES ——-—— — Toe ROBE (WETERBOX pp 7 “ef 8 3 RB - RENDERED BRICKWORK
8 . 3 fs ci DP W13 a wi4 gs op 5 | “| ROBE 6 ian “ MB} | BI ei 7 st seronan
— ? 5 e:
= r g | \ a IS 18 TRH od y a ~ SM - SCYON MATRIX PANELING
mJ Le Fw. L x 3S - SCYON STRIA CLADDING
8 | | \ ow \ ‘ \ WC mf 1. wbirxsoonrmuen sHiveoo | | & ol o WB - HARDIES NEWPORT
8 | & 77 RECESS, SILL 1100 AFL 2 | 8| 8] §
g | . f BED2) JI BatH 8) 8] 8
wy \ a 770, 7 FLOOR AREAS
x 2 | Noa Be Ne ™ p< 4
a| é z 3 SE ||| 22 LIVING e VE | / HOUSE 228.07 mi?
g . ¢ Be 00-1 ea vo © eo PORCH 7.22 0°
‘ ge 3 Vv v mt 2 PATIO 31.90 m?
g| g az @ S ey 3 Grand total 267.19 m?
| 3 po
& e
i 8 r
3 Be Fs , |" \ So BR ACTIVITY ; 7 gs} 8
re ye \ ee BED 4 3] ISSUE
ed 2 ~ 2DRIRHOHC J wor we “|
T | ‘ | g #| DATE | DETAILS [BY
. 3 ‘ 140 x 140 LAMINATED \ KIT ; SN ON / 4 N ~ [04-08-17] NHP ISSUE DB
2 HWD POST ON GALV. "T" > i \ \Z - |29-08-17| WD ISSUE SiB
| BLADE STIRRUP 5 ‘ i] cREF XN 4 < A |28-09-17| CONSTISSUE | DB
B a + 8 z \ (> } \ 3 re B |18-10-17! COUNCIL AMEND | DB
3 7 ja =—b 2 Pa
2) 8 8 7 +l 3 | PATIO =||,8 DINING DW PROV 820 CIS \ B 5
B/ 3 8 8 = =} 2 & ze PTY \ ~~ bo)
a By Pot OES ENTRY’\ |= PORCH g| 2 2) 8 8
wy a Y a aio Ss
“oe (® BY gs No g 5 = 8
g) | “Le wio » . = os ot By AUSMAR®)
Sap SA = > Lou 820. : | E z =e Pay
|= a | r ~ ~ & ° @ 8 ~ 4 \ tow a ! . = po box 6384 p (07) 5442 6413
| ¢ s 2 Q@ BY 3 on flrs . T ae |e | maroochydore (07) 6450 6437
2 = 7 | = “ - phe . | T gid 4558 QBCC 1083000
Rete & \ it Zz Lew 920 C/S =1 57 we \ ; 1425 728 Tris plan remains copyright to
| j SE 555x555 yp wer py ismar Group and may not
/ 3 WTILED SHAMPOO. eee \ ; ‘ ;
1 ot we i er Li ? | two cnson te aor
g | 3 g f } | j © 2017 Ausmar Group
F) RY “ | BED 1 N 5 z | \ 5 2) 2) 2) WRITTEN DIMENSIONS TO
5 “ GARAGE | 2 6} b&b) &] B) 2 TAKE PRECEDENCE OVER SCALE
7 a MEDIA D- WMTAPS G | | , 8 a
s R joy / 2 Y ne © |FLOOR PLAN
x 8 is) 7 8 m7
i co 4 3 Prov], 4 N =
exe |e = | ys a ~__ = < _ PROJECT DESCRIPTION:
FS, | = ~ i = be [we] = WS W4 7 \ z
8 ex. 8 LP =e a |” oN . Proposed Dwelling For:
2 Wr W6 s VT : 5
8 N \ e
13 sg i S 0 © [cuent:
— 2250 (ie | Te oy i ia. | MRR. & MRS L. WILCOX
BULKHEAD ie) vor o : we PA oO
eee try nae 183
WINDOW... 283450 414450580 2400 5a 1880 93 aa ce are anor
# SIZE 4270 “15 6670 75 1e50PTY 75 2000 an JQ SUPPLEJACK COURT
wi2_[2130AW 175 1 “4 “ 175 <{_ | LAKE MacDONALD
W13 | 2109AW 3578 92 2530 75 5330 - : - $730 _ - a 1425 125 [ wv DESIGNED BY AUSMAR
W14 |2109AW 7 ~~ — ine oo 75 4 NOTE : PROVIDE LIFT OFF HINGES TO W.C. DOORS a
wis |1215SW 3495 175 2530 175 3360 75 1195 41825 5730 4600 | 550 4: SMOKE ALARMS TO BE HARD WIRED IN D |oramey seoas
wie 100065" + } f H ao ACCORDANCE WITH B.C.A. 3.7.2. SCALE JOB CODE
: FLOOR WASTE POSITIONS ARE INDICATIVE 3 4: 100
Wi7 |0915SW 3670 : 2880 5130 L 6080 , 1600 [550 A at SID TERED i [PATE S-RLW
Wie |1818sWo 719970 4 7 Cong SRO REGULATIONS Fy [180-17
wig |1818sw 18-10-17 B < | sneer 2 of 13

 

 

 

 

 

 

Page 3

450 O'HANG

400.725 RL— —— - —Sx— - — - — - — . —.— - a

 

450 O'HANG

 

  
 
 

 

 

SELECT METAL ROOF SHEET
(CUSTOM ORB PROFILE) @ 22.5°
ON ENGINEER DESIGNED
TRUSSES

SELECT METAL FASCIA AND
GUTTER

 

 

 

 

98.135 RL —LOORLEVEL.

 

 

 

 

 

RH

 

 

 

 

 

 

 

 

RH

 

 

 

 

 

ESL— RH;

 

 

HEBEL POWERPANEL EXTERNAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WALL CLADDING, SELECT

 

2100 JOINERY

 

 

 

 

RENDER FINISH

 

 

2550 CEILING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5828 APPROX O'ALL HEIGHT

 

 

FRONT ELEVATION
1: 100

SKY LIGHT

 

 

 

450 O'HANG

 

HEBEL COLUMN- — — _ >
SELECT RENDER FINIHS:

SCYON LINEA 180 CLADDING, PAINT FINISH, JAMES HARDIE
LINEA ALUMINIUM EXTERNAL SLIMLINE BOXED CORNER
(#305512)

SELECT METAL ROOF SHEET
(CUSTOM ORB PROFILE) @ 22.5°
ON ENGINEER DESIGNED
TRUSSES

SELECT METAL FASCIA AND
GUTTER

 

 

 

 

 

 

 

 

 

 

 

 

\/

 

 

 

 

 

 

 

\ i of

140 x 140 LAMINATED HWD POST
I ON GALV. “T* BLADE STIRRUP

 

 

 

 

 

 

 

 

<=

 

 

 

LEGEND - INTERNAL

AP - APPLIANCE CUPBOARD
BC - BROOM CUPBOARD:
C’BD - CUPBOARD

OP - DOWNPIPE

OW - DISHWASHER PROV.
FW - FLOOR WASTE

GAS - GAS CONNECTION

HP - HOT PLATE

HWS - HOT WATER SYSTEM
L-LINEN

MH - MANHOLE

MW - MICROWAVE PROV.
QHC - OVERHEAD CUPBOARD
PTY - PANTRY

R- ROBE

REF - REFRIDGERATOR SPACE
RH-RANGEHOOD

SH - SHELF

TR - TOWEL RAIL

TRH - TOILET ROLL HOLDER
UBO - UNDER-BENCH OVEN
WO - WALL OVEN

 

LEGEND - EXTERNAL

BV - BRICK VENEER

CJ- CONTROL JOINT

FC - FIBRE CEMENT SHEETING
RH - RENDERED HEBEL PANELS
RBB - RENDERED BLUEBOARD
RB - RENDERED BRICKWORK
RBL - RENDERED BLOCKWORK
SA- SCYON AXON

SL- SCYON LINEA

SM - SCYON MATRIX PANELING.
SS - SCYON STRIA CLADDING
WB - HARDIES NEWPORT

 

 

ISSUE

 

#) DATE DETAILS BY

 

04-08-17! NHP ISSUE DB.

 

/29-08-17| WD ISSUE iB

 

CONST ISSUE DB

 

A |29-09-17|
B

18-10-17| COUNCIL AMEND] DB.

 

 

 

 

 

 

 

 

AUSMAR®@)

oemes

 

2100 JOINERY

 

2550 CEILING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

_ RIGHT ELEVATION.

 

 

| 1: 100

No:

PH: 5443 7288

ALL FIXING AND FLASHING TO BE IN STRICT ACCORDANCE WITH THE
MANUFACTURERS DETAILS. WINDOW SIZES SHOWN ARE NOMINAL ONLY AND
ARE TO BE VERIFIED BY THE BUILDER ON SITE.

SUNCOAST

BUILDING APPROVALS

1724.68

ROSS BISHO

PQ
DEVELOPMENT
FOR BUILDING WORSE 040s 16-1671

03 NOV 2017

BOC: AS sees
APPROVAL

 

HEBEL POWERPANEL EXTERNAL
— WALL CLADDING, SELECT
RENDER FINISH — -

 

po box 6384
maroochydore
qid 4558

p (07) 5442 6413
f (07) 5450 6437
QBCC 1083000

 

This plan remains copyright to

Ausmar Group and may not be

used in part or in whole without

the written consent of the author.
© 2017 Ausmar Group

 

WRITTEN DIMENSIONS TO.
TAKE PRECEDENCE OVER SCALE

 

ELEVATIONS

 

PROJECT DESCRIPTION:
Proposed Dwelling For:

 

CLIENT:
MR R. & MRS L, WILCOX

 

SITE ADDRESS:

LOT 35 (#8)
SUPPLEJACK COURT

LAKE MacDONALD

 

DESIGNED BY AUSMAR

 

DRAWN BY
SCALE | —
1: 100

AUSMAR

 

CONSTRUCTION PLAN

18-10-17

 

 

ISSUE

 

ALEXANDRIA - TRADITIONAL (MOD)

JOB CODE
DATE

18-10-17 S-RLW

 

 

 

SHEET 3 OF 13

 

 

 

Page 4

 

 

450

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SELECT METAL ROOF SHEET
(CUSTOM ORB PROFILE) @ 22.5°

ON ENGINEER DESIGNED
TRUSSES

SELECT METAL FASCIA AND
GUTTER

HEBEL POWERPANEL EXTERNAL

WALL CLADDING, SELECT
RENDER FINISH

 

| REAR ELEVATION

 

| 4: 100

400.725 RL - — - — - —

__ 140x140 LAMINATED HWD POST—
ON GALYV, "T" BLADE STIRRUP

 

 

= al. 460 OHANG
SELECT METAL FASCIA AND

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SELECT METAL ROOF SHEET

(CUSTOM ORB PROFILE) @ 22.5°

ON ENGINEER DESIGNED
TRUSSES

GUTTER

HEBEL POWERPANEL COLUMN,
SELECT RENDER FINISH

 

 

| LEFT ELEVATION

 

| 1: 100

 

SUNCOAST
BUILDING APPROVALS

  

 

 

No: 1724-68 03 NOV 2017
N86 BISHOP OBCG. 416666
DEVELOPMENT APPROVAL
FOR BUILDING WORKS |
PH: 5443 7288 MOB: 0406 516 167

 

| ALL FIXING AND FLASHING TO BE IN STRICT ACCORDANCE WITH THE
MANUFACTURERS DETAILS. WINDOW SIZES SHOWN ARE NOMINAL ONLY AND
ARE TO BE VERIFIED BY THE BUILDER ON SITE.

SCYON LINEA 180 CLADDING,
PAINT FINISH. JAMES HARDIE
LINEA ALUMINIUM EXTERNAL
SLIMLINE BOXED CORNER
(#305512)

\

2100 JOINERY

 

2550 CEILING

|

 

LEGEND - INTERNAL

AP - APPLIANCE CUPBOARD
BC - BROOM CUPBOARD.
C'BD - CUPBOARD.

OP - DOWNPIPE

OW - DISHWASHER PROV,
FW FLOOR WASTE

GAS - GAS CONNECTION

HP - HOT PLATE

HWS - HOT WATER SYSTEM
L- LINEN

MH - MANHOLE

MW - MICROWAVE PROV.
CHC - OVERHEAD CUPBOARD
PTY - PANTRY

R-ROBE

REF - REFRIDGERATOR SPACE
RH - RANGEHOOD:

SH- SHELF

TR - TOWEL RAIL

TRH - TOILET ROLL HOLDER
UBO - UNDER-BENCH OVEN
WO - WALL OVEN

 

LEGEND - EXTERNAL

BV - BRICK VENEER

CJ- CONTROL JOINT

FC - FIBRE CEMENT SHEETING
RH - RENDERED HEBEL PANELS:
RBB - RENDERED BLUEBOARD
RB - RENDERED BRICKWORK
RBL - RENDERED BLOCKWORK
SA-SCYON AXON

SL- SCYON LINEA

SM-~- SCYON MATRIX PANELING
SS - SCYON STRIA CLADDING
WB - HARDIES NEWPORT

 

 

ISSUE

 

#| DATE DETAILS BY

 

}04-08-17| NHP ISSUE DB

 

|23-08-17| WD ISSUE SjB

 

 

A [29-08-17] CONST ISSUE bB.
B | 18-10-17| COUNCIL AMEND] DB

 

 

 

 

 

 

 

 

AUSMAR(®)

 

po box 6384p (07) 54426413
maroochydore (07) 5450 6437
qld 4558 QBCC 1083000

 

This plan remains copyright to

Ausmar Group and may not be

used in part or in whole without

the written consent of the author,
© 2017 Ausmar Group

 

WRITTEN DIMENSIONS TO.
TAKE PRECEDENCE OVER SCALE

 

ELEVATIONS

 

PROJECT DESCRIPTION:
Proposed Dwelling For:

 

CLIENT:
MR R, & MRS L. WILCOX

 

SITE ADDRESS:
LOT 35 (#8)
SUPPLEJACK COURT

LAKE MacDONALD

 

DESIGNED BY AUSMAR

 

DRAWN BY AUSMAR

SCALE | Jon ~ 7
Tae JOB CODE

 

 

CONSTRUCTION PLAN

18-10-17

 

ISSUE

 

ALEXANDRIA - TRADITIONAL (MOD)

oe | S-RLW

18-10-17

 

 

SHEET 4 oF 13

 

 

 

 

Page 5

 

 

15375

 

600 |

5290

765 450

x

[800 |

5290

120

3180 DOOR

4850

1215

120

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

   

 

 

 

 

 

 

 

  

 

     

 

 

19910
3270 6390 . 7335 | 1865 1250
4 SHR 1
100. 3030 10545 1000 3845 700 550
a y y y
i a 7 1 1
B L 2650 975 550 880 2280
1 7
140 x 140 LAMINATED HWD POST_ .
ON GALV. "T” BLADE STIRRUP
| 75mm HEBEL / 25mm CAVITY |}!
t SPSS = HI 2
3 -
I NY Fw 7 LF z=
| +k va Zz
I e+ | z
| | a
7a ie
SHOWER
N =
LOCATION
1K | | &
aa aI
140 x 140 LAMNATED HWD POST _| | LBW
ON GALV. "T-BLADE STIRRUP | SLAB AND FOOTINGS TO BE IN STRICT 8
Cl ACCORDANCE WITH THE ENGINEERS \| 8
| SPECIFICATIONS. ila
3
3
| e
oh &
5148 SINK < g
——— oe 3170 | 3g
T yo
SINK g
- a
Cc + CLAD WALL OVER, NO SLAB EDGE
3 |
So, 8 ™ ‘Emm HEBEL / 25mm CAVITY
%& S|
oe z
x =|
Fa ig
3
a
2 é Eh
& z mn Ww
w
E a
8 ut
~ a
Y a & o
oe oo
3 oS = TUB e| 8
x € a
= E 3
e a
2 a z
& — a= ie a
2
§
Me 6 ar Ig
7 &| 8/8 g
3 IB
i 4 3 Ty
778 ae 75mm HEBEL / 25mm CAVITY \
we
4975 |, 1400 SHR
A
3670 990 VB) 900) 990 VB 3477 1560 98 6080 1425 | 725
+ Soo” 7
3670 2880 5130 6080 2150

 

 

 

 

 

 

 

SUNCOAST
BUILDING APPROVALS

SHR

 

600 |

 

2170

3070
3070

4000 |

: rm

3455
3555
3105

 

990
DOOR

2085

2085

 

450

4860 DOOR
5615
6065

 

 

sid

ALEXANDRIA - TRADITIONAL (MOD)

LEGEND - INTERNAL

AP - APPLIANCE CUPBOARD
BC - BROOM CUPBOARD
C'BD - CUPBOARD

DP - DOWNPIPE

DW - DISHWASHER PROV,
FW - FLOOR WASTE

GAS - GAS CONNECTION

HP - HOT PLATE

HWS - HOT WATER SYSTEM
L- LINEN

MH - MANHOLE

MW - MICROWAVE PROV.
GHC - OVERHEAD CUPBOARD
PTY - PANTRY

R-ROBE

REF - REFRIDGERATOR SPACE
RH- RANGEHOOD

‘SH - SHELF

TR - TOWEL RAIL

TRH - TOILET ROLL HOLDER
UBO - UNDER-BENCH OVEN
WO - WALL OVEN

 

LEGEND - EXTERNAL

BV - BRICK VENEER

GJ- CONTROL JOINT

FC - FIBRE CEMENT SHEETING
RH - RENDERED HEBEL PANELS.
RBB - RENDERED BLUEBOARD
RB - RENDERED BRICKWORK
RBL - RENDERED BLOCKWORK
SA-SCYON AXON

SL- SCYON LINEA

SM - SCYON MATRIX PANELING
SS - SCYON STRIA CLADDING
WB - HARDIES NEWPORT

 

 

 

 

 

ISSUE

#) DATE DETAILS BY
|04-08-17| NHP ISSUE 0B
|29-08-17| WD ISSUE 5jB

 

 

A |29-09-17| CONST ISSUE DB
B /18-10-17/ COUNCIL AMEND | DB

 

 

 

 

 

 

 

 

 

—
AUSMAR )
po box 6384 p (07) 5442 6413
maroochydore f (07) 5450 6437
qid 4558 QBCC 1083000

 

This plan remains copyright to

Ausmar Group and may not be

used in part or in whole without

the written consent of the author.
© 2017 Ausmar Group

 

WRITTEN DIMENSIONS TO
TAKE PRECEDENCE OVER SCALE

 

SLAB LAYOUT

 

PROJECT DESCRIPTION:
Proposed Dwelling For:

 

CLIENT:
MR R. & MRS L, WILCOX

 

SITE ADDRESS:
LOT 35 (#8)
SUPPLEJACK COURT

LAKE MacDONALD

 

DESIGNED BY AUSMAR

 

 

 

 

 

DRAWN BY AUSMAR,
No: 172468 03 NOV 2017 Seg | —«-OBCODE
EERE PSA a
FOR BUILDING WORKS sHEET 5 oF 13

 

Pid ca

 

 

& MUBT 0406 ST 167

 

 

 

Page 6

 

100.725 RL—

98.135 RL

 

SELECT METAL ROOF SHEET
(CUSTOM ORB PROFILE) @ 22.5°
ON ENGINEER DESIGNED
TRUSSES

 

ROOF TO BE BRACED WITH SPEEDBRACE OR
ANGLE BRACE IN ACCORDANCE WITH TRUSS
MANUFACTURERS SPECIFICATIONS.

450 O/H

 

SECTION A

   

KIT

 

 

 

 

 

 

 

 

 

 

 

~

7 ™ FC SHEET TO EAVES. LINED ON

HORIZONTAL

HEBEL POWERPANEL EXTERNAL
WALL CLADDING, SELECT
RENDER FINISH

 

 

Mowe

 

 

a —

SLAB AND FOOTINGS AS PER ENGINEERS DESIGN.
TERMITE PROTECTION AS PER THE BUILDING
SPECIFICATIONS.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

1: 100
ROOF TO BE BRACED WITH SPEEDBRACE OR
ANGLE BRACE IN ACCORDANCE WITH TRUSS
MANUFACTURERS SPECIFICATIONS,
SELECT METAL ROOF SHEET
(CUSTOM ORB PROFILE) @ 22.5° ne
ON ENGINEER DESIGNED 450 OH
TRUSSES ROOF TRUSS TO MANUFACTURERS DESIGN
_ PLASTERBOARD UNINGS THROUGHOUT
I 2 | |
| 1 2 tor
FC SHEET TO EAVES, LINED ON PATIO RH | 7 8 ENTRY
HORIZONTAL 8 |
! e i L |
a —- a ! x —— = ee
L tJ OS — —_ EE E=<X—E oes et
i i ay | : | |
; - i 1 hi SS iro] ee
~~ ht ~ SLAB AND FOOTINGS AS PER ENGINEERS DESIGN. a 7
TERMITE PROTECTION AS PER THE BUILDING
SUNCOAST
SECTION B ao BUILDING APPROVALS
1: 100 . No: 1772468 03 NOV 2017
x
<=
a RL 98.580 ROSS BISHOP OBCO:A15486
3 GRATED DRAIN DEVELOPMENT APPROVAL
a FOR BUILDING WORKS

| Driveway Crossover Details

 

| 1:100

 

  
 

 

 

 

 

 

 

 

oso
#2 HOUSE SLAB RL 98.135
Ww PS
HOUSE PAD RL 97.750
1500 4500 460 1490 L
lr] 1
L 7950 /

 

 

 

PH: 5443 7288

“_ MOE: 0406 616 167

 

LEGEND - INTERNAL

AP - APPLIANCE CUPBOARD
BC - BROOM CUPBOARD
CBD - CUPBOARD

DP - DOWNPIPE

DW - DISHWASHER PROV.
FW - FLOOR WASTE.

GAS - GAS CONNECTION

HP - HOT PLATE

HWS - HOT WATER SYSTEM
L- LINEN

MH - MANHOLE

MW - MICROWAVE PROV.
OHC - OVERHEAD CUPBOARD
PTY - PANTRY

R-ROBE

REF - REFRIDGERATOR SPACE

TR ~ TOWEL RAIL
TRH - TOILET ROLL HOLDER
UBO - UNDER-BENCH OVEN
WO - WALL OVEN

 

LEGEND - EXTERNAL

BV - BRICK VENEER

CJ- CONTROL JOINT

FC - FIBRE CEMENT SHEETING
RH - RENDERED HEBEL PANELS.
RBB - RENDERED BLUEBOARD
RB - RENDERED BRICKWORK
RBL - RENDERED BLOCKWORK
SA- SCYON AXON

SL- SCYON LINEA

SM - SCYON MATRIX PANELING
SS - SCYON STRIA CLADDING
WB - HARDIES NEWPORT

 

 

 

 

 

ISSUE

#, DATE DETAILS BY
04-08-17] NHP ISSUE cB
29-08-17] WD ISSUE SjB

 

 

|A |29-03-17| CONST ISSUE DB
B |18-10-17] COUNCIL AMEND DB

 

 

 

 

 

 

 

L

 

haes,

AUSMAR®@)

 

po box 6384
maroochydore
qld 4558

p (07) 5442 6413
# (07) 5450 6437
QBCC 1083000

 

This plan remains copyright to.

Ausmar Group and may not be

used in part or in whole without

the written consent of the author.
© 2017 Ausmar Group

WRITTEN DIMENSIONS TO
TAKE PRECEDENCE OVER SCALE

 

SECTIONS

PROJECT DESCRIPTION:
Proposed Dwelling For:

 

| CLIENT:
MR R. & MRS L. WILCOX

 

SITE ADDRESS:
LOT 35 (#8)
,; SUPPLEJACK COURT

| LAKE MacDONALD
| DESIGNED BY AUSMAR

 

DRAWN BY AUSMAR

SCALE | ~  Jogcor
Gan JOB CODE

 

CONSTRUCTION PLAN

141017

 

 

ISSUE

 

ALEXANDRIA - TRADITIONAL (MOD)

 

DATE S-RLW

18-10-17

 

 

 

 

SHEET 6 OF 13

 

Page 7

 

VARIABLE

  
   

25mm RADIUS

=—

 

WIDTH AS PER SPEC
2760/486015260

| A-PANEL-LIFT DOOR RECESS

 

| 1:20

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2
a
700x450 Hi
g 8 (EBEL PIER
BATTEN CAVITY
FRAME
CAVITY
19
a
2
450
450
75 26 250 2 75
at
FRAME
4 CAVITY
f— HEBEL
FIXING BATTEN
MAIN SLAB LEVEL
a of ff
ox &
= r

=
EXTERNAL SLAB LEVEL S. :

APPROVED TERMITE BARRIER nn

TO PERIMETER OF BUILDING AND TO.
‘ALL SLAB PENETRATIONS. INSTALL IN
ACCORDANCE WITH MANUFACTURERS:
SPECIFICATIONS AND AS3660

GROUND LEVEL

  

 

 

 

 

 

 

F - HEBEL COLUMN

1:10

75 26
Ar

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

SARKING TO WALLS AS TIMBER FRAME
PER SPECIFICATION AS SPEC
20-25mm BATTENS {TERMITE PROTECTION

AS PER SPEC,
HEBEL ——-
POWERWALL 9 fo
SYSTEM 7 > :
CONCRETER TO ENSURE —=}" 100° 3
NEAT FINISH TO SLAB EDGE —

“4 =

WAFFLE-POD. -—-—————}-=—
SLAB SYSTEM TO ENG, a
DESIGN & SPECIFICATIONS

 

 

__B-HEBEL SLAB EDGE

 

| 1:10

140x140 LAMINATED
HARDWOOD POST

GAL STIRRUP
TO CONCRETE FOOTING.
2/M12 BOLTS TO POST

  
 
  
 
 

 

 

  

 

“SAND FILL —

OPTIONAL CONCRETE —}+
PATIO SLAB

 

 

 

CONCRETE FOOTING TO
ENGINEERS DETAIL

 

| D-POST SECTION

 

| 1:20

 

LINE OF FRAME

INTERIOR FLOOR
COVERING

 

 

 

 

 

 

CONCRETE
SLAB

FIBRE CEMENT
PACKERS

 

 

 

   
 
    
  

La

 

i —=— OUTSIDE FACE
|

lp] OF HEBEL
LINE OF FRAME =; | DOOR TRACK
xorpon fb} I | ;——— TILED LEDGE

 

i
"
J bn

 

 

 

 

 

  

i)

SHOWER SCREEN
50mm ALUM. ANGLE. —, —_ AS PER SPEC.

CONCRETE SLAB

SKIM-COAT RENDER TO
SLAB EDGE FACE

C - HEBEL DOOR SILL DETAIL
1

 

 

 

 

   

 

 

 

 

 

-— FALL TO WASTE
— / /— FLOOR
WASTE
ir aad 4 4 : Le
ed . :
a” = .4 “4
WATERPROOF MEMBRANE —— ——— TILERS BEDDING
IN ACCORDANCE WITH COMPOUND
BCA 3.8,1 REQUIREMENTS

OUTSIDE FACE
OF WALL

SCREEN DOOR TRACK
DOOR TRACK

 

 

 

E- SHOWER HOB
1:10

 

SUNCOAST
BUILDING APPROVALS

 

 

 

 

 

LEGEND - INTERNAL

AP - APPLIANCE CUPBOARD.
BC - BROOM CUPBOARD.
C'BD - CUPBOARD

OP - DOWNPIPE

DW - DISHWASHER PROV.
FW - FLOOR WASTE

GAS - GAS CONNECTION

HP - HOT PLATE

HWS - HOT WATER SYSTEM
L- LINEN

MH - MANHOLE

MW - MICROWAVE PROV.
OHC - OVERHEAD CUPBOARD
PTY - PANTRY

R-ROBE

REF - REFRIDGERATOR SPACE.
RH- RANGEHOOD

‘SH - SHELF

TR - TOWEL RAIL

TRH - TOILET ROLL HOLDER
UBO - UNDER-BENCH OVEN
WO - WALL OVEN

 

LEGEND - EXTERNAL

BV - BRICK VENEER

CJ- CONTROL JOINT

FC - FIBRE CEMENT SHEETING
RH - RENDERED HEBEL PANELS
RBB - RENDERED BLUEBOARD
RB ~ RENDERED BRICKWORK
RBL - RENDERED BLOCKWORK
SA- SCYON AXON

SL- SCYON LINEA

SM - SCYON MATRIX PANELING
SS - SCYON STRIA CLADDING
WB - HARDIES NEWPORT

 

 

 

 

 

ISSUE

#| DATE DETAILS BY
04-08-17] NHP ISSUE DB
|29-08-17] WD ISSUE ‘SjB

 

A |29-09-17| CONST [SSUE DB
B

 

18-10-17| COUNCIL AMEND | DB

 

 

 

 

 

 

 

 

 

 

pobox 6384p (07) $442. 6413
Maroochydore f (07) 54506437
aid 4558 QBCC 1083000

 

This plan remains copyright to
Ausmar Group and may not be
used in part or in whole without
the written consent of the author.
©2017 Ausmar Group

 

WRITTEN DIMENSIONS TO
TAKE PRECEDENCE OVER SCALE

 

DETAILS

 

PROJECT DESCRIPTION:
Proposed Dwelling For:

 

 

 

 

 

18-10-17

 

 

 

 

 

 

a
o
=
4
ft
6
CLIENT:
No. 172468 03 NOV 2017 — |MRR.&MRSL. WILCOX
ROSS BISHOP. gaeg: pit agee a
DEVELOPMENT APPROVAL <
FOR BUILDINGAWORKS SITE ADDRESS:
Pri 8248 7286 MOS: 6406 §16 167 F- | LOT 35 (#8)
1 | SUPPLEJACK COURT
<{_ [LAKE MacDONALD
aw DESIGNED BY AUSMAR
9 DRAWN BY AUSMAR
x Scae | sopcone |
CONSTRUCTION PLAN ] "= | 44 [c,,| S-RLW
<x

 

SHEET 7 OF 13,

 

 

Page 8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

24075 1980
EQ EQ FQ EQ
1 1
|
) & ~
x=
E| = 8
| & 8
* ae
E a]
8 K
g
2
gx
er -
ef
a
a
3
—:

 

 

960 1000 SHR

1 - BATH
1:50

1000 960

500 200 300100

 

 

a

700 SHR RAIL

2000 TILES / SHR SCRN

 

1100 MIXER

SKIRT TILE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BATH ELEVATION A

os06SW og15Sw

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     
 
 
 

 

 

BATH ELEVATION C
1:50

 

SUNCOAST
BUILDING APPROVALS

No: 172468 03 NOV 2017
ROSS BISHOP OQBCC, Ai 5666
NT APPROVAL
DEV EOR BUILDING WORKS
[ PH: 5443 7288

MOF: 0406 616 167

BATH ELEVATION E

 

 

 

770

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

900 HOB 325 1200 VB 170 = 1000 SHR
ye oy pine i
_ 1 11 171 1
er MIRROR \
z os1ssw ‘ a
7 we
3S \ NICHE 3 32
DGPO @ 1000 Ww
EA a f EAN cass pivot &
Py 4 = — \, SHOWER a
= NB’ m SCREEN &
a Rl wfu- 7 ms 3s wo
> K ~ = o
g z= \ / wy “| &
a BATH
r
BATH ELEVATION B
1:50
1760 TR
~
4 700 | |||os1ssw
Ye
‘ 7 MIXER
m | +—]— >
on
8 g | MYXER @ 700 Bg) 4
ele & © =~ e
e 8 2 2 &
a x= = o
S =! gle Rs 3l8
2} °|4 SKIRT THE all q °F
t F —_ -

 

900

BATH ELEVATION D

 

 

P17 SKIRT TILE

 

 

 

BATH ELEVATION F

 

LEGEND - INTER ..

AP - APPLIANCE CUPBOARD
BC - BROOM CUPBOARD
C'BD - CUPBOARD

DP - DOWNPIPE

DW - DISHWASHER PROV.
FW - FLOOR WASTE

GAS - GAS CONNECTION

HP - HOT PLATE

HWS - HOT WATER SYSTEM
L-LINEN

MH - MANHOLE

MW - MICROWAVE PROV.
OHC - OVERHEAD CUPBOARD
PTY - PANTRY

R-ROBE

REF - REFRIDGERATOR SPACE
RH - RANGEHOOD:

SH - SHELF

TR ~- TOWEL RAIL

TRH - TOILET ROLL HOLDER
UBO - UNDER-BENCH OVEN
WO - WALL OVEN

|LEGEND- EXTERNAL |

BV - BRICK VENEER

CJ - CONTROL JOINT

FC - FIBRE CEMENT SHEETING
RH - RENDERED HEBEL PANELS
RBB - RENDERED BLUEBOARD
RB - RENDERED BRICKWORK
RBL - RENDERED BLOCKWORK
SA- SCYON AXON

SL- SCYON LINEA

SM - SCYON MATRIX PANELING
SS - SCYON STRIA CLADDING
WB - HARDIES NEWPORT

 

 

 

 

 

ISSUE

#| DATE DETAILS BY
}04-08-17] NHP ISSUE bB
29-06-17] WD ISSUE SiB

 

 

A {29-09-17| CONST ISSUE OB
B /18-10-17| COUNCIL AMEND | DB

 

 

 

 

 

 

 

 

 

Ns
AUSMARG
Pames mo
po box 6384 Pp (07) 5442 6413
Mmaroochydare —f_ (07} $450 6437
qld 4558 QBCC 1083000

 

This plan remains copyright to

‘Ausmar Group and may not be

used in part or in whole without

the written consent of the author.
© 2017 Ausmar Group

 

WRITTEN DIMENSIONS TO.
TAKE PRECEDENCE OVER SCALE

 

JOINERY - BATH

 

PROJECT DESCRIPTION:
Proposed Dwelling For:

CLIENT:
MR R. & MRS L. WILCOX

 

SITE ADDRESS:
LOT 35 (#8)
SUPPLEJACK COURT

LAKE MacDONALD

 

DESIGNED BY AUSMAR

 

 

 

18410417

CONSTRUCTION PLAN

 

ISSUE

 

ALEXANDRIA - TRADITIONAL (MOD)

 

DRAWNBY  AUSMAR
SCALE | Jopcop
CAL JOB CODE
DATE S-RLW
49-10-17

 

SHEET 8 oF 13

 

 

 

 

Page 9

 

800 TRH

1000 WALL

90MM CAVITY
‘SUDER WALL

      

92.75 = 1055 1400 600 1330 600 LEGEND - INTERNAL
a “ a - ci a 7 4 , AP - APPLIANCE CUPBOARD
MIRROR BC - BROOM CUPBOARD
1800 C’BD - CUPBOARD
OP - DOWNPIPE
VB

    
 

 

DW - DISHWASHER PROV.
FW- FLOOR WASTE

GAS - GAS CONNECTION

HP - HOT PLATE

HWS - HOT WATER SYSTEM
L-LINEN

MH - MANHOLE:

MW - MICROWAVE PROV.
OHC - OVERHEAD CUPBOARD

 

 

BULKHEAD 2250

a= ea
OS045AW)

 

EQ | EQ
7
900

 

4390 TR

 

 

 

 

 

PTY - PANTRY

R- ROBE

REF - REFRIDGERATOR SPACE
RH - RANGEHOOD:

SH-SHELF

TR - TOWEL RAIL

TRH - TOILET ROLL HOLDER
UBO - UNDER-BENCH OVEN

 

 

 

 

 

 

 

 

 

 

4
Ez
a

KE =

g
&
203
TILES

 

 

 

 

 

 

 

 

 

WO - WALL OVEN

 

 

 

 

 

 

 

 

 

VB
. ee LEGEND - EXTERNAL
BV - BRICK VENEER
CJ- CONTROL JOINT
FC - FIBRE CEMENT SHEETING
‘SKIRT TILE RH - RENDERED HEBEL PANELS.

NY
/

 

 

 

905
VB

 

 

 

 

 

 

 

 

Og04SAW O9045AW

365 1800 VB 365 = ——— — RBB - RENDERED BLUEBOARD
RB - RENDERED BRICKWORK

 

 

 

 

 

 

 

 

 

 

RBL - RENDERED BLOCKWORK
SA- SCYON AXON

ENSUITE ELEVATION B SM - SCVON MATRIX PANELING

| We HARDIES NEWPORT
1:50 5599 1:50 -

ae — _| ENSUITE ELEVATION A

 

 

 

 

1910

 

 

09045A\

 

 

 

boo cis 800 TRH ISSUE

 

#| DATE DETAILS BY

 

 

 

 

}04-08-17} NHP ISSUE DB

 

 

29-08-17] WD ISSUE SjB

12 >

I GLASS PIVOT. |

 

 

SHOWER *

 

x A |29-09-17] CONST ISSUE OB
B

 

‘SCREEN 18-10-17} COUNCIL AMEND | DB.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1500
fer
T
;
S
800

 

 

 

 

 

 

/
5
8

AUSMAR®)

 

SUITE-ELEVATION C ENSUITE ELEVATION D

po box6384 pp (07) 54426413
Maroochydore (07) 54506437

1015

       

 

S Uj N Cc OQ AS 4 . 50 qld 4558 QBCC 1083000

 

 

BUILDING APPROVALS ae

No: 172468 0.3 NOV 2017 Bevguanente othe sae,

     
 

 
 

 

 

 

  

3 - LAUNDRY

SS BISHOP OBOC: A1sees  Prece pence ever se

 

 

1:50

     

 

 

 

 

 

 

2115SGD Proposed Dwelling For:

   

 

CLIENT:
MR R. & MRS L. WILCOX

 

2415SGD

TILES

e—

 

 

SITE ADDRESS:
LOT 35 (#8)
SUPPLEJACK COURT

LAKE MacDONALD

 

 

 

TUB

 

 

 

 

 

 

 

 

 

 

 

DESIGNED BY AUSMAR

 

! SKIRT TILE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

OPMENT APPROVAL TAKE PRECEDENCE OVER SCALE
2115SGD
SKIRTTILE || oid i P SKIRTTILE | Pp he]
(wa tapsin

FBUILBING WORKS JOINERY - LNDY
& ENSUITE

LAUNDRY ELEVATION A | LAUNDRY ELEVATION B cup LAUNDRY ELEVATION C LAUNDRY ELEVATION D

1 : 50 1 * 50 1 : 50 | CONSTRUCTION PLAN ISSUE

 

DRAWN BY AUSMAR

SCALE ] ~~ JopcopE
ae JOB CODE

DATE S-RLW

18-10-17

 

 

 

 

 

PROJECT DESCRIPTION:
18-10-17 B

ALEXANDRIA - TRADITIONAL (MOD)

 

 

 

 

 

SHEET Q oF 13

 

 

Page 10

 

LEGEND - INTERNAL

nd - APPLIANCE CUPBOARD
: M CUPBOARD
3590 5 225 8 1278 L C'BD - CUPBOARD
+t 4 DP - DOWNPIPE
DW - DISHWASHER PROV.
650 75 FW- FLOOR WASTE

ve GAS - GAS CONNECTION
4 HP - HOT PLATE
HWS - HOT WATER SYSTEM

 

 

 

 

L- LINEN
690 1000 1260 MH - MANHOLE
A K— je MW - MICROWAVE PROV.

4 1 1 OHC - OVERHEAD CUPBOARD
PTY - PANTRY
R- ROBE
MOF PAINTED BULKHEAD REF - REFRIDGERATOR SPACE,
RH- RANGEHOOD

75
LL
He

 

 

ye

x MDF BULKHEAD OVER
=
&
K
g BREAKFAST BAR
= TOWER !
d :
94 ow 3,
PROVISION 3
2
&

} 600 } 1450 L 1100 |

 

 

 

 

 

|, 850

 

 

SH - SHELF
. TR - TOWEL RAIL

\ TRH - TOILET ROLL HOLDER
UBO - UNDER-BENCH OVEN

 

‘OHO:

640

 

 

 

600

 

|

 

WO - WALL OVEN

MW

PROVISION ‘ LEGEND - EXTERNAL

RFF. 4, BV - BRICK VENEER
PROVISION CJ~ CONTROL JOINT

720 FC - FIBRE CEMENT SHEETING
OVEN = RH - RENDERED HEBEL PANELS
f RBB - RENDERED BLUEBOARD

RB - RENDERED BRICKWORK
é RBL - RENDERED BLOCKWORK
= : SA- SCYON AXON
f SL- SCYON LINEA

AWE , SM - SCYON MATRIX PANELING
DRAWERS ‘ SS - SCYON STRIA CLADDING
WB - HARDIES NEWPORT

 

 

 

 

 

600

600 50
wo

 

 

 

 

1820 REF

 

 

 

 

2030
AG

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Aa

ee tet __ KITCHEN ELEVATION A KITCHEN ELEVATION B

60 1:50 SUNCOAST
BUILDING APPROVALS

  

  

 

   

ISSUE

 

#] DATE DETAILS BY
~ |04-08-17| NHP ISSUE oB

4 - KITCHEN

   

No: 172468 03 NOV 2017

 

 

 

= |29-08-17| WD ISSUE sib
|29-09-17| CONST ISSUE DB

   

1:50

ROSS BISHOP QBCC: a1566
DEVELOPMENT APPROVAL

 

>

 

o

18-10-17] COUNCIL AMEND | DB

  

       

/ FOR BUILDING WORKS
4860 PH: 5443 7288 1093 : wars 0406 516 167

eo =
3290 600 | i
PA ¥

 

 

 

 

 

 

 

 

— AUSMAR@)

 

 

 

 

 

 

PAINTED MOF BULKHEAD
po box 6384p (07) 54426413
maroachydore — (07) 5450 6437
qld 4558 QBCC 1083000

 

o w]e

500
7

 

 

 

 

 

 

 

 

 

 

 

This plan remains copyright to

Ausmar Group and may not be

used in part or in whole without

the written consent of the author.
© 2017 Ausmar Group

 

 

700

 

MOF SHELVING
WRITTEN DIMENSIONS TO
BY CARPENTER TAKE PRECEDENCE OVER SCALE

MOF SHELVING
BY CARPENTER

 

 

 

 

JOINERY -
KITCHEN

PROJECT DESCRIPTION:

 

 

 

900
.
7
|
Ne
7
900
|

 

 

 

 

 

 

 

 

450 450 400 «(360 350

 

 

é 5 5; o <L . —=T 7 \, Ieee CBD,

 

 

 

 

  

 

 

 

 

| 60 450 | 400 | 350) 350

 

 

 

 

 

i

 

Proposed Dwelling For:

500 1350

 

 

 

CLIENT:
MR R. & MRS L. WILCOX

 

KITCHEN ELEVATION C KITCHEN ELEVATION D |__KITCHEN ELEVATION E | KITCHEN ELEVATION F
1:50 | 1:50 | 1:50

SITE ADDRESS:
LOT 35 (#8)
SUPPLEJACK COURT

LAKE MacDONALD
DESIGNED BY AUSMAR

 

 

 

 

DRAWN BY AUSMAR

 

 

SCALE - "JOB CODE
CONSTRUCTION PLAN | “5 me | S-RLW

 

ALEXANDRIA - TRADITIONAL (MOD)

110-17 B

 

 

 

 

SHEET 10 0F 13

 

 

Page 11

 

 

 

 

 

 

 

 

ELECTRICAL QUANTITIES

DESCRIPTION No.
FAN - CEILING FAN ONLY 8
FAN - EXHAUST 3
LIGHT FITTING - RECESSED LED 38
LIGHT FITTING - SINGLE FLURO 36W 1
LIGHT FITTING - WALL MOUNT BUNKER 1
POINT - DOUBLE GPO 22

 

POINT - DOUBLE WATERPROOF GPO
POINT - PAY TELEVISION POINT

 

POINT - SINGLE GPO

 

 

POINT - TELEPHONE

 

POINT - TELEVISION POINT

 

POINT AUDIO - 4xAUDIO IN - JUNCTON POINT

 

2
2
6
POINT - SINGLE WATERPROOF GPO 1
1
4
1
4

POINT AUDIO - PLATE WITH 1.5m CABLE
PROTRUDING

 

 

 

 

ELECTRICAL LEGEND

 

CEILING FAN

 

CEILING FAN / LIGHT COMBINATION

EXHAUST FAN

 

HEAT FAN & LIGHT

 

LIGHT POINT - CFL (32w / 22w)

 

LIGHT POINT - BATTEN

 

LIGHT POINT - LED

 

EXTERNAL FLOOD LIGHT

 

WALL LIGHT

 

SINGLE FLURO

 

GPO - DOUBLE

 

GPO - SINGLE

 

GPO - DOUBLE WEATHERPROOF

 

GPO - SINGLE WEATHERPROOF

 

BLANK PLATE / JUNCTION BOX

 

2D festea}-ops) | )0)¢\»|9 ole le Se] Se

TELEPHONE POINT

DATA POINT

 

TELEVISION POINT

 

HDMI POINT

 

Slagle AS

SMOKE ALARM

 

METER BOX

 

HOT WATER SYSTEM

 

GAS HOT WATER UNIT

 

WATER PUMP

 

LIGHT SWITCH - VARIABLE POLES

 

3 e® |

2-TWOWAY DD - DIMMER

 

4 D>

 

NOTE: ALL LIGHT SWITCHES LOCATED @ 1100mm ABOVE FL.
UNLESS OTHERWMSE NOTED,
ALL POWER OUTLETS LOCATED 300mm ABOVE FL UNLESS
OTHERWISE NOTED & TH BCA REQUIREMENTS.

 

 

 

SUNCOAST
BUILDING APPROVALS
No: 4724.68 03 NOV 2017
MOSS BISHOP, QBCC: AI 5668

OPMENT APPROVAL
DEVON BUILDING WORKS

 

PH: 5443 7288 MOB: 0406 576.

 

 

 

  

fi

a

98

oa

 

NBN CONNECTION LEGEND - INTERNAL
AP - APPLIANCE CUPBOARD

 

GAS WO - WALL OVEN

  

 

* INSTALL 1x DGPO. BC - BROOM CUPBOARD
* SUPPLY & TERMINATE tx DATA POINT CAT 6 CABLE. tai tartd
* SUPPLY & TERMINATE 1x PHONE POINT CAT 6 CABLE. DW- DISHWASHER PROV.
. FW - FLOOR WASTE
oe al ‘x LEAD IN FROM PIT TO SIDE OF HOUSE P20 PIPE WITH [FW-FLOOR WASTE
HP - HOT PLATE
* SUPPLY & TERMINATE THE 2 CAT 6 POINTS IN GARAGE TO 2-GANG SWITCH HWS - HOT WATER SYSTEM
L~ LINE
FOR INTERNAL CONNECTIONS. MHC MANHOLE
MW - MICROWAVE PROV.
OHC - OVERHEAD CUPBOARD
PTY - PANTRY
R-ROBE

REF - REFRIDGERATOR SPACE.
RH - RANGEHOOD

SH - SHELF

TR - TOWEL RAIL

TRH - TOILET ROLL HOLDER
UBO - UNDER-BENCH OVEN

LEGEND - EXTERNAL

BV - BRICK VENEER

a4 CJ- CONTROL JOINT
MB FC - FIBRE CEMENT SHEETING
Cs RH- RENDERED HEBEL PANELS

; RBA - RENDERED BLUEBOARD
RB - RENDERED BRICKWORK
y RBL - RENDERED BLOCKWORK
i SA- SCYON AXON
| SL + SCYON LINEA
SM - SCYON MATRIX PANELING
i SS - SCYON STRIA CLADDING
' WB - HARDIES NEWPORT

 

 

 

 

 

 

 

 

 

  
    
 

_a tated lp \
es + (Gemieneencel HOA Gee
x, Se = DOOAFL Se AFL ORT y
—_—®& : po g
a S/o —s 300 \ a , 0
LED j @ \ED ;
Aw : \ femoral POWER TO
. c [ee pte toe
By 4000 INA BOOSTER
a Pa

    

PaY-i-y
Javoro fi \ LED

 

 

WALL MOUNT BUNKER

  

\

 

CHUNG

36W x

CONDUIT 300 to 1350 AFL \ i
. firemen
™~

 

 

 

 

 

 

4 . 4 j ISSUE
LED e #| DATE DETAILS BY
A + [04-08-17] NHP ISSUE DB
Fa ~ [28-08-17] WD ISSUE 3B
i A[29-09-17| CONST ISSUE [DB
aos 8 |18-10-17| COUNCIL AMEND| DB
LED

 

 

 

 

 

AUSMAR@

ponies

 

po box 6384p (07) 54426413
Maroochydore (07) 5450 6437
ald 4558 QBCC 1083000

 

This plan remains copyright to
Ausmar Group and may not be
used in part or in whole without
the written consent of the author.
©2017 Ausmar Group

 

WRITTEN DIMENSIONS TO
TAKE PRECEDENCE OVER SCALE

 

ELECTRICAL
PLAN

 

PROJECT DESCRIPTION:
Proposed Dwelling For:

 

CLIENT:
MR R. & MRS L, WILCOX

 

SITE ADDRESS:
LOT 35 (#8)
SUPPLEJACK COURT

LAKE MacDONALD

 

DESIGNED BY AUSMAR

 

DRAWN BY AUSMAR

 

JOB CODE

ame S-RLW

18-10-17

 

 

 

CONSTRUCTION PLAN | ‘“**

 

 

ALEXANDRIA - TRADITIONAL (MOD)

 

 

 

18-10-17 B SHEET 110F 13

 

 

 

Page 12

 

 

LEGEND

-—
| TILES

CARPET

 

 

 

NOTE - WS DENOTE WATERSTOPS TO BCA REQUIREMENTS

 

 

 

 

 

 

 

 

SUNCOAST
BUILDING APPROVALS

No: 172468 03 NOV 2017
ROSS BISHGP. QBCC_A15666
DEVELOPMENT APPROVAL
FOR BUILDING WORKS
PH: 5448 7288 MOB: Gade 516 167

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LEGEND - INTERNAL

AP ~ APPLIANCE CUPBOARD
&C - BROOM CUPBOARD
C’BD - CUPBOARD

DP - DOWNPIPE

DW - DISHWASHER PROV.
FW- FLOOR WASTE

GAS - GAS CONNECTION

HP - HOT PLATE

HWS - HOT WATER SYSTEM
L-UNEN

MH - MANHOLE

MW - MICROWAVE PROV.
OHC - OVERHEAD CUPBOARD.
PTY - PANTRY

R- ROBE

REF - REFRIDGERATOR SPACE
RH - RANGEHOOD

SH - SHELF

TR - TOWEL RAIL

TRH - TOILET ROLL HOLDER
UBO - UNDER-BENCH OVEN
WO - WALL OVEN

 

LEGEND - EXTERNAL

BV - BRICK VENEER

GJ - CONTROL JOINT

FC - FIBRE CEMENT SHEETING
RH - RENDERED HEBEL PANELS
RBB - RENDERED BLUEBOARD
RB - RENDERED BRICKWORK
RBL - RENDERED BLOCKWORK
SA-SCYON AXON

‘SL- SCYON LINEA

SM - SCYON MATRIX PANELING
SS - SCYON STRIA CLADDING
WB - HARDIES NEWPORT

 

 

 

 

 

ISSUE

#| DATE DETAILS BY
04-08-17; NHP ISSUE DB
29-08-17| WD ISSUE SjB

 

 

A |29-09-17| CONST ISSUE DB
B /18-10-17} COUNCIL AMEND | DB

 

 

 

 

 

 

 

 

AUSMAR@)

hemes

 

pobox6384 —p (07) 54426413
Maroochydore (07) 5450 6437
td 4558 QBCC 1083000

 

This plan remains copyright to

Ausmar Group and may not be

used in part or in whole without

‘the written consent of the author,
© 2017 Ausmar Group

 

WRITTEN DIMENSIONS TO.
TAKE PRECEDENCE OVER SCALE

 

FLOOR
COVERINGS

 

PROJECT DESCRIPTION:
Proposed Dwelling For:

 

CLIENT:
MR R. & MRS L, WILCOX

 

SITE ADDRESS:
LOT 35 (#8)
SUPPLEJACK COURT

LAKE MacDONALD

 

DESIGNED BY AUSMAR

 

DRAWN BY AUSMAR

 

18-10-17

 

CONSTRUCTION PLAN

ISSUE

 

 

ALEXANDRIA - TRADITIONAL (MOD)

Scale JOB CODE
DATE S-RLW
48-10-17

 

 

SHEET 120F 13

 

 

 

 

Page 13

 

EXTERNAL CONCRETE SCHEDULE

 

 

 

 

 

 

Mark! — Description Area Comments
EXC1 |EXPOSEDAGGREGATE [7.01m? [PORCH
| Grand total; 1 7.01 m*

PATIO BY OWNER:
AFTER HANDOVER

 

 

 

  
  

  
  
   
   
   

SUNCOAST
BUILDING APPROVALS

No: 172468 03 NOV 2017

Ss oP QBcc: AiS6aea
DEVELOPMENT. APPROVAL

NG WORKS .
PH: 5443 72088 BUILDING WG oa: 0406 516 167!

   

PROPOSED
DWELLING

GRATED DRAIN BY OWNER

 

 

@
@
ti)
()

 

EXTERNAL CONCRETE

 

WAFFLE POD SLAB SYSTEM TO PROPOSED DWELLING TO ENGINEERS DESIGN

AND SPECIFICATIONS
CONCRETE PATHS TO FALL AWAY FROM FOOTINGS AT 1:20 MAXIMUM
SAND BED UNDER PATHS AS REQUIRED.

10MM FOAM EXPANSION JOINT TO ALL AREAS WHERE EXTERNAL CONCRETE

MEETS MAIN HOUSE SLAB

LEGEND - INTERNAL

AP - APPLIANCE CUPBOARD
BC - BROOM CUPBOARD
C'BD - CUPBOARD.

DP + DOWNPIPE

DW - DISHWASHER PROV.
FW - FLOOR WASTE

GAS - GAS CONNECTION
HP - HOT PLATE

HWS - HOT WATER SYSTEM
L- LINEN

MH - MANHOLE

MW - MICROWAVE PROV.

 

999 — -m0g5- —- - - --—-—-—
2365

DRIVEWAY BY OWNER

SUPPLEJACK COURT

OHC - OVERHEAD CUPBOARD
PTY - PANTRY

R-ROBE

REF - REFRIDGERATOR SPACE
RH- RANGEHOOD

SH - SHELF

TR - TOWEL RAIL

TRH - TOILET ROLL HOLDER
UBO - UNDER-BENCH OVEN
‘WO - WALL OVEN

 

LEGEND - EXTERNAL

BV - BRICK VENEER

CJ- CONTROL JOINT

FC - FIBRE CEMENT SHEETING
RH - RENDERED HEBEL PANELS
RBB - RENDERED BLUEBOARD
RB - RENDERED BRICKWORK
RBL - RENDERED BLOCKWORK
SA ~-SCYON AXON

SL-SCYON LINEA

SM - SCYON MATRIX PANELING
SS - SCYON STRIA CLADDING
WEB - HARDIES NEWPORT

 

 

ISSUE

 

,#) DATE DETAILS BY

 

[ [04-08-17| NHP ISSUE

 

= |29-08-17/ WD ISSUE

 

A [29-09-17| CONST ISSUE

 

ede

B | 18-10-17/ COUNCIL AMEND

 

 

 

 

 

 

 

 

AUSMAR@

 

po hox 6384p (07) 5442 6413
maroochydore —f (07) 5450 6437
ald 4558 QBCC 1083000

 

This plan remains copyright to

Ausmar Group and may not be

used in part or in whole without

the written consent of the author.
© 2017 Ausmar Group

 

WRITTEN DIMENSIONS TO
TAKE PRECEDENCE OVER SCALE

 

EXTERNAL
CONCRETE

 

PROJECT DESCRIPTION:
Proposed Dwelling For:

 

CLIENT:
MR R. & MRS L. WILCOX

 

 

SITE ADDRESS:

LOT 35 (#8)
SUPPLEJACK COURT

LAKE MacDONALD

 

DESIGNED BY AUSMAR

 

DRAWN BY — AUSMAR
SCALE [ Jopc ~

JOB CODE

 

CONSTRUCTION PLAN 'B

 

 

 

ALEXANDRIA - TRADITIONAL (MOD)

 

1: 100
DATE S-RLW
1810-17

 

 

SHEET 130F 13

 

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.