Original source · versioned page text
Site Based Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnThe specific stormwater quality management objectives are met when comparing the mitigated
and unmitigated post-development site.
Developed Developed Load Reduction Required Load
Pollutant Type
Unmitigated Mitigated (%) Reduction (%)
TSS (kg/year) 820 82.5 89.9 80
TP (kg/year) 1.73 0.687 60.4 60
TN(kg/year) 12.4 4.62 62.8 45
Gross Pollutants
98.8 0 100 90
(kg/year)
All relevant stormwater requirements have been addressed and support the development
application of the site.
NMA-SBSWMR-20004 Noosa Youngcare 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.