Skip to the record
For the highest quality transcripts.

Council archive · source document

PBA11/0077 Development Application - part 2 - IDAS Forms & Covering letter

of 11

Text shows just the words. Original shows the document exactly as it was published.

 THIS IS THE FIRST PART OF A
MULTIPLE PART RECORD
   Checklist 1 Part                             1 -' Of 7
                       (Please Circle)

 ication number:                                 /'A          ^           U hl           7
  11ON MANAGENIFIN   ('ORDS MANAGEME.YTTContml of Rw di LDRMS^Muhi Put Record Coav Shcet FIRST PART do
Full text of the other 10 pages

Page 2

   Stonehen ge
  III! Consukin
         , e rtificati o g
                      t1 llC^lIl ^ C           n
                                                                  DeveIopmenf Co
                                                                                              enter
                                                                             2Q r T 2011
   25 October 2011
                                                                  1 J          War,tjn
   Sunshine Coast Regional Council
   Locked Bag 72
   Sunshine Coast Mail Centre Old 4560


  Nc l^ wr 4
   Siting Relaxation - 9 Bayview Rd, Noosa Heads, Old, 4567.

   Dear Sir/madam,


   As certifiers, we act on behalf of the architect to lodge the siting relaxation for a siting relaxation to
   allow a new roof on the existing dwelling to exceed a height of 8m. The main purpose of providing
   a new roof is to provide cover to the existing balconies from rain and sun and therefore creating
   more energy efficient design by using natural shading. The balconies are subject to a lot of rain
   and this has caused drainage issues. The proposed new rood will actually be less obtrusive than
   the existing roof as can be seen from the perspective drawings provided.

   At the front there is also a new awning proposed at 5400 mm from the front boundary in lieu of
   6000 mm which will shade the new windows W 13. (See drawing SD-D01).

 --We believe that the amenity of adjacent land and dwellings is not compromised by new roof height
   or the awnings projecting 600 mm into the 6000 mm front setback.

   The building character, appearance, views and vistas of neighbouring properties is also not
   reduced.

   We support the proposal.

   If any further further details are required, please advise. We look fo iarO-tora ppsitive result.


   Yours faithfully




   Paul Eltringham - Director
   Stonehenge Consulting Pty Ltd


PO Box 1326. Coolum Beach QLD 4573                                                 ylark St. Coolum Beach       4573


    p 07 5446 5533                 f 07 5446 2742            www.stonehengeconsulting.com.au

Page 3

Application Details - IDAS form I
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)



You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.

For all development applications, you must:

•     complete this form (Application details - IDAS form 1)
•     complete any other forms relevant to your application
•     provide any mandatory supporting information identified on the forms as being required to accompany your
      application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.


Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)


Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.


Name/s (individual or company name in full)                               t(Z             oCK


For companies, contact name                                         A N o r es        f>o c K A-ec t4 i r c-- (ZE

Postal address                                                      eo 't?::. oX         21 z2_ t\)OO l4 h'kpS
Contact phone number                                                c           S      Ssd1
Mobile number (non-mandatory)                                       0(12             W- (g6
Fax number (non-mandatory)


e-mail address (non-mandatory)                                            dcarck P oe vS-le` t , Cote) , et tA-


1. What is the nature of development proposed? (tick all applicable boxes)


q    material change of use of premises

q    building work

     operational work
                                                                         Develop
                                                                                       Ment Counter
     reconfiguring a lot
                                                                                     2 5 OCT 2011

                                                                                    Tewantin


     ^nf fMrastructure and Planning                                      ()Plan                          Queensland
                                                                                                    :^   Government
       ..^.,

Page 4

qoq
2. What type of approval is being sought?


q    development permit
     preliminary approval

q    both - provide details below



3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?


     No
q    Yes - complete table A and then go to question 5




4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)

Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises

                                                                                  Lot on plan
                  Street Address
                                                                                  description
                                                                                                          o al government area
                  Unit   Street       Street name and o fficial   I   Post               Plan type         (e.g. Logan,Cairns)
                                                                              Lot No.
                  No.     No.          subu rb/locality n ame         code              and plan no.

              1           9       ^ rc-^'" %e -, J                    y SV1             eeftID5           Sc P- (-
q Street address / lot on plan                 WQOSA       qlbs
  Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
q water e.g. jetty, pontoon)
Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)

                  Coordinates (note: place each set of
                  coordinates in a separate row)                          Zone                               Local government
                                                                                            Datum
                                                                        reference                            area (If applicable)
                    Easting       Northing    Latitude    Longitude

                                                                                        q GDA94
                                                                                        q WGS84
              1
                                                                                        q other



5. Total area of the premises on which the development is proposed (indicate hectares or m')


6. Current usels of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)


          1


7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)




                                                                                                     Application Det:) , IDAS form 1
                                                                                                       Version 1 0 18 December 2009

Page 5

qqq
8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)


     No

q    Yes - complete either table D, table E or table F as applicable



9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)

                                 q Yes - complete table G



10. Identify if any of the following apply to the premises (tick applicable box/es)

       adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
       on strategic port land under the Transport Infrastructure Act 1994 - complete table I
       in a tidal water area - complete table J


11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
    water, etc.)


q No 'Yes - ensure the type, location and dimension of each easement is included in the plans submitted

12. Does the proposal include new building work or operational work on the premises? (including any
    services)

q No 'Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted


13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
    end of this form for more information)


[] No - Go to question 15                      Yes



15. Has the local government agreed to apply a superseded planning scheme to this application under
    section 96 of the Sustainable Planning Act 2009?


q    No

q    Yes - provide details below


16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)

                                                                                                   Method of lodgement to
                              Description of attachment or title of attachment
                                                                                                    assessment manager




17. Applicant's declaration

 q    By making this application, I declare that all information in this application is true and correct (note: it is
      unlawful to provide false or misleading information).



                                                                                              Application Details - IDAS form I
                                                                                                Version 1.0 18 December 2009

Page 6

 Notes for completing this form

Question 8:
•  Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
   for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
   required under section 263, then an application must contain, or be accompanied by, the written consent of the
  owner, or include a declaration by the applicant that the owner has given written consent to the making of the
   application.
• Owner's consent is not required for a mobile and temporary ERA.

Question 9:
•  Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
   regulation may require the application to be supported by certain evidence prescribed under the regulation.
   Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
   required to be given, and the evidence required, to support the application.

Question 13:
•  The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
   long service leave levy is payable.
•  The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
   are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14:
•  The portable long service leave levy need not be paid when the application is made, but the Building and
   Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
   permit is issued.
•  Building and Construction Industry Notification and Payment Forms are available from any Queensland post
   office or agency, on request from QLeave, or can be completed on the QLeave website at
   www.gleave. Id.gov. au. For further information contact QLeave on 1800 803 481 or www.qleave.qtd.gov.au.

Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.


OFFICE USE ONLY


Date received                                Reference numbers


NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER


                                                      Council. I have been engaged as the private certifier for the
To:                                                   building work referred to in this application.



Date of                                                                   BSA Certification       Building
                    Name
engagement                                                                license number          classification/s




                                                                                         App-:-, r -- Detarc - IDAS form 1
                                                                                           Version 1.0 18 December 2009

Page 7

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)


                                                                               Date receipted
                                      QLeave Project    Amount                 form sighted by Name of officer who
              Description of the work                              Date paid
                                      Number            paid ($)               assessment      sighted the form
                                                                               manager


        1

The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.




                                                                                      Appl'.,r  De's :s - IDAS form ;
                                                                                       Version 1.0 18 Dece,rber 2009

Page 8

                                Integrated Development Assessment System form


 Building or operational work assessable
 against a planning scheme - IDAS form 6
 (Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

 This form must be completed for development applications for building works or operational work assessable against
 a planning scheme.
 You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
 necessary information and documentation will result in your application not being a properly made application.
 For all development applications, you must:
 •      complete Applicant details - IDAS form 1
 •      complete any other forms relevant to your application
 •      provide any mandatory supporting information identified on the forms as being required to accompany your
        application.

 AJI terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
 Regulation 2009.

This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.


 1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)


J°1 building work - complete table A                  q operational work - complete table B


2. What is the dollar value of the proposed building work? (inc GST, materials and labour)
                                                                                                $ l op I C-.X; PC>




     Department of Infrastructure and Planning                            QPlan                   Queensland
                                                                                              ^% Government

Page 9

3. Confirm the following mandatory supporting information accompanies this application
                                                                                 Confirmation
                                                                                                   Method of lodgement
                                                                                 of lodgement
All applications for operational works

site plans drawn to scale which show the following:
•   the location and site area of the land to which the application relates
    (relevant land)
•   the north point
•   the boundaries of the relevant land
•   the allotment layout showing existing lots, any proposed lots (including
    the dimensions of those lots), existing or proposed road reserves,           U confirmed
    building envelopes and existing or proposed open space (note:
    numbering is required for all lots)
•   any existing or proposed easements on the relevant land and their
    function
•   any access limitation strips
•   all existing and proposed roads and access points on the relevant land

a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents                   'confirmed
relevant to the application
Applications for operational works involving earthworks (filling and excavating)


drawings showing:
•   existing and proposed contours
•   areas to be cut and filled
•   the location and level of any permanent survey marks or reference
    stations used as datum for the works                                         q confirmed
•   the location of any proposed retaining walls on the relevant land and
    their height
•   the defined flood level (if applicable)
•   the defined fill level (if applicable)
Applications for operational works involving roadworks

drawings showing:
•   existing and proposed contours
•   the centreline or construction line showing chainages, bearings, offsets
    if the construction line is not the centreline of the road and all
    intersection points
• information for each curve including tangent point chainages and
    offsets, curve radii, arc length, tangent length, superelevation (if
    applicable) and curve widening (if applicable)
•   kerb lines including kerb radii (where not parallel to centreline) and
    tangent point changes (where not parallel to centreline)
•   edge of pavement where kerb is not constructed                               q confirmed
•   position and extent of channelisation
• location and details of all traffic signs, guideposts, guardrail and other
    street furniture
•   pavement markings including details on raised pavement markers
•   catchpit, manhole and pipeline locations
•   drainage details (if applicable)
•   cross road drainage culverts (if applicable)
•   concrete footpaths and cycle paths
• location and details for access points, ramps and invert crossings
•   changes in surfacing material

                                              Budding and operational work assessable against a planning scheme - IDAS form 6
                                                                                                 Version 1, 0 18 December 2009

Page 10

qP
                                                                                 Confirmation
                                                                                                   Method of lodgement
                                                                                 of lodgement
Applications for operational works involving stormwater drainage

drawings showing:
•   existing and proposed contours
•   drainage locations, diameters and class of pipe, open drains and
    easements                                                                        confirmed
• manhole location, chainage and offset or co-ordinates and inlet and
    outlet invert levels
• inlet pit locations, chainage and offset or co-ordinates and invert and
    kerb levels
Applications for operational works involving water reticulation


drawings showing:
•   kerb lines or edge of pavement where kerb is not constructed
• location and levels of other utility services where affected by water
    reticulation works
•   pipe diameter, type of pipe and pipe alignment
•   water main alignments
                                                                                 q confirmed
•   water supply pump station details (if applicable)
•   minor reservoir details (if applicable)
•   conduits
•   location of valves and fire hydrants
• location of house connections (if applicable)
• location of bench marks and reference pegs
Applications for operational works involving sewerage reticulation


drawings showing:
• location of all existing and proposed services
• location of all existing and proposed sewer lines and manhole locations
• location of all house connection branches
• kerb lines or edge of pavement where kerb is not constructed
• chainages                                                                         confirmed
• design sewer invert levels
• design top of manhole levels
• type of manhole and manhole cover
• pipe diameter, type of pipe and pipe alignment
• location of house connections (if applicable)
• sewer pump station details (if applicable)

Applications for operational works involving street lighting

drawings showing:
• location of all light poles and service conduits
• location of all other cross road conduits
•   type of wattage and lighting
•   any traffic calming devices                                                  q confirmed

•   additional plans for roundabouts and major roads (if applicable)
•   details of any variations to normal alignment
•   details of lighting levels




                                              Build,ng and operational work assessable against a planning scheme - IDAS form 6
                                                                                                  Version 10 18 December 2009

Page 11

qL
                                                                                Confirmation
                                                                                                 Method of lodgement
                                                                                of lodgement
Applications for operational works involving public utility services
drawings showing:
• any existing light poles and power poles
•   any existing underground services                                             confirmed
•   details of proposed services
•   alternation to existing services
Applications for operational works involving landscaping works

drawings showing:
•   the location of proposed plant species
•   a plant schedule indicating common and botanical names, pot sizes
    and numbers of plants
•   planting bed preparation details including topsoil depth, subgrade
    preparation, mulch type and depth, type of turf, pebble, paving and        []confirmed
    garden edge
•   the location and type of any existing trees to be retained
•   construction details of planter boxes, retaining walls and fences
• the proposed maintenance period
• irrigation system details


Notes for completing this form:
• This form can also be used for development applications for building works or operational works assessable
    against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
    mentioned, take it to mean the land use plan for the airport land.



Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form.



OFFICE USE ONLY


Date Received                           Reference Numbers



The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.




                                             Bw!d;ng and operatroral work assessable against a manning scheme - IDAS form 6
                                                                                                Version 10 18 December 2009

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

PBA11_0077 Development Application - part 2 - IDAS Forms & Covering letter.pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.