RA6-N SARA reference: 2505-45871 SRA Council reference: OPW25/0072 Applicant reference: 2319 24 December 2025 Chief Executive Officer Noosa Shire Council PO Box 141 Tewantin QLD 4565 [email protected] Attention: Mr Mark Lewis Dear Mr Lewis SARA referral agency response—36 Roses Road, Federal (Referral agency response given under section 56 of the Planning Act 2016) The development application described below was confirmed as properly referred by the State Assessment and Referral Agency (SARA) on 23 May 2025. Response Outcome: Referral agency response – with conditions Date of response: 24 December 2025 Conditions: The conditions in Attachment 1 must be attached to any development approval Advice: Advice to the applicant is in Attachment 2 Reasons: The reasons for the referral agency response are in Attachment 3 Development details Description: Development permit Operational work for drainage works, earthworks, roadworks, clearing vegetation under planning scheme, and vehicle crossover SARA role: Referral agency SARA trigger: Schedule 10, Part 6, Division 4, Subdivision 3, Table 1, Item 1 (Planning Regulation 2017) Operational work for waterway barrier works North and North West regional office Level 4, 445 Flinders Street, Townsville Page 1 of 7 PO Box 5666, Townsville QLD 4810
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
2505-45871 SRA
SARA reference: 2505-45871 SRA
Assessment manager: Noosa Shire Council
Street address: 36 Roses Road, Federal
Real property description: Lot 2 on RP95476
Applicant name: Mick Jones
Applicant contact details: C/- PO Box 2305
Noosa Heads QLD 4567
[email protected]
Human Rights Act 2019 A consideration of the 23 fundament human rights protected under the
considerations: Human Rights Act 2019 has been undertaken as part of this decision.
It has been determined that this decision does not limit human rights.
Representations
An applicant may make representations to a concurrence agency, at any time before the application is
decided, about changing a matter in the referral agency response (s.30 Development Assessment
Rules). Copies of the relevant provisions are in Attachment 4.
A copy of this response has been sent to the applicant for their information.
For further information please contact Bronwyn Bignoux, Principal Planning Officer, on 4747 3907 or via
email [email protected] who will be pleased to assist.
Yours sincerely
Jamaica Hewston
Manager
cc Mick Jones, [email protected]
enc Attachment 1 - Referral agency conditions
Attachment 2 - Advice to the applicant
Attachment 3 - Reasons for referral agency response
Attachment 4 - Representations about a referral agency response provisions
Attachment 5 - Documents referenced in conditions
State Assessment and Referral Agency Page 2 of 7
Page 3
2505-45871 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)
No. Conditions Condition timing
Operational work
10.6.4.3.1.1 – Operational work for waterway barrier works—The chief executive administering the
Planning Act 2016 nominates the Director-General of the Department of Primary Industries to be the
enforcement authority for the development to which this development approval relates for the
administration and enforcement of any matter relating to the following condition(s):
1. Development is limited to the operational works to raise or construct At all times
a waterway barrier work that is a permanent reinforced concrete box
culvert crossing within Skyring Creek as shown on:
36 Roses Road Federal, Locality Plan & Drawing Index,
Operational works, by Callaghan & Toth, dated 11/25, reference
2319-001, revision C, as amended in red by SARA.
36 Roses Road Federal, Design Features Plan, Operational
works, by Callaghan & Toth, dated 11/25, reference 2319-006,
revision C, as amended in red by SARA.
36 Roses Road Federal, Typical Culvert Detail Section,
Operational works, by Callaghan & Toth, dated 11/25, reference
2319-007, revision C, as amended in red by SARA.
36 Roses Road Federal, Typical Road Sections, Operational
works, by Callaghan & Toth, dated 11/25, reference 2319-008,
revision C, as amended in red by SARA.
36 Roses Road Federal, Design Longitudinal Section &
Pavement Info, Operational works, by Callaghan & Toth, dated
11/25, reference 2319-009, revision C, as amended in red by
SARA.
36 Roses Road Federal, Concrete Joint Plan & Details 1 of 2,
Operational works, by Callaghan & Toth, dated 11/25, reference
2319-011, revision C, as amended in red by SARA.
36 Roses Road Federal, Concrete Joint Plan & Details 2 of 2,
Operational works, by Callaghan & Toth, dated 11/25, reference
2319-012, revision C, as amended in red by SARA.
36 Roses Road Federal, Typical Design Upstream &
Downstream Sections, Operational works, by Callaghan & Toth,
dated 11/25, reference 2319-013, revision C.
36 Roses Road Federal, Tree Management Plan, Operational
works, by Callaghan & Toth, dated 11/25, reference 2319-014,
revision C, as amended in red by SARA.
36 Roses Road Federal, Concept Erosion & Sediment Control
Plan, Operational works, by Callaghan & Toth, dated 11/25,
reference 2319-015, revision C, as amended in red by SARA.
2. The reinforced concrete box culvert array approved in condition 1 At all times
must have a minimum combined cell aperture width of 10.8 meters,
State Assessment and Referral Agency Page 3 of 7
Page 4
2505-45871 SRA
include at least one scupper drain on the downstream kerb, and
include roughening elements such as a broom finish, exposed
aggregate, shot-crete or similar treatment on concrete aprons.
3. Maintain the development in accordance with the plans referenced in At all times
condition 1, and the requirements of any conditions included in this
development approval.
4. Submit written notice to the Department of Primary Industries at (a) At least 5 business
[email protected] advising when the development days but no greater
authorised under this approval: than 20 business
days prior to the
(a) will start
commencement of
(b) when it has been completed. the works
Any notice must state the application’s reference number: 2505- (b) Within 15 business
45871 SRA. days of the
completion of the
fisheries
development works
5. Spoil is not disposed of within waterways. At all times
6. This fisheries development (as defined by the Fisheries Act 1994) At all times
constitutes a place that is required to be open for inspection by an
inspector, pursuant to section 145 of the Fisheries Act 1994.
7. Restore land profiles that are temporarily disturbed by the Within 10 business
development works to pre-work profiles. days of completion of
the works and prior to
post works notification
8. Provide upstream and downstream fish passage across the At all times
waterway barrier.
9. The fish passage provided must cater for the whole fish community At all times
taking into account species, size classes, life stages and swimming
abilities as well as the seasonal and flow related biomass of the fish
community.
10. Construct and maintain the waterway barrier and any associated At all times
infrastructure including, but not limited to intakes, walls, access
structures, spillways and dissipation devices to avoid fish injury,
mortality and/or entrapment.
11. Remove any temporary waterway barrier(s) immediately after the Within 15 business
new culvert structure has been completed. days of completion of
the works
12. Works within a waterway must be avoided during times of elevated For the duration of the
flows (AEP 20% or higher). works
13. The scour protection must be constructed and maintained at or At all times
below bed level so that there are no drops in elevation where it
adjoins culvert aprons.
State Assessment and Referral Agency Page 4 of 7
Page 5
2505-45871 SRA
Attachment 2—Advice to the applicant
General advice
1. Terms and phrases used in this document are defined in the Planning Act 2016, its regulation
or the State Development Assessment Provisions (SDAP) (version 3.2). If a word remains
undefined it has its ordinary meaning.
2. This referral response does not consider or approve access to the state-controlled road
corridor. Separate approvals are required to authorise any direct access to the state-controlled
road.
State Assessment and Referral Agency Page 5 of 7
Page 6
2505-45871 SRA
Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)
The reasons for the SARA’s decision are:
SARA assessed the development against the following code(s) of the State Development
Assessment Provisions (SDAP), version 3.2:
o State code 18: Constructing or raising waterway barrier works in fish habitats
The proposed development complies with the assessment benchmarks of State code 18 of SDAP in
that the development:
o maintains fish movement and connectivity throughout waterways and within and between fish
habitats;
o maintains the health and productivity of fisheries resources and fish habitat; and
o provides adequate fish passage.
Material used in the assessment of the application:
the development application material and submitted plans
Planning Act 2016
Planning Regulation 2017
the SDAP (version 3.2), as published by SARA
the Development Assessment Rules
SARA DA Mapping system
section 58 of the Human Rights Act 2019.
Attachment 4—Representations about a referral agency response
provisions
(page left intentionally blank)
State Assessment and Referral Agency Page 6 of 7
Page 7
2505-45871 SRA Attachment 5—Documents referenced in conditions (page left intentionally blank) State Assessment and Referral Agency Page 7 of 7