Council archive · source document
PBA11/0077 Development Application - part 2 - IDAS Forms & Covering letter
THIS IS THE FIRST PART OF A
MULTIPLE PART RECORD
Checklist 1 Part 1 -' Of 7
(Please Circle)
ication number: /'A ^ U hl 7
11ON MANAGENIFIN ('ORDS MANAGEME.YTTContml of Rw di LDRMS^Muhi Put Record Coav Shcet FIRST PART do
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 10 pages
Page 2
Stonehen ge
III! Consukin
, e rtificati o g
t1 llC^lIl ^ C n
DeveIopmenf Co
enter
2Q r T 2011
25 October 2011
1 J War,tjn
Sunshine Coast Regional Council
Locked Bag 72
Sunshine Coast Mail Centre Old 4560
Nc l^ wr 4
Siting Relaxation - 9 Bayview Rd, Noosa Heads, Old, 4567.
Dear Sir/madam,
As certifiers, we act on behalf of the architect to lodge the siting relaxation for a siting relaxation to
allow a new roof on the existing dwelling to exceed a height of 8m. The main purpose of providing
a new roof is to provide cover to the existing balconies from rain and sun and therefore creating
more energy efficient design by using natural shading. The balconies are subject to a lot of rain
and this has caused drainage issues. The proposed new rood will actually be less obtrusive than
the existing roof as can be seen from the perspective drawings provided.
At the front there is also a new awning proposed at 5400 mm from the front boundary in lieu of
6000 mm which will shade the new windows W 13. (See drawing SD-D01).
--We believe that the amenity of adjacent land and dwellings is not compromised by new roof height
or the awnings projecting 600 mm into the 6000 mm front setback.
The building character, appearance, views and vistas of neighbouring properties is also not
reduced.
We support the proposal.
If any further further details are required, please advise. We look fo iarO-tora ppsitive result.
Yours faithfully
Paul Eltringham - Director
Stonehenge Consulting Pty Ltd
PO Box 1326. Coolum Beach QLD 4573 ylark St. Coolum Beach 4573
p 07 5446 5533 f 07 5446 2742 www.stonehengeconsulting.com.au
Page 3
Application Details - IDAS form I
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete this form (Application details - IDAS form 1)
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)
Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.
Name/s (individual or company name in full) t(Z oCK
For companies, contact name A N o r es f>o c K A-ec t4 i r c-- (ZE
Postal address eo 't?::. oX 21 z2_ t\)OO l4 h'kpS
Contact phone number c S Ssd1
Mobile number (non-mandatory) 0(12 W- (g6
Fax number (non-mandatory)
e-mail address (non-mandatory) dcarck P oe vS-le` t , Cote) , et tA-
1. What is the nature of development proposed? (tick all applicable boxes)
q material change of use of premises
q building work
operational work
Develop
Ment Counter
reconfiguring a lot
2 5 OCT 2011
Tewantin
^nf fMrastructure and Planning ()Plan Queensland
:^ Government
..^.,
Page 4
qoq
2. What type of approval is being sought?
q development permit
preliminary approval
q both - provide details below
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
No
q Yes - complete table A and then go to question 5
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
Lot on plan
Street Address
description
o al government area
Unit Street Street name and o fficial I Post Plan type (e.g. Logan,Cairns)
Lot No.
No. No. subu rb/locality n ame code and plan no.
1 9 ^ rc-^'" %e -, J y SV1 eeftID5 Sc P- (-
q Street address / lot on plan WQOSA qlbs
Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
q water e.g. jetty, pontoon)
Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)
Coordinates (note: place each set of
coordinates in a separate row) Zone Local government
Datum
reference area (If applicable)
Easting Northing Latitude Longitude
q GDA94
q WGS84
1
q other
5. Total area of the premises on which the development is proposed (indicate hectares or m')
6. Current usels of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)
1
7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)
Application Det:) , IDAS form 1
Version 1 0 18 December 2009
Page 5
qqq
8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)
No
q Yes - complete either table D, table E or table F as applicable
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)
q Yes - complete table G
10. Identify if any of the following apply to the premises (tick applicable box/es)
adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
on strategic port land under the Transport Infrastructure Act 1994 - complete table I
in a tidal water area - complete table J
11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)
q No 'Yes - ensure the type, location and dimension of each easement is included in the plans submitted
12. Does the proposal include new building work or operational work on the premises? (including any
services)
q No 'Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted
13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
end of this form for more information)
[] No - Go to question 15 Yes
15. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?
q No
q Yes - provide details below
16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)
Method of lodgement to
Description of attachment or title of attachment
assessment manager
17. Applicant's declaration
q By making this application, I declare that all information in this application is true and correct (note: it is
unlawful to provide false or misleading information).
Application Details - IDAS form I
Version 1.0 18 December 2009
Page 6
Notes for completing this form
Question 8:
• Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.
• Owner's consent is not required for a mobile and temporary ERA.
Question 9:
• Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.
Question 13:
• The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
long service leave levy is payable.
• The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 14:
• The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.
• Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www.gleave. Id.gov. au. For further information contact QLeave on 1800 803 481 or www.qleave.qtd.gov.au.
Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.
OFFICE USE ONLY
Date received Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
Council. I have been engaged as the private certifier for the
To: building work referred to in this application.
Date of BSA Certification Building
Name
engagement license number classification/s
App-:-, r -- Detarc - IDAS form 1
Version 1.0 18 December 2009
Page 7
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
QLeave Project Amount form sighted by Name of officer who
Description of the work Date paid
Number paid ($) assessment sighted the form
manager
1
The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.
Appl'.,r De's :s - IDAS form ;
Version 1.0 18 Dece,rber 2009
Page 8
Integrated Development Assessment System form
Building or operational work assessable
against a planning scheme - IDAS form 6
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against
a planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete Applicant details - IDAS form 1
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
AJI terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.
1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)
J°1 building work - complete table A q operational work - complete table B
2. What is the dollar value of the proposed building work? (inc GST, materials and labour)
$ l op I C-.X; PC>
Department of Infrastructure and Planning QPlan Queensland
^% Government
Page 9
3. Confirm the following mandatory supporting information accompanies this application
Confirmation
Method of lodgement
of lodgement
All applications for operational works
site plans drawn to scale which show the following:
• the location and site area of the land to which the application relates
(relevant land)
• the north point
• the boundaries of the relevant land
• the allotment layout showing existing lots, any proposed lots (including
the dimensions of those lots), existing or proposed road reserves, U confirmed
building envelopes and existing or proposed open space (note:
numbering is required for all lots)
• any existing or proposed easements on the relevant land and their
function
• any access limitation strips
• all existing and proposed roads and access points on the relevant land
a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents 'confirmed
relevant to the application
Applications for operational works involving earthworks (filling and excavating)
drawings showing:
• existing and proposed contours
• areas to be cut and filled
• the location and level of any permanent survey marks or reference
stations used as datum for the works q confirmed
• the location of any proposed retaining walls on the relevant land and
their height
• the defined flood level (if applicable)
• the defined fill level (if applicable)
Applications for operational works involving roadworks
drawings showing:
• existing and proposed contours
• the centreline or construction line showing chainages, bearings, offsets
if the construction line is not the centreline of the road and all
intersection points
• information for each curve including tangent point chainages and
offsets, curve radii, arc length, tangent length, superelevation (if
applicable) and curve widening (if applicable)
• kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
• edge of pavement where kerb is not constructed q confirmed
• position and extent of channelisation
• location and details of all traffic signs, guideposts, guardrail and other
street furniture
• pavement markings including details on raised pavement markers
• catchpit, manhole and pipeline locations
• drainage details (if applicable)
• cross road drainage culverts (if applicable)
• concrete footpaths and cycle paths
• location and details for access points, ramps and invert crossings
• changes in surfacing material
Budding and operational work assessable against a planning scheme - IDAS form 6
Version 1, 0 18 December 2009
Page 10
qP
Confirmation
Method of lodgement
of lodgement
Applications for operational works involving stormwater drainage
drawings showing:
• existing and proposed contours
• drainage locations, diameters and class of pipe, open drains and
easements confirmed
• manhole location, chainage and offset or co-ordinates and inlet and
outlet invert levels
• inlet pit locations, chainage and offset or co-ordinates and invert and
kerb levels
Applications for operational works involving water reticulation
drawings showing:
• kerb lines or edge of pavement where kerb is not constructed
• location and levels of other utility services where affected by water
reticulation works
• pipe diameter, type of pipe and pipe alignment
• water main alignments
q confirmed
• water supply pump station details (if applicable)
• minor reservoir details (if applicable)
• conduits
• location of valves and fire hydrants
• location of house connections (if applicable)
• location of bench marks and reference pegs
Applications for operational works involving sewerage reticulation
drawings showing:
• location of all existing and proposed services
• location of all existing and proposed sewer lines and manhole locations
• location of all house connection branches
• kerb lines or edge of pavement where kerb is not constructed
• chainages confirmed
• design sewer invert levels
• design top of manhole levels
• type of manhole and manhole cover
• pipe diameter, type of pipe and pipe alignment
• location of house connections (if applicable)
• sewer pump station details (if applicable)
Applications for operational works involving street lighting
drawings showing:
• location of all light poles and service conduits
• location of all other cross road conduits
• type of wattage and lighting
• any traffic calming devices q confirmed
• additional plans for roundabouts and major roads (if applicable)
• details of any variations to normal alignment
• details of lighting levels
Build,ng and operational work assessable against a planning scheme - IDAS form 6
Version 10 18 December 2009
Page 11
qL
Confirmation
Method of lodgement
of lodgement
Applications for operational works involving public utility services
drawings showing:
• any existing light poles and power poles
• any existing underground services confirmed
• details of proposed services
• alternation to existing services
Applications for operational works involving landscaping works
drawings showing:
• the location of proposed plant species
• a plant schedule indicating common and botanical names, pot sizes
and numbers of plants
• planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and []confirmed
garden edge
• the location and type of any existing trees to be retained
• construction details of planter boxes, retaining walls and fences
• the proposed maintenance period
• irrigation system details
Notes for completing this form:
• This form can also be used for development applications for building works or operational works assessable
against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
mentioned, take it to mean the land use plan for the airport land.
Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form.
OFFICE USE ONLY
Date Received Reference Numbers
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.
Bw!d;ng and operatroral work assessable against a manning scheme - IDAS form 6
Version 10 18 December 2009
Used in these records
PBA11/0077 Development Application - part 2 - IDAS Forms & Covering letterRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.