Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Plans 1

Attached to the e-mail Operational Works Application OPW18/0028 - 8 Supplejack Crt Lake Macdonald.

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 

2.

| 3

 

¥€ (0,000 LTRs
MN mum
Port aloe. wale

 

 

GENERAL NOTES

ALL MATERIALS SHALL BE NEW.
FOOTING TO ENGINEER DETAILS.
FOOTINGS TO HAVE SOLID BOTTOMS
AND EVEN BEARING THROUGHOUT.
SLAB: TO ENGINEER DETAILS
UNDERLAY WITH 200mm POLYTHENE
WATERPROOF MEMBRANE AND ALL
PROTRUSIONS, CAST ON 50mm SAND
BEDDING ON APPROVED FILL
CONCRETE STRENGTH TO BE 20MPa
AT 28 DAYS, USE TERMTE CONTROL
AS PER BULDERS SPECIFICATIONS,
TIMBER FRAMING: ALL FIXINGS AS
PER CONNECTION DETAILS AND GOOD
WORKMANSHP. 2 Tita.

LININGS: AS PER BUILDERS SPECIFICATIONS.

ROOFING: COLORBOND METAL SHEET
ROOFING OR CONCRETE ROOF TILES
OVER AN APPROVED SARKING MATERIAL
AND FIXED IN ACCORDANCE WITH THE
MANUFACTURERS SPECIFICATIONS,
PLUMBER AND DRAINER: TO LOCAL,
AUTHORITY REGULATIONS,
ELECTRICIAN: TO LOCAL AUTHORITY
REGULATIONS. :

BRICKLAYER: GALVINISED WALL TIES

1 ROW AT 2 COURSES ABOVE FLASHING
LINE AND 7 ROW IN THE SECOND LAST
BED JOINT FROM TOP OF WALLAND @
‘S00ers, IN BETWEEN ON EACH STUD,
PROVIDE WEEP HOLES @ #00crs, ALONG
FLASHING,

ALL WET AREA FLOOR AND SHOWER FLOORS:

TO COMPLY WITH B.C.A. SECTION 3.8.1.
BUILDER TO CHECK AND CONFIRMALL

MEASUREMENTS PRIOR TO COMMENCEMENT
OF CONSTRUCTION, DO NOT SCALE DRAWINGS,
WRITTEN DIMENSIONS TAKE PRECEDENCE AT

ALL TIMES, STORMWATER THROUGH P.V.C.
PIPE TO LOCAL COUNCIL REGULATIONS.

15

SITE PLAN
1: 200

 

   
  

‘agetation

No: 17 2 és6,8

PH: 5443 7268

 SUNCOAST
"BUILDING APPROVALS

35
Q) FNOV 2017

ROSS BISHOP QBOG: A15666

PEVELOPMENT APPROVAL,

FOR BUILDING WORKS Pooaiarena?

 

 

     

 

 

  

 

 

 

 

 

| ag, SH- SHELF
ag a WATER & GAS SUPPLY TRA TOILET ROLL HOLDER
(i) ALL EXPOSED WATER AND GAS SUPPLY LINES TO BE METAL. UBO - UNDER-BENCH OVEN
& Fin WO - WALL OVEN
3/8 OPENINGS LEGEND - EXTERNAL
fla 27 i) DOORWINDOWS TO BE SCREENED. MAX APERTURE SIZE 2mm BV -BRICK VENEER
2 (i) VENTS/WEEPHOLES TO BE MESH COVERED TO MEET BAL |
Jo e382 . REQUIRMENTS, MAX APERTURE 2mm wl RHi- RENDERED ACOEL PANELS
LaF ie 42 (ii) DOORWINDOW FRAMES TO BE MADE OF FIRE-RESISTANT TIMBER Si] © RBB - RENDERED BLUEBOARD
zis 450x450x900 RUBBLE PIT " 7 36 (iv) GARAGE DOOR TO BE FITTED WITH NON-COMBUSTABLE WEATHERSTRIP. | = Ber een come
| 8 (INFILTRATION OVERFLOW PIT) é By ; WITH MAX 3mm GAPS 5 SA- SCYON AXON
* i 4 7 ; : ; (¥) ALL GLAZING TO COMPLY WITH REQUIREMENTS SL SCYON LINEA aNELING
“ ROOENG ie insanace
. > / :
mp i %2, (i) SKYLIGHTS TO BE MADE FROM A NON-COMBUSTABLE MATERIAL
= 3 (i) ANY ATTACHED ITEM ON ROOF (ie ANTENNA) ARE TO BE ADEQUATELY
- : ; mes SEALED TO THE ROOF TO PREVENT GAPS >3mm AND BE MADE PROPERTY
nae et FROM A NON-COMBUSTABLE MATERIAL
- nots = ge - (ii) VENTILATION OPENINGS SHALL BE FITTED WITH EMBER-GUARDS DESCRIPTION
ke, ° a BE MADE FROMA NON-COMBUSTABLE MATERIAL AND LOT) §=35 —_-SP103503
S . ne Cs HAVE A MAX APERTURE SIZE OF 2mm PARISH: NOOSA
24 A ~ — TA 8 oN (iv) SARKING/ANTICON MUST HAVE A FLAME-INDEX GREATER THAN 5, COUNTY : MARCH
of 7 {v) SARKING TO COVER ENTIRE ROOF AREA TO EDGE OF FASCIA. ey AREA: 109m?
| gS | (vi) ALL GUTTERS TO BE NON-COMBUSTABLE AND CONTAIN GUTTER-GUARD.| = |
3 (vii) ALL VALLEYS TO BE COVERED BY GUTTFR-GUARD .
z Existing
* & | & Highset ISSUE
| Be ns Timber & GI [#] Date DETAILS BY
5 E ee | 42 House = [04-08-17] NHP ISSUE DB
‘ - Well Away  |29-08-17| WD ISSUE SjB
A |29-09-17] CONST ISSUE OB
| a> 46 B /18-10-17] COUNCIL AMEND] DB.
“090
22,700. :
Own: POLY TANK ; | Ss 45 ae
Stak ; © o7 =o
PROPOSED DWELLING & “8 SHSGHARGE TO: AUSMA R®)
PAD LEVEL 97.750 ans 7 HSTP aa COKERE & CHANNEL CISUITABLE SIZED SOAKAGE PIT =“
22,700L : Wy CIQSPERSE ON SITE CUINTER ALLOTMENT DRAINAGE PIT po box 8384 (07) S442 6419
% AINWATER STORAGE TANKS [“]TO EXISTING APPROVED SYSTE adage Gee 1089000
HSTPTOBEIN oy 7s . STORAMVATER TO BE DISCHARGED SO AS TO'NOT CAUS Ausrar Group and may ote
ACCORDANCE WITH ADJOINING NERS a in part or Inwhote w wnout
EEOreSHNICALDESGN A a © STORMWATER SYSTEM TO COMPLY WITH AS3500 PART 4 6 2017 Ausmar Group
SPECIFICATION é ® ALL OTHER DETAILS #9 LOCAL GOVERNMENT WRITTEN DIMENSIONS TO
Eg “6, REQUIREMENTS = ‘TAKE PRECEDENCE OVER SCALE
° 48 a
98.25 50 Oo SITE PLAN
Owners S
oN Stain . =
Fg ENE 98.50 ; a —J | PROJECT DESCRIPTION:
7 Sy, | s Proposed Dwelling For:
98.75 : © [cuent:
58 | F— |MRR.&MRS L. WILCOX
52 % Qa
Owners PROPOSED PROPERTY POLE 5354 s rs
Stake 2 LOCATION. TO BE CONFIRMED sg , Sy FE |tor 3s as)
— —iL, 55.46 as 1 | SUPPLEJACK COURT
92°05'25" Fe Se ee Os <C_ | LAKE MacDONALD
POSITION Sa _ FF. QC | vestenep sy ausMAR
e - Ose create eee oe Q Joramey  oprown
gS - z |orawn =a
EXISTING ACCESS DRIVEWAY SUPPLEJACK COURT 55 Ss a JOB CODE
a 4 £ DATE S-RLW
gp CONSTRUCTION PLAN | SS | YW htetow
S$ _
: DRIVEWAY CROSS SECTION SEE PAGE 6. ee B | S| sucer 4 of 43

 

  

 

 

 

 

 

 

 

 

 

 
  
  
   

 

 

 
 

at

  
 
  

NB: SITE DESIGNATED BUSHFIRE PRONE
Construction in accordance with AS3959-2009,

Narth./ South / East / West /-AllL Elevations.

BAL \S to North Geuth+East:West/ All Elovatians

Refer to conditions on permit

NOTE:
BATTERS IN ACCORDANCE WITH
ENGINEERS DETAILS & NCC REQUIREMENTS

 
    
  

 

SITE COVER

SITE AREA : 4109.00 m?

DWELLING SITE COVER : 5.55 % ( 228.07m*)
OUTDOOR AREA SITE COVER: 0.95 % ( 39.12m?)
TOTAL SITE COVERAGE : 6.50 % ( 267.19m?)

 

 

BUSHFIRE REQUIREMENTS - BAL19

DESIGN IN ACCORDANCE WITH AS 3959-2009
REFER SECTION 3 & 6 FOR DETAILED REQUIREMENTS

 

 

  

 

 

 

 

 

 

LEGEND - INTERNAL

AP - APPLIANCE CUPBOARD
BC - BROOM CUPBOARD
C’BD - CUPBOARD

DP - DOWNPIPE

DW - DISHWASHER PROV.
FW- FLOOR WASTE

GAS - GAS CONNECTION

HP - HOT PLATE

HWS - HOT WATER SYSTEM
L-LINEN

MH - MANHOLE

MW - MICROWAVE PROV.

OHC - OVERHEAD CUPBOARD.
PTY - PANTRY

R-ROBE

REF - REFRIDGERATOR SPACE
RH - RANGEHOOD:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
Log in to download the original file

Plans 1.pdf · 1.7 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.