Log in to see the plans as drawn6.2 STORMWATER QUALITY MODELLING
The modelling for the subject catchment with and without the proposed treatment system has
been carried out using Model for Urban Stormwater Conceptualisation (MUSIC) software.
The catchment was modelled in music in accordance with the following guidelines &
parameters:
• Music Verions 6.3
• “MUSIC Modeling & Guidelines Version 1.0 – 2010”, Water by Design (2010)
• Rainfall Station 40063 Dayboro Post Office, 6 minute time step from 1980 to 1989
• Water by Design MUSIC Modeling Guidelines.
• No drainage routing between nodes.
6.3 TREATMENT SYSTEMS REQUIRED
A schematic plan of the stormwater treatment train form MUSIC is show below.
SPEL drawing number SP20-SF14610-P found in Appendix C gives full details
Figure 2 - SW Treatment Train
NMA-SBSWMR-20004 Noosa Youngcare 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.