Skip to the record
The only place to find full transcripts.

Council archive · source document

PBA11/0077 Development Application - part 2 - IDAS Forms & Covering letter

of 11

Text shows just the words. Original shows the document exactly as it was published.

qP
                                                                                 Confirmation
                                                                                                   Method of lodgement
                                                                                 of lodgement
Applications for operational works involving stormwater drainage

drawings showing:
•   existing and proposed contours
•   drainage locations, diameters and class of pipe, open drains and
    easements                                                                        confirmed
• manhole location, chainage and offset or co-ordinates and inlet and
    outlet invert levels
• inlet pit locations, chainage and offset or co-ordinates and invert and
    kerb levels
Applications for operational works involving water reticulation


drawings showing:
•   kerb lines or edge of pavement where kerb is not constructed
• location and levels of other utility services where affected by water
    reticulation works
•   pipe diameter, type of pipe and pipe alignment
•   water main alignments
                                                                                 q confirmed
•   water supply pump station details (if applicable)
•   minor reservoir details (if applicable)
•   conduits
•   location of valves and fire hydrants
• location of house connections (if applicable)
• location of bench marks and reference pegs
Applications for operational works involving sewerage reticulation


drawings showing:
• location of all existing and proposed services
• location of all existing and proposed sewer lines and manhole locations
• location of all house connection branches
• kerb lines or edge of pavement where kerb is not constructed
• chainages                                                                         confirmed
• design sewer invert levels
• design top of manhole levels
• type of manhole and manhole cover
• pipe diameter, type of pipe and pipe alignment
• location of house connections (if applicable)
• sewer pump station details (if applicable)

Applications for operational works involving street lighting

drawings showing:
• location of all light poles and service conduits
• location of all other cross road conduits
•   type of wattage and lighting
•   any traffic calming devices                                                  q confirmed

•   additional plans for roundabouts and major roads (if applicable)
•   details of any variations to normal alignment
•   details of lighting levels




                                              Build,ng and operational work assessable against a planning scheme - IDAS form 6
                                                                                                  Version 10 18 December 2009

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

PBA11_0077 Development Application - part 2 - IDAS Forms & Covering letter.pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.