SBSMR 20004 Revision C - Op Works Application

From the archive Stormwater Submission.zip, inside Operational Works Application OPW21/0272 Submission - DA Form 1 - Plans - Geotech Report - 32 Viewland Dr, Noosa Heads. File date in the archive: 2021-09-21 15:20.

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

5.1 PIPED DRAINAGE SYSTEM – PRE-DEVELOPMENT

Total Catchment is 3105m2


Coefficient of Runoff

The coefficient of runoff for the existing site has been determined using light cover bush with a
high soil permeability (sand) for zero fraction impervious, giving a C10 value of 0.53.

Time of Concentration

Slope of catchment: Length 55m, fall 4m.
Therefore Slope = 4/55 x 100 = 7.3%
For average grassed surface n = 0.045
Using Friend’s Equation:
       t       = 107nL0.333/S0. 2
               = 107 x 0.045 x 55.333/7.30.2      =          12.3 minutes
However, adopt a time of 10 minutes.

                        EY %     ARI               10 min Rainfall Intensity
                          1       1                          102
                         0.2      5                          155
                        0.11     10                          181
                        0.05     20                          205
                        0.02     50                          236
                        0.01     100                         259
                                       Table 1 – 10min Rainfall Intensity


Using these values the pre-development flows are as follows

                     EY %       ARI             Pre Development Flows m3/s
                       1         1                         0.037
                      0.2        5                         0.067
                     0.11       10                         0.083
                     0.05       20                         0.098
                     0.02       50                         0.124
                     0.01       100                        0.142
                                        Table 2 - Site Pre-Development




NMA-SBSWMR-20004 Noosa Youngcare                                                                    8
Log in to download the original file

SBSMR 20004 Revision C - Op Works Application.pdf · 2.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.