Original source · versioned page text
Plans 1
Attached to the e-mail Operational Works Application OPW18/0028 - 8 Supplejack Crt Lake Macdonald.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn
VARIABLE
25mm RADIUS
=—
WIDTH AS PER SPEC
2760/486015260
| A-PANEL-LIFT DOOR RECESS
| 1:20
2
a
700x450 Hi
g 8 (EBEL PIER
BATTEN CAVITY
FRAME
CAVITY
19
a
2
450
450
75 26 250 2 75
at
FRAME
4 CAVITY
f— HEBEL
FIXING BATTEN
MAIN SLAB LEVEL
a of ff
ox &
= r
=
EXTERNAL SLAB LEVEL S. :
APPROVED TERMITE BARRIER nn
TO PERIMETER OF BUILDING AND TO.
‘ALL SLAB PENETRATIONS. INSTALL IN
ACCORDANCE WITH MANUFACTURERS:
SPECIFICATIONS AND AS3660
GROUND LEVEL
F - HEBEL COLUMN
1:10
75 26
Ar
SARKING TO WALLS AS TIMBER FRAME
PER SPECIFICATION AS SPEC
20-25mm BATTENS {TERMITE PROTECTION
AS PER SPEC,
HEBEL ——-
POWERWALL 9 fo
SYSTEM 7 > :
CONCRETER TO ENSURE —=}" 100° 3
NEAT FINISH TO SLAB EDGE —
“4 =
WAFFLE-POD. -—-—————}-=—
SLAB SYSTEM TO ENG, a
DESIGN & SPECIFICATIONS
__B-HEBEL SLAB EDGE
| 1:10
140x140 LAMINATED
HARDWOOD POST
GAL STIRRUP
TO CONCRETE FOOTING.
2/M12 BOLTS TO POST
“SAND FILL —
OPTIONAL CONCRETE —}+
PATIO SLAB
CONCRETE FOOTING TO
ENGINEERS DETAIL
| D-POST SECTION
| 1:20
LINE OF FRAME
INTERIOR FLOOR
COVERING
CONCRETE
SLAB
FIBRE CEMENT
PACKERS
La
i —=— OUTSIDE FACE
|
lp] OF HEBEL
LINE OF FRAME =; | DOOR TRACK
xorpon fb} I | ;——— TILED LEDGE
i
"
J bn
i)
SHOWER SCREEN
50mm ALUM. ANGLE. —, —_ AS PER SPEC.
CONCRETE SLAB
SKIM-COAT RENDER TO
SLAB EDGE FACE
C - HEBEL DOOR SILL DETAIL
1
-— FALL TO WASTE
— / /— FLOOR
WASTE
ir aad 4 4 : Le
ed . :
a” = .4 “4
WATERPROOF MEMBRANE —— ——— TILERS BEDDING
IN ACCORDANCE WITH COMPOUND
BCA 3.8,1 REQUIREMENTS
OUTSIDE FACE
OF WALL
SCREEN DOOR TRACK
DOOR TRACK
E- SHOWER HOB
1:10
SUNCOAST
BUILDING APPROVALS
LEGEND - INTERNAL
AP - APPLIANCE CUPBOARD.
BC - BROOM CUPBOARD.
C'BD - CUPBOARD
OP - DOWNPIPE
DW - DISHWASHER PROV.
FW - FLOOR WASTE
GAS - GAS CONNECTION
HP - HOT PLATE
HWS - HOT WATER SYSTEM
L- LINEN
MH - MANHOLE
MW - MICROWAVE PROV.
OHC - OVERHEAD CUPBOARD
PTY - PANTRY
R-ROBE
REF - REFRIDGERATOR SPACE.
RH- RANGEHOOD
‘SH - SHELF
TR - TOWEL RAIL
TRH - TOILET ROLL HOLDER
UBO - UNDER-BENCH OVEN
WO - WALL OVEN
LEGEND - EXTERNAL
BV - BRICK VENEER
CJ- CONTROL JOINT
FC - FIBRE CEMENT SHEETING
RH - RENDERED HEBEL PANELS
RBB - RENDERED BLUEBOARD
RB ~ RENDERED BRICKWORK
RBL - RENDERED BLOCKWORK
SA- SCYON AXON
SL- SCYON LINEA
SM - SCYON MATRIX PANELING
SS - SCYON STRIA CLADDING
WB - HARDIES NEWPORT
ISSUE
#| DATE DETAILS BY
04-08-17] NHP ISSUE DB
|29-08-17] WD ISSUE ‘SjB
A |29-09-17| CONST [SSUE DB
B
18-10-17| COUNCIL AMEND | DB
pobox 6384p (07) $442. 6413
Maroochydore f (07) 54506437
aid 4558 QBCC 1083000
This plan remains copyright to
Ausmar Group and may not be
used in part or in whole without
the written consent of the author.
©2017 Ausmar Group
WRITTEN DIMENSIONS TO
TAKE PRECEDENCE OVER SCALE
DETAILS
PROJECT DESCRIPTION:
Proposed Dwelling For:
18-10-17
a
o
=
4
ft
6
CLIENT:
No. 172468 03 NOV 2017 — |MRR.&MRSL. WILCOX
ROSS BISHOP. gaeg: pit agee a
DEVELOPMENT APPROVAL <
FOR BUILDINGAWORKS SITE ADDRESS:
Pri 8248 7286 MOS: 6406 §16 167 F- | LOT 35 (#8)
1 | SUPPLEJACK COURT
<{_ [LAKE MacDONALD
aw DESIGNED BY AUSMAR
9 DRAWN BY AUSMAR
x Scae | sopcone |
CONSTRUCTION PLAN ] "= | 44 [c,,| S-RLW
<x
SHEET 7 OF 13,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.