OPW15/0044 Concurrence Agency Response dated 5 June 2015
Queensland Government Department of Infrastructure, Local Government and Planning SARA reference: SDA-0415-019832 Council reference: MLEWIS:OPW15/0044 5 June 2015 Mark Lewis Coordinator - Engineering Noosa Council PO Box 141 TEWANTIN QLD 4565 Dear Mark Lewis Concurrence agency response—with conditions Sporting Field, 35 Mary River Road & Garnet Street, Cooroy QLD (Lots 45 USL31429, 204 MCH976 & 157 MCH4833) (Given under section 285 of the Sustainable Planning Act 2009) The referral agency material for the development application described below was received by the Department of Infrastructure, Local Government and Planning under section 272 of the Sustainable Planning Act 2009 on 14 April 2015. Applicant details Applicant name: WM Projects Pty Ltd C/- KHA Development Managers Applicant contact details: PO Box 6380 MAROOCHYDORE BC QLD 4558 [email protected] Site details Street address: 35 Mary River Road & Garnet Street, Cooroy QLD Lot on plan: Lots 45 USL31429, 204 MCH976 & 157 MCH4833 Local government area: Noosa Shire Page’ SEQ North Region Level 8, Mike Ahern Building 12 First Avenue PO Box 1129 Maroochydore QLD 4558
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 7 pages
Page 2
SDA-0415-019832 Application details Proposed development: Development Permit for Operational Work (Roadworks, Stormwater Drainage, Landscaping, Clearing Vegetation & Waterway Barrier Works) Aspects of development and type of approval being sought Development Permit for Operational Work Referral triggers The development application was referred to the department under the following provisions of the Sustainable Planning Regulation 2009: Referral trigger Schedule 7, Table 2, ltem 29 — Constructing or raising waterway barrier works Conditions Under section 287(1)(a) of the Sustainable Planning Act 2009, the conditions set out in Attachment 1 must be attached to any development approval. C) Reasons for decision to impose conditions Under section 289(1) of the Sustainable Planning Act 2009, the department must set out the reasons for the decision to impose conditions. These reasons are set out in Attachment 2. Approved plans and specifications The department requires that the following plans and specifications set out below and in Attachment 3 must be attached to any development approval. Drawing/Report Title Prepared by Date Reference no. Version/Issue Aspect of developme! nt: Operational work GREENWOOD GROVE, COOROY - EXTERNAL WORKS — GARNET STREET EAST — ROAD LONGITUDINAL SECTION. SMEC AUSTRALIA PTY LTD 1710212015 3340006E- EW-102 GREENWOOD GROVE, COOROY — EXTERNAL WORKS — GARNET STREET EAST — STORMWATER DRAINAGE CULVERT DETAILS. SMEC AUSTRALIA PTY LTD 17/02/2015 3340006E- EW-105 GREENWOOD GROVE, COOROY — EXTERNAL WORKS — GARNET STREET EAST — SMEC AUSTRALIA PTY LTD STORMWATER 17/02/2015 3340006E- EW-106 Department of Infrastructure, Local Government and Planning Page 2
Page 3
SDA-0415-019832 DRAINAGE CULVERT SECTIONS GREENWOOD GROVE, COOROY — EXTERNAL WORKS — GARNET STREET EAST — GABION & FISH PASSAGE DETAILS SMEC AUSTRALIA PTY LTD 17/03/2015 3340006E- EW-111 Garnet St. Drainage Culvert Rehabilitation Plan (Sheet 1} Saunders Havill Group 19/03/2015 5833L 1 Garnet St. Drainage Culvert Rehabilitation Plan (Sheet 2) Saunders Havill Group 19/03/2015 5833 L 2 A copy of this response has been sent to the applicant for their information. For further information, please contact Tom Kasauskas, Planning Officer, SARA SEQ North on 5352 9717, or email [email protected] who will be pleased to assist. Yours sincerely er Garth Nolan Manager (Planning) ce: WM Projects Pty Ltd C/- KHA Development Managers, [email protected] enc: Attachment 1—Conditions to be imposed Attachment 2—Reasons for decision to impose conditions Attachment 3—Approved Plans and Specifications Department of Infrastructure, Local Government and Planning Page 3
Page 4
SDA-0415-019832 SARA reference: SDA-0415-019832 Council reference: MLEWIS:OPW15/0044 Attachment 1—Conditions to be imposed No. Conditions Condition timing Operational works 7.2.29 Constructing or raising waterway barrier works - Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive administering the Act nominates the Director- General of the Department of Agriculture and Fisheries to be the assessing authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following conditions: 1. The development must be carried out generally in accordance with the following plans: At all times O GREENWOOD GROVE, COOROY — EXTERNAL WORKS — GARNET STREET EAST — ROAD LONGITUDINAL SECTION, prepared by SMEC AUSTRALIA PTY LTD, 17/02/2015, ref. 3340006E-EW- 102, rev. D OQ GREENWOOD GROVE, COOROY - EXTERNAL WORKS — GARNET STREET EAST - STORMWATER DRAINAGE CULVERT DETAILS, prepared by SMEC AUSTRALIA PTY LTD, 17/02/2015, ref. 3340006E-EW- 105, rev. D O GREENWOOD GROVE, COOROY — EXTERNAL WORKS — GARNET STREET EAST —- STORMWATER DRAINAGE CULVERT SECTIONS, prepared by SMEC AUSTRALIA PTY LTD, 17/02/2015, ref. 3340006E-EW- 106, rev. D O GREENWOOD GROVE, COOROY — EXTERNAL WORKS — GARNET STREET EAST — GABION & FISH PASSAGE DETAILS, prepared by SMEC AUSTRALIA PTY LTD, 17/03/2015, ref. 3340006E-EW-111, rev. E O Garnet St. Drainage Culvert Rehabilitation Plan (Sheet 1), prepared by Saunders Havill Group, 19/03/2015, ref. 5833 L1, rev.B ' O Garnet St. Drainage Culvert Rehabilitation Plan (Sheet 2), prepared by Saunders Havill Group, 19/03/2015, ref. 5833 L 2, rev. B Development authorised under this approval is limited as follows: 0 the operational works to raise or construct a waterway barrier works that is a culvert structure within Cooroy Creek between chainage 640 and 680 and shown in plan titled Greenwood Grove, Cooroy — External works — Garnet Street East —- Stormwater Drainage Culvert Details, SMEC Australia Pty Ltd, Dated 17/02/2015, At all times Department of Infrastructure, Local Government and Planning Page 4
Page 5
SDA-0415-019832 No. Conditions Condition timing Reference 3340006E-EW-105, Version D. Provide written notice to [email protected], when the At least five (5) development authorised under this approval has started, and business days but when it has been completed. no greater than twenty (20) These notices must state this permit number, the location and business days prior the condition number under which the notice is being given. to the commencement of The notice advising of the completion date must also include a fisheries report documenting the completed development works, including development works but not limited to: 0 photographs taken before, during and after the And then, as to the development works at specific photo-monitoring sites. notice advising of the QO an evaluation of the actual impacts of the development completion date, within 15 business on fish passage. days of the completion of the fisheries development works 4. Until the works have been completed, permit access to the place | For the duration of where the works are located by Department of Agriculture and the works the subject Fisheries officers if requested. of this approval Up and downsti fish tb ided th p and downstream fish passage must be provided across the . waterway barrier. At all times 6. The fish passage provided must cater for the whole fish At all times community taking into account species, size classes, life stages and swimming abilities as well as the seasonal and flow related biomass of the fish community. 7. . . : : : The waterway barrier and any associated infrastructure including, At all times but not limited to intakes, walls, access structures, pipe works, - spillways and dissipation devices are to be designed, constructed and maintained to avoid fish injury, mortality and/or entrapment. 8. (a) A monitoring program must be developed and implemented by a person or entity that is suitably qualified and experienced in fish passage biology, fish passage design and construction, to demonstrate the performance of the waterway barrier works in providing adequate fish passage. (b) The monitoring program must: a) Prior to the completion of the works b) At all times Department of Infrastructure, Local Government and Planning Page 5
Page 6
SDA-0415-019832 No. Conditions Condition timing 0 involve the provision of monitoring reports to [email protected] at intervals of 6 months for a period of 24 months after completion of works; O include an alert and action component, which will enable changes to be made to any deficiencies in the performance of the waterway barrier works promptly and no later than prior to the commencement of the following wet season. The emails attaching the monitoring reports must state this permit number, the location and name of work and the condition number under which the report is being given. The effective operation of the fish passage aspects of the structure must be maintained for the life of the barrier. This maintenance must include regular, documented inspections of the structures (fish way, baffles, roughening etc) especially after flood events, and prompt clearing of debris or rectifying any other failures, malfunctions, breakdowns or other impediments to fish movement. At all times 10. In-stream works are to be completed as quickly as possible and are avoided during times of elevated flows and spawning/migration times of native fish species reasonably expected to require fish passage at the location of the development. At all times 11. The construction, or raising, of the waterway barrier is to be performed in such a manner as to avoid or minimise direct or indirect disturbance to the bed and banks adjacent to the approved footprint of the works as shown on Greenwood Grove, Cooroy — External works — Garnet Street East — Stormwater Drainage Culvert Details, SMEC Australia Pty Ltd, Dated 17/02/2015, Reference 3340006E-EW-105, Version D. 4 At all times Department of Infrastructure, Local Government and Planning Page 6
Page 7
SDA-0415-019832 SARA reference: SDA-0415-019832 Council reference: MLEWIS:OPW15/0044 Attachment 2—Reasons for decision to impose conditions The reasons for this decision are: To ensure the development is carried out generally in accordance with the plans of development submitted with the application. To ensure the development is carried out in the location and to the extent specified on the approved plans of development. To facilitate the monitoring of the development works for compliance purposes. To ensure the design of the fish way provides for adequate fish movement. To ensure the design of the fish way adequately caters for the whole fish community taking into account species and biomass variations. To ensure the development does not increase the risk of mortality, disease or injury, or compromise the health and productivity in fish. To ensure the fish way remains operational and a feasible and reliable solution providing adequate fish passage for as long as the waterway barrier is in position. To ensure the construction of waterway barrier works does not limit the movement or wellbeing of fish. To ensure the development does not cause, or minimises direct or indirect disturbance to the bed and banks adjacent to the approved footprint of works. Department of Infrastructure, Local Government and Planning Page 7
Page 8
SDA-0415-019832 SARA reference: SDA-0415-019832 Council reference: MLEWIS:OPW15/0044 Attachment 3—Approved plans and specifications Department of Infrastructure, Local Government and Planning Page 8