2505-45871 SRA - Response with conditions
Attached to the e-mail 2505-45871 SARA Response with conditions - OPW25/0072.
2505-45871 SRA
include at least one scupper drain on the downstream kerb, and
include roughening elements such as a broom finish, exposed
aggregate, shot-crete or similar treatment on concrete aprons.
3. Maintain the development in accordance with the plans referenced in At all times
condition 1, and the requirements of any conditions included in this
development approval.
4. Submit written notice to the Department of Primary Industries at (a) At least 5 business
[email protected] advising when the development days but no greater
authorised under this approval: than 20 business
days prior to the
(a) will start
commencement of
(b) when it has been completed. the works
Any notice must state the application’s reference number: 2505- (b) Within 15 business
45871 SRA. days of the
completion of the
fisheries
development works
5. Spoil is not disposed of within waterways. At all times
6. This fisheries development (as defined by the Fisheries Act 1994) At all times
constitutes a place that is required to be open for inspection by an
inspector, pursuant to section 145 of the Fisheries Act 1994.
7. Restore land profiles that are temporarily disturbed by the Within 10 business
development works to pre-work profiles. days of completion of
the works and prior to
post works notification
8. Provide upstream and downstream fish passage across the At all times
waterway barrier.
9. The fish passage provided must cater for the whole fish community At all times
taking into account species, size classes, life stages and swimming
abilities as well as the seasonal and flow related biomass of the fish
community.
10. Construct and maintain the waterway barrier and any associated At all times
infrastructure including, but not limited to intakes, walls, access
structures, spillways and dissipation devices to avoid fish injury,
mortality and/or entrapment.
11. Remove any temporary waterway barrier(s) immediately after the Within 15 business
new culvert structure has been completed. days of completion of
the works
12. Works within a waterway must be avoided during times of elevated For the duration of the
flows (AEP 20% or higher). works
13. The scour protection must be constructed and maintained at or At all times
below bed level so that there are no drops in elevation where it
adjoins culvert aprons.