Original source · versioned page text
OPW15/0044 Concurrence Agency Response dated 5 June 2015
SDA-0415-019832 No. Conditions Condition timing Reference 3340006E-EW-105, Version D. Provide written notice to [email protected], when the At least five (5) development authorised under this approval has started, and business days but when it has been completed. no greater than twenty (20) These notices must state this permit number, the location and business days prior the condition number under which the notice is being given. to the commencement of The notice advising of the completion date must also include a fisheries report documenting the completed development works, including development works but not limited to: 0 photographs taken before, during and after the And then, as to the development works at specific photo-monitoring sites. notice advising of the QO an evaluation of the actual impacts of the development completion date, within 15 business on fish passage. days of the completion of the fisheries development works 4. Until the works have been completed, permit access to the place | For the duration of where the works are located by Department of Agriculture and the works the subject Fisheries officers if requested. of this approval Up and downsti fish tb ided th p and downstream fish passage must be provided across the . waterway barrier. At all times 6. The fish passage provided must cater for the whole fish At all times community taking into account species, size classes, life stages and swimming abilities as well as the seasonal and flow related biomass of the fish community. 7. . . : : : The waterway barrier and any associated infrastructure including, At all times but not limited to intakes, walls, access structures, pipe works, - spillways and dissipation devices are to be designed, constructed and maintained to avoid fish injury, mortality and/or entrapment. 8. (a) A monitoring program must be developed and implemented by a person or entity that is suitably qualified and experienced in fish passage biology, fish passage design and construction, to demonstrate the performance of the waterway barrier works in providing adequate fish passage. (b) The monitoring program must: a) Prior to the completion of the works b) At all times Department of Infrastructure, Local Government and Planning Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.