Log in to see the plans as drawn5.2 PIPED DRAINAGE SYSTEM – POST DEVELOPMENT
Post development areas adopted are as follows:
Total Catchment as before of 3105m2
It is proposed to use retention basins totaling 30m2 with an orifice overflow outlet for the
development. The design of the piped infrastructure and detention system was undertaken
using Drains program has been used with Extended Rational Method.
Drains Output:
EY ARI Post Development Flows m3/s
1 1 0.035
0.5 5 0.044
.11 10 0.054
.05 20 0.058
2 50 0.064
1 100 0.068
Table 3 - Site Post-Development
Comparing the results pre and post development:
EY ARI Pre Development Flows m3/s Post Development Flows m3/s
1 1 0.037 0.035
0.5 5 0.067 0.044
.11 10 0.083 0.054
.05 20 0.098 0.058
2 50 0.124 0.064
1 100 0.142 0.068
Table 4 - Pre & Post Development Comparison
Flows discharging from the site will be adequately mitigated.
NMA-SBSWMR-20004 Noosa Youngcare 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.