Skip to the record
Accept no imitations.

Original source · versioned page text

Site Based Stormwater Management Plan

of 25

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
5.2 PIPED DRAINAGE SYSTEM – POST DEVELOPMENT

Post development areas adopted are as follows:

Total Catchment as before of 3105m2

It is proposed to use retention basins totaling 30m2 with an orifice overflow outlet for the
development. The design of the piped infrastructure and detention system was undertaken
using Drains program has been used with Extended Rational Method.

Drains Output:
                         EY        ARI        Post Development Flows m3/s
                          1         1                    0.035
                        0.5         5                    0.044
                        .11        10                    0.054
                        .05        20                    0.058
                          2        50                    0.064
                          1        100                   0.068
                                      Table 3 - Site Post-Development


Comparing the results pre and post development:
       EY      ARI     Pre Development Flows m3/s                  Post Development Flows m3/s
        1       1                  0.037                                      0.035
      0.5       5                  0.067                                      0.044
      .11       10                 0.083                                      0.054
      .05       20                 0.098                                      0.058
        2       50                 0.124                                      0.064
        1      100                 0.142                                      0.068
                                Table 4 - Pre & Post Development Comparison


Flows discharging from the site will be adequately mitigated.




NMA-SBSWMR-20004 Noosa Youngcare                                                                 9
Log in to download the original file

Site Based Stormwater Management Plan.pdf · 2.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.