MINUTES
Ordinary Meeting
Thursday, 19 November 2020
5pm
Council Chambers, 9 Pelican Street, Tewantin
Crs Clare Stewart (Chair), Karen Finzel, Joe Jurisevic, Amelia Lorentson,
Brian Stockwell, Tom Wegener, Frank Wilkie
“Noosa Shire – different by nature”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 27 sections
Section 2
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
1 ATTENDANCE & APOLOGIES
COUNCILLORS
Councillor C Stewart, Mayor
Councillor K Finzel
Councillor J Jurisevic
Councillor A Lorentson
Councillor B Stockwell
Councillor T Wegener
Councillor F Wilkie
EXECUTIVE
B de Chastel, Chief Executive Officer
K Contini, Director Community Services
M Shave, Director Corporate Services
A Dow, Acting Director Environment & Sustainable Development
D Iezzi, Director Executive Services
C Billingham, Director Infrastructure Services
APOLOGIES
Nil.
The meeting commenced at 5.00pm.
2 CONFIRMATION OF MINUTES
Council Resolution
Moved: Cr Wilkie
Seconded: Cr Finzel
The Minutes of the Ordinary Meeting held on 15 October 2020 be received and confirmed.
Carried unanimously.
3 MAYORAL MINUTES
Nil.
4 PETITIONS
1 PETITION: REQUEST FOR COUNCIL TO CANCEL THE SATANIC BLACK MASS
SCHEDULED FOR 30 OCTOBER 2020 AT THE J
Refer to Attachment 1
Council Resolution
Moved: Cr Stewart
Seconded: Cr Lorentson
That the petition signed by 2,411 people tabled by Cr Stewart requesting that Council
cancel the Satanic Black Mass scheduled for 30 October 2020 be received and referred
to the Chief Executive Officer to determine appropriate action.
Carried unanimously.
Page 2 of 28
Section 3
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
2 PETITION: REQUEST FOR CONSTRUCTION OF ACCESS ROAD BETWEEN
BUSHLANDS DRIVE AND GATEWAY DRIVE, NOOSAVILLE
Refer to Attachment 2
Council Resolution
Moved: Cr Finzel
Seconded: Cr Wilkie
That the petition signed by 193 people tabled by Cr Finzel requesting that Council
construct a road link from Bushlands Drive to Gateway Drive, Noosaville be received and
referred to the Chief Executive Officer to determine appropriate action.
Carried unanimously.
3 PETITION: REQUEST FOR COUNCIL TO RETAIN THE TREEHOUSE BUILT IN
LOWRY PARK, PEREGIAN BEACH
Refer to Attachment 3
Council Resolution
Moved: Cr Wilkie
Seconded: Cr Stockwell
That the petition signed by 58 people tabled by Cr Wilkie requesting that Council retain
the treehouse constructed in Lowry Park at the intersection of Paldao Rise and Juniper
Court, Peregian Beach be received and referred to the Chief Executive Officer to
determine appropriate action.
Carried unanimously.
5 NOTIFIED MOTIONS
Nil.
6 PRESENTATIONS
Nil.
7 DEPUTATIONS
Nil.
Page 3 of 28
Section 4
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
8 CONSIDERATION OF COMMITTEE REPORTS
1 AUDIT & RISK COMMITTEE MEETING REPORT – 23 OCTOBER 2020
The following Recommendations from the Audit & Risk Committee were adopted
without discussion or further amendment.
Council Resolution
Moved: Cr Stockwell
Seconded: Cr Jurisevic
That the report of the Audit & Risk Committee dated 23 October 2020 be received and the
recommendations therein be adopted, and further, that Council pass on their appreciation to Scott
Williams for his service to the Audit & Risk Committee over the past 6 years.
Carried unanimously.
1 QUEENSLAND AUDIT OFFICE 2020 CLOSING REPORT
That Council note the 2020 Audit Closing Report provided by the Queensland Audit Office
(QAO) to the Audit & Risk Committee meeting dated 23 October 2020.
2 2019-20 ANNUAL FINANCIAL STATEMENTS
That Council note the report by the Manager Financial Services to the Audit & Risk Committee
dated 23 October 2020 and approve the 2019/20 Annual Financial Statements for signature
by the Mayor and Chief Executive Officer.
3 NOOSA COUNCIL ANNUAL REPORT 2019-20
That Council note the report by the Governance Advisor to the Audit & Risk Committee Meeting
dated 23 October 2020 and the draft Annual Report for the 2019-20 financial year.
4 INTERNAL AUDIT & RISK MANAGEMENT
That Council note the report by the Governance Advisor to the Audit & Risk Committee Meeting
dated 23 October 2020 addressing Internal Audit and Risk Management matters.
5 GOVERNANCE UPDATE
That Council note the report by the Governance Advisor to the Audit & Risk Committee Meeting
dated 23 October 2020 providing an update on governance matters.
Page 4 of 28
Section 5
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
2 PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT – 10 NOVEMBER 2020
4 PLANNING APPLICATIONS DECIDED BY DELEGATED AUTHORITY FOR SEPTEMBER
2020
In accordance with Chapter 5B of the Local Government Act 2009, Cr Wegener provided the following
declaration to the meeting of a declarable conflict of interest in this matter:
I, Cr Wegener inform the meeting that I have a declarable conflict of interest in this matter in relation to
the application by Sunshine Butterflies as on 23 October 2020 I provided them with a donation of
surfboard making equipment valued at approximately $1200. Although I have a declarable conflict of
interest, I do not believe a reasonable person could have a perception of bias because I do not have
any other association with that organisation and the decision that Council is being asked to make in
regard to this application is not to approve or reject it, it is to only note the decision that has already
been made by Council staff. Therefore, I will choose to remain in the meeting room. However, I will
respect the decision of the meeting on whether I can remain and participate in the decision.
In accordance with Chapter 5B of the Local Government Act 2009, Cr Lorentson provided the following
declaration to the meeting of a declarable conflict of interest in this matter:
I, Cr Lorentson, inform the meeting that I have a declarable conflict of interest in this matter in relation
to the applications by Teatree Property Pty Ltd and Belmondos Pty Ltd. I have a personal relationship
with the Director of Teatree Property Pty Ltd, Mark Bain and the Bain family. The Bain family are friends
of mine and we have attended social events together, our children attended school together and they
surf together as part of the Noosa Boardrider's Club. During the 2020 election campaign, Mr Bain
appeared in one of my campaign videos and agreed to one of my election signs being placed at the
Petrol Station located on Gympie Terrace of which Mr Bain was the property landlord. In relation to the
application by Belmondos Pty Ltd, during the 2020 election campaign, Ryan Taylor, whose family own
Belmondos Pty Ltd, agreed to my election material being displayed at their business, Cafe Le Monde.
Although Mr Taylor is not a personal friend of mine, I know him through our involvement with the Noosa
Boardrider's Club. As a result of my conflict of interest I will now leave the meeting room while the matter
is considered and voted on.
Council Resolution
Moved: Cr Stewart
Seconded: Cr Wilkie
That Council note the declarable conflict of interest by Cr Wegener and determine that it is in the public
interest that Cr Wegener participates and votes on this matter because Council believes that Cr
Wegener does not have a close association with Sunshine Butterflies and given Council is not required
to approve or reject the application, only note it, a reasonable person would trust that the final decision
is made in the public interest.
Carried unanimously.
(Cr Wegener did not vote on the above motion)
Council Resolution
Moved: Cr Wilkie
Seconded: Cr Stockwell
That Council note the report by the Manager Development Assessment to the Planning &
Environment Committee Meeting dated 10 November 2020 regarding planning applications
decided by delegated authority for September 2020.
Carried unanimously.
Cr Lorentson re-joined the meeting.
Page 5 of 28
Section 6
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
The following Recommendations from the Planning & Environment Committee were
adopted without discussion or further amendment.
Council Resolution
Moved: Cr Stockwell
Seconded: Cr Wegener
That the report of the Planning & Environment Committee dated 10 November 2020 be received and
the recommendations therein be adopted except where dealt with by separate resolution.
Carried unanimously.
1 OPW18/0150.01 REQUEST TO CHANGE AN EXISTING APPROVAL FOR PRESCRIBED
TIDAL WORKS - JETTY AT 21 WESLEY COURT, NOOSA HEADS
That Council note the report by the Coordinator Engineering to the Planning & Environment
Committee Meeting dated 10 November 2020 regarding Application No. OPW18/0150.01,
request an Other Change to a Development Permit for Prescribed Tidal Works – Jetty situated
at 21 Wesley Court, Noosa Heads, and:
A. Approve the change and agree to change Condition 1 as follows:
Plan No. Rev. Plan/Document Name Date
S01 C2 Drawing Schedule & Transmittal prepared by Long View 12 June 2020
Consulting Engineers
S02 C2 Structural Notes Sheet prepared by Long View 12 June 2020
Consulting Engineers
S03 C2 Site Plan, Framing Plan, Elevations prepared by Long 12 June 2020
View Consulting Engineers
S04 C2 Jetty Framing Details prepared by Long View Consulting 12 June 2020
Engineers
B Approve the change and agree to change Condition 6 as follows:
No additional boatlifting devices are to be attached or moored at the jetty structure for
the purpose of elevating a vessel above the water without Council approval.
C. Find the following matters relevant to the assessment and sufficient reason to approve
the application:
1. The floating decks comply with the Overall Outcomes of the Watercourses Works
Code as the structures do not detrimentally impact upon the visual amenity of the
area or impact upon navigational access in the canal;
2. The jet ski boat lifting device is located within the jetty structure, is located directly
in front of the subject property and does not detrimentally impact upon the visual
amenity in the area or impact upon navigational access in the canal;
D. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Page 6 of 28
Section 7
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
2 132008.1128.04 REQUEST TO CHANGE AN EXISTING APPROVAL FOR MULTIPLE
HOUSING - TYPE 3 RETIREMENT & SPECIAL NEEDS; COMMERCIAL BUSINESS - TYPE
2 MEDICAL AND RECONFIGURING A LOT (1 INTO 2 LOTS) AT GRASSTREE COURT
AND BEN LEXCEN DRIVE, SUNRISE BEACH
That Planning & Environment Committee Agenda Item 2 be referred to the General Committee
due to the significance of the issue.
3 MCU19/0134 PLANNING & ENVIRONMENT COURT APPEAL NO. D67 OF 2020 -
REFUSAL OF AN APPLICATION FOR A BAR AT 5 TAYLOR COURT, COOROY
That Planning & Environment Committee Agenda Item 3 be referred to the General Committee
due to the significance of the issue.
5 ENVIRONMENT AND SUSTAINABLE DEVELOPMENT DEPARTMENT UPDATE - 1ST
QUARTER 2020-21
That Council note the report by the Acting Director Environment and Sustainable Development
to the Planning & Environment Committee Meeting dated 10 November 2020 providing an
update on operations of the Environment and Sustainable Development Department for the
period 1 July to 30 September 2020.
6 PLANNING & ENVIRONMENT COURT APPEAL NO. D144 OF 2019 - APPLICATION FOR
BUILDING WORKS AT 54 SEAVIEW TCE, SUNSHINE BEACH
That Planning & Environment Committee Agenda Item 6 be referred to the General Committee
due to the significance of the issue.
Page 7 of 28
Section 8
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
3 SERVICES & ORGANISATION COMMITTEE MEETING REPORT – 10 NOVEMBER 2020
The following Recommendations from the Services & Organisation Committee were
adopted without discussion or further amendment.
Council Resolution
Moved: Cr Jurisevic
Seconded: Cr Wilkie
That the report of the Services & Organisation Committee dated 10 November 2020 be received and
the recommendations therein be adopted.
Carried unanimously.
1 REGIONAL WASTE TREATMENT FEASIBILITY STUDIES UPDATE
That Council note the report by the Manager Waste and Environmental Health to the Services
& Organisation Committee Meeting dated 10 November 2020 and agree to:
A. Write to Unitywater thanking them for administering the regional waste feasibility study;
B. Include consideration of regional advanced waste treatment opportunities in the
upcoming waste strategy being developed for Noosa Council; and
C. Continue to work with local governments and agencies in the region to explore the
feasibility of regional advanced waste treatment solutions.
2 NOOSA RIVER HOLIDAY PARK - PROPOSED INTERIM MANAGEMENT AGREEMENT
That Council note the report by the Property Advisor Commercial Property to the Services &
Organisation Committee Meeting dated 10 November 2020 and authorise the CEO to enter
into an interim management agreement for the Noosa River Holiday Park for 11 months
commencing 1 June 2021.
3 PROPOSED NEW COMMERCIAL LEASE OF COUNCIL LAND AT 4 JARRAH STREET,
COOROY
That Council note the report by the Property Advisor to the Services & Organisation Committee
Meeting dated 10 November 2020 regarding the request by Eco Cottages for extended tenure
over Council land at 4 Jarrah St Cooroy (formally described as Lot 2 RP176126) and:
A. Agree to enter a new commercial lease agreement with Eco Cottages Pty Ltd,
commencing on the expiry of Eco Cottages’ existing lease in November 2021, as
generally outlined in the report; and
B. Agree to enter into a short-term interim permit for use of the 200m2 balance area of the
site up to the November 2021 lease commencement date.
4 LOCAL GOVERNMENT GOVERNANCE REFORM
That Services & Organisation Committee Agenda Item 4 be referred to the General Committee
due to the significance of the issue.
Page 8 of 28
Section 9
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
5 CORPORATE SERVICES DEPARTMENT UPDATE - 1ST QUARTER 2020-21
That Council note the report by the Director Corporate Services to the Services & Organisation
Committee Meeting dated 10 November 2020 providing a Corporate Services Department
update for the period 1 July 2020 – 30 September 2020.
6 COMMUNITY SERVICES DEPARTMENT UPDATE - 1ST QUARTER 2020-21
That Council note the report by the Director Community Services to the Services &
Organisation Committee meeting dated 10 November 2020 providing an update on the
operations of the Community Services Department for the period 1 July 2020 to 30 September
2020.
7 INFRASTRUCTURE SERVICES DEPARTMENT UPDATE - 1ST QUARTER 2020-21
That Services & Organisation Committee Agenda Item 7 be referred to the General Committee
for further consideration.
8 EXECUTIVE SERVICES DEPARTMENT REPORT - 1ST QUARTER 2020-21
That Council note the report by the Director Executive Services to the Services & Organisation
Committee Meeting dated 10 November 2020 providing an update on operations of the
Executive Services Department for the period 1 July 2020 to 30 September 2020.
9 OPERATIONAL PLAN PROGRESS REPORT - 1ST QUARTER 2020-21
That Council note the report by the Chief Executive Officer to the Services & Organisation
Committee Meeting dated 10 November 2020 providing an update on progress with the
implementation of the Operational Plan to 30 September 2020 and details of Council’s Key
Performance Indicators.
Page 9 of 28
Section 10
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
4 GENERAL COMMITTEE MEETING REPORT – 16 NOVEMBER 2020
4 LOCAL GOVERNMENT GOVERNANCE REFORM
Council Resolution
Moved: Cr Lorentson
Seconded: Cr Wilkie
That Council note the report by the Chief Executive Officer to the Services & Organisation
Committee Meeting dated 10 November 2020 regarding local government governance reform
and:
A. Adopt the updated Councillor Code of Conduct (prescribed by the Department of Local
Government, Racing and Multicultural Affairs) dated 4 August 2020 provided at
Attachment 1 to the report and repeal the previous Councillor Code of Conduct which
was adopted by Council in December 2018 and further, agree that each Councillor will
sign a declaration to abide by the new Councillor Code of Conduct at all times;
B. Adopt the updated Standing Orders for Council Meetings provided at Attachment 2 to
the report and repeal the previous Standing Orders which were adopted by Council in
August 2019;
C. Repeal the Model Meeting Procedures adopted by Council on 20 December 2018 and
note that the new Model Meeting Procedures provided at Attachment 3 to the report have
been incorporated into Council’s Standing Orders for Council Meetings;
D. Adopt the updated Investigation Policy provided at Attachment 4 to the report and repeal
the previous Investigation Policy which was adopted by Council in December 2018;
E. Adopt the Councillor Briefing Sessions and Workshops (Non-Statutory Meetings) Policy
provided at Attachment 5 to the report; and
F. Request the CEO to provide a report to a future Council meeting outlining options to
continue to improve Council transparency with a particular focus on Councillor Briefing
Sessions and Workshops.
Carried unanimously.
The following Recommendations from the General Committee were adopted without
discussion or further amendment.
Council Resolution
Moved: Cr Wilkie
Seconded: Cr Jurisevic
That the report of the General Committee dated 16 November 2020 be received and the
recommendations therein be adopted except where dealt with by separate resolution.
Carried unanimously.
Page 10 of 28
Section 11
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
1 132008.1128.04 REQUEST TO CHANGE AN EXISTING APPROVAL FOR MULTIPLE
HOUSING - TYPE 3 RETIREMENT & SPECIAL NEEDS; COMMERCIAL BUSINESS - TYPE
2 MEDICAL AND RECONFIGURING A LOT (1 INTO 2 LOTS) AT GRASSTREE COURT
AND BEN LEXCEN DRIVE, SUNRISE BEACH
That Council note the report by the Coordinator Planning to the Planning & Environment
Committee Meeting dated 10 November 2020 regarding Application No. 132008.1128.04 to
make a minor change to an existing approval for Development Permit for Material Change of
Use for Multiple Housing – Type 3 Retirement & Special Needs; Commercial Business – Type
2 Medical and Development Permit for Reconfiguring a Lot (1 into 2 lots) situated at Grasstree
Court, Sunrise Beach and:
A. Approve the change.
B. Amend conditions 1, 5, 7, 12, 14, 23, 33, 35, 40, 41 and 81 to read as follows:
PLANNING
General
1. The development must be undertaken in accordance with this approval and must
generally comply with the approved plans of development. The approved plans are
listed in the following table unless otherwise amended by these conditions.
Plan No. Rev. Plan Name Date
7448-06 Lots 1 & 9 Cancelling Lot 1 on SP177650 15 May 2008
Prepared by Conics (Sunshine Coast) Pty
Ltd
DA_106 3 Masterplan prepared by Thomson Adsett 15 October 2020
Architects
DA_107 4 Staging Plan prepared by Thomson Adsett 15 October 2020
Architects
DA_108 3 Precincts Plan prepared by Thomson Adsett 15 October 2020
Architects
DA_109 3 Pedestrian Circulation prepared by 15 October 2020
Thomson Adsett Architects
DA_110 3 Vehicular Circulation prepared by Thomson 15 October 2020
Adsett Architects
DA_111 3 Building Setbacks prepared by Thomson 15 October 2020
Adsett Architects
DA_112 3 Landscaping Calculation prepared by 15 October 2020
Thomson Adsett Architects
DA_113 3 Site Cover Calculations prepared by 15 October 2020
Thomson Adsett Architects
DA_114 3 Masterplan/Parking Layout prepared by 15 October 2020
Thomson Adsett Architects
DA_115 Typical Site Section A prepared by Smith + November 2018
Tracey Architects
DA_116 External Finishes Schedule prepared by November 2018
Smith + Tracey Architects
DA_117 2 Area Schedules prepared by Thomson 15 October 2020
Adsett Architects
DA_118 6 Residential Aged Care – Ground Floor Plan 15 October 2020
prepared by Thomson Adsett Architects
DA_119 5 Residential Aged Care – First Floor Plan 15 October 2020
prepared by Thomson Adsett Architects
Page 11 of 28
Section 12
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
DA_120 4 Residential Aged Care – Roof Plan prepared 15 October 2020
by Thomson Adsett Architects
DA_121 3 Residential Aged Care – N and W Elevations 15 October 2020
prepared by Thomson Adsett Architects
DA_122 4 Residential Aged Care – S and E Elevations 15 October 2020
prepared by Thomson Adsett Architects
DA_123 3 Residential Aged Care – Typical Sections 15 October 2020
prepared by Thomson Adsett Architects
DA_124 Residential Aged Care – Village Site Plan November 2018
prepared by Smith + Tracey Architects
DA_125 Central Facilities & ILAs – Basement Car November 2018
Park prepared by Smith + Tracey Architects
DA_126 Central Facilities & ILAs – Ground Floor Plan November 2018
prepared by Smith + Tracey Architects
DA_127 Central Facilities & ILAs – Level 1 First Floor November 2018
Plan prepared by Smith + Tracey Architects
DA_128 Independent Living Apartment Type a1-2b November 2018
(& handed) prepared by Smith + Tracey
Architects
DA_130 Central Facilities & ILAS – S & W elevations November 2018
DA_131 Central Facilities & ILAs – E Elevation and November 2018
Typical Section prepared by Smith + Tracey
Architects
DA_132 Central Facilities & ILAs – N Elevation & November 2018
Typical Section prepared by Smith + Tracey
Architects
DA_133 Apartment Buildings – Basement Plan November 2018
prepared by Smith + Tracey Architects
DA_134 Apartment Buildings – Ground Floor Plan November 2018
prepared by Smith + Tracey Architects
DA_135 Apartment Buildings – First Floor Plan November 2018
prepared by Smith + Tracey Architects
DA_136 Apartment Type a2-2b & type a3-3b November 2018
prepared by Smith + Tracey Architects
DA_137 Apartment Buildings – E & W Elevations November 2018
prepared by Smith + Tracey Architects
DA_138 Apartment Buildings – Typical N Elevation & November 2018
Section prepared by Smith + Tracey
Architects
DA_139 Apartment Building 4 / Roof Plan prepared November 2018
by Smith + Tracey Architects
DA_1340 Apartment Building 4 / Sections prepared by November 2018
Smith + Tracey Architects
DA_141 Apartment Building 3 / Roof Plan prepared November 2018
by Smith + Tracey Architects
DA_142 Apartment Building 3 / Sections prepared by November 2018
Smith + Tracey Architects
DA_143 Apartment Building 2 / Roof Plan prepared November 2018
by Smith + Tracey Architects
DA_144 Apartment Building 2 / Sections prepared by November 2018
Smith + Tracey Architects
Page 12 of 28
Section 13
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
DA_145 Apartment Building 1 / Roof Plan prepared November 2018
by Smith + Tracey Architects
DA_146 Apartment Building 1 / Sections prepared by November 2018
Smith + Tracey Architects
DA_147 Apartment Buildings – Photo Montage from November 2018
National Park prepared by Smith + Tracey
Architects
DA_148 ILU Type C (2B-1G) prepared by Smith + November 2018
Tracey Architects
DA_149 ILU Type C (3B-2G) prepared by Smith + November 2018
Tracey Architects
DA_150 ILU Type D (3B-2G) prepared by Smith + November 2018
Tracey Architects
DA_151 ILU Type H1 (2B-1G) + K1 (3B-2G) prepared November 2018
by Smith + Tracey Architects
DA_152 ILU Type H2 (2B-1G) + H2 (3B-2G) November 2018
prepared by Smith + Tracey Architects
DA_153 Independent Living Units – Roof Plans November 2018
prepared by Smith + Tracey Architects
DA_154 Independent Living Units – Elevation Sheet November 2018
1 prepared by Smith + Tracey Architects
DA_155 Independent Living Units – Elevation Sheet November 2018
2 prepared by Smith + Tracey Architects
DA_156 Independent Living Units – Typical Sections November 2018
prepared by Smith + Tracey Architects
Nature and Extent of Approved Use
5. The approved development comprises the following:
Multiple Housing – Type 3 Retirement & Special Needs (122 independent
living units and apartments and 102 aged care beds)
Commercial Business – Type 2 Medical (as indicated on approved plans)
Staging
7. The development must be staged in accordance with the plan titled ‘Masterplan’
prepared by Thomson Adsett dated 15 October 2020, Plan Ref: DA_106 Rev. 3
with the Residential Aged Care Facility provided in the first stage.
LANDSCAPE & ECOLOGY
Flora
12. In conjunction with an application for operational works on the site for the first
stage, the applicant must submit an operational works application for Vegetation
Management for the development site. The Vegetation Management operational
works application must detail:
12.1 Identification of all active Glossy Black Cockatoo food trees within the
development footprint or in areas likely to be impacted upon by the operation
or construction of the development.
12.2 A Vegetation Clearing Offset program to be undertaken to re-establish the
habitat to be cleared from the site to a nearby location with similar soil
properties. A receiving site is to be identified and maintained for a specified
period (minimum 5 years) after the establishment of the receiving site.
Page 13 of 28
Section 14
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
12.3 The Vegetation Clearing Offset program must include the details of the
transfer methods to be engaged including:
12.3.1 The transfer of soil/seed bank media off the site to the designated
receiving site(s);
12.3.2 Methods of transfer including, inter alia, mastication of native
vegetative matter, tile transfer of live soil/plant matrix, peat locations
and extents, sexual and vegetative methods of revegetation of offset
receiving site and other deemed pertinent matters by a person with
industry experience in the successful establishment and/or re-
establishment of heathland vegetation;
12.3.3 Transfer of rare and threatened plant species (sexual and/or
vegetative);
12.3.4 Details of pre-treatment works prior to transfer of soil/seed bank
media off the site and methods of transplanting;
12.3.5 Details of seed collections times and estimated establishment
procedures and times;
12.3.6 Details of the receiving site, including tenure, contractual details,
establishment, monitoring and maintenance details and suitability of
the site for the purpose;
12.3.7 All information must be prepared by a person with industry
experience in the successful establishment and/or re-establishment
of heathland vegetation. Industry and educational institution
involvement is recommended.
The establishment of the vegetation offsets for each stage must be
completed prior to the commencement of the use for each stage. The
Vegetation Clearing Offset program, required by these conditions, must be
implemented in a staged manner reflective of the approved staging of the
development. To this end separate Vegetation Clearing Offset programs
must be developed to reflect the staged delivery of the development, in
particular the staged development of lot 6, and the subsequent development
of lot 9.
12.4 No clearing is permitted unless in accordance with the approved staged
Vegetation Clearing Offset program.
14. The Vegetation Management operational works application must detail the location
and extent and staging of vegetation disturbance on Lot 9 SP252905 and Lot 6
RP901384 must be accurately marked on-site, including any setback requirements
for bushfire mitigation purposes, for Council officers to inspect prior to
commencement of any vegetation clearing.
Bushfire
23. A bushfire evacuation plan for the site must be prepared by a qualified person and
submitted to Council prior to the issue of any Development Permit for Operational
Works.
CIVIL ENGINEERING
Frontage Works
33. Pedestrian crossings shall be provided in Grasstree Court generally as shown on
‘Masterplan’ prepared by Thomson Adsett dated 15 October 2020, Plan Ref:
DA_106 Rev. 3. The crossing shall include linemarking and suitable signage in
accordance with the MUTCD.
Page 14 of 28
Section 15
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
Vehicle Access
35. Vehicular access driveways to service the development shall be constructed from
the Grasstree Court frontages of the site. The driveways shall be generally in
accordance with Council’s standard drawing SEQ R-051 and Masterplan’ prepared
by Thomson Adsett dated 15 October 2020, Plan Ref: DA_106 Rev. 3.
40. All internal roads shall be designed and constructed in accordance with Council’s
Planning Scheme Policy 5 – Engineering Design Standards – Roads, Drainage
and Earthworks. The roads shall be:
40.1 Generally in accordance with drawing number ‘Masterplan’ prepared by
Thomson Adsett dated 15 October 2020, Plan Ref: DA_106 Rev. 3,
40.2 A minimum width of 5.5 metres, and
40.3 Suitable for Council’s refuse collection vehicle to traverse through the site
Car Parking
41. Carparking shall be provided within the sites generally as shown on drawings
numbered DA_114 “Masterplan/Carpark Layout” Rev. 3 prepared by Thomson
Adsett Architects dated 15 October 2020 and DA_133 “Apartment Buildings –
Basement” prepared by Smith and Tracey Architects dated November 2018 and
within the “Independent Living Units” as shown the approved floor plans, except as
modified herein.
Storm Water Quality
81. Any proprietary stormwater quality improvement device included to achieve the
required stormwater quality Management Objectives specified in Section 4 of the
Girraween Stormwater Management Plan, must demonstrate only be granted an
Operational Works Approval on the following provisions:
a. A suitably qualified and experienced professional must provide independent
verification that the parameters within the node for the device in MUSIC
modelling have been tested and verified as per Stormwater Australia (2018)
Stormwater Quality Improvement Device Evaluation Protocol. Version 1.2
December 2018 to achieve the predicted outcomes in the MUSIC model for
the development. For the purpose of this condition, the suitably qualified and
experienced professional must be able to demonstrate a minimum 10 years
urban stormwater testing and modelling experience and be verified in writing
by Stormwater Australia as having an appropriate reputation and track record
within the stormwater industry to provide such independent advice.
b. Where testing to achieve the certification of the proprietary stormwater
quality improvement device is from an area with rainfall intensities and
patterns that are statistically inconsistent with the region of the Noosa Shire
that the device is to be installed, and / or the size of the development the
device has been tested on is more than 2500m2 smaller than the
development the device is proposed to service, the following additional
conditions apply:
i. The proprietary stormwater device treatment train must be tested and
re-verified in accordance with the Stormwater Australia (2018)
Stormwater Quality Improvement Device Evaluation Protocol. Version
1.2 December 2018. A suitably qualified and experienced professional,
as verified by Stormwater Australia must use the results from the onsite
testing to re-run the MUSIC node for the proprietary devices and
confirm whether or not the required pollutant reduction efficiencies of
80% reduction in Total Suspended Solids, 60% reduction in Total
Phosphorous and 45% reduction in Total Nitrogen for the overall
development are delivered.
Page 15 of 28
Section 16
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
ii. Where the field results and re-run MUSIC node demonstrate the
required pollution reduction efficiencies for the development are not
met, the applicant must implement additional measures to achieve the
required pollution reduction targets. The additional measures must
include, in order of priority, elevated maintenance, and then increased
treatment capacity of the stormwater quality improvement devices.
Following application of additional measures, the system must be
retested in accordance with Stormwater Australia (2018) Stormwater
Quality Improvement Device Evaluation Protocol. Version 1.2
December 2018. Where pollution reduction targets continue to not be
demonstrated the proprietary device must be removed and replaced
with a bio-retention device constructed in accordance with an
Operational Works approval or the applicant must enter into an
agreement with Council to provide improved water quality outcomes
within the catchment area.
iii. A separate water quality performance bond must be provided prior to
the issue of an Operational Works approval for Civil Infrastructure and
Stormwater for Stage 1. The water quality performance bond must be
150% of the cost of water quality monitoring required to comply with
Stormwater Australia (2018) Stormwater Quality Improvement Device
Evaluation Protocol. Version 1.2 December 2018. The performance
bond will be incrementally returned annually for the value of monitoring
works completed that year. The full value of the bond shall be returned
upon demonstration that the development delivers the required
pollution reduction targets.
C. Delete condition 21.
D. Include the following advisory note on the development approval:
1. The developer is encouraged to liaise cooperatively with local community groups
to deliver and maintain the required glossy black food tree recovery programme.
E. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
2 MCU19/0134 PLANNING & ENVIRONMENT COURT APPEAL NO. D67 OF 2020 -
REFUSAL OF AN APPLICATION FOR A BAR AT 5 TAYLOR COURT, COOROY
That Council note the report by the Manager Development Assessment to the Planning &
Environment Committee Meeting dated 10 November 2020 and:
A. Agree to settle Planning & Environment Court Appeal No. D67 of 2020 generally in
accordance with the following conditions:
When Conditions Must Be Complied With
1. Unless otherwise stated, all works required by the conditions of this Decision
Notice must be completed prior to the use commencing, and then compliance
maintained at all times while the use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Page 16 of 28
Section 17
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
Plan No. Rev. Plan/Document Name Date
RL 18003 - Titled "Ground Furniture and Equipment Layout, 5 Dec 2019
Sheet 1 of 2 Ground Floor Areas – Proposed Industrial fitout",
drawn by Rhad Leonard
RL 18003 - Titled "Mezzanine Furniture and Equipment 5 Dec 2019
Sheet 2 of 2 Layout, Mezzanine Area – Proposed Industrial
fitout", drawn by Rhad Leonard
Nature and Extent of Approved Use
3. The Entertainment & Dining Business – Type 3 Bar must operate all times in
association with the Distillery use within Tenancies 1 and 11. If the associated
Distillery use ceases, then the Entertainment & Dining Business – Type 3 Bar must
cease.
4. The patron use area for the consumption of food, drink and alcohol and/or
congregation is limited to within the 21m² ground floor seating area identified in
green on Drawing RL18003, sheet 1 of 2, drawn by Rhad Leonard, dated 5
December 2019 with a maximum of 20 chairs.
5. The 21m² seating area is only permitted to be used by patrons who have booked
via a tour either directly through the Distillery or one of the affiliated tour companies
or have booked a time slot for a table booking, these will be limited to 2 hours.
6. The 21m² ground floor area identified in green on Drawing RL18003, sheet 1 of 2,
drawn by Rhad Leonard, dated 5 December 2019 must be clearly marked by way
of floor marking, pedestrian barriers, posts or similar.
7. The Tenancy 1 mezzanine area identified on Drawing RL18003, sheet 2 of 2, titled
"Mezzanine Furniture and Equipment Layout, Mezzanine Area – Proposed
Industrial fitout", drawn by Rhad Leonard, dated 5 December 2019 must not be
used by patrons for the consumption of food, drink and alcohol and/or
congregation.
8. Patrons are permitted to be taken on a short tour of the associated Distillery use
within Tenancies 1 and 11 (including the Tenancy 1 mezzanine area).
9. The approved use must not operate outside the hours of Friday, 3:00pm to 8:00pm
and week-ends and public holidays 12:00pm – 8:00pm.
10. The sale and/or consumption of alcoholic products is limited to those alcoholic
products produced by the associated Distillery use. Any alcoholic beverages that
are not produced as part of the Distillery use on the site must not be sold from the
site.
11. No televisions displaying sports, music videos, news or the like are permitted to
be operated. Television monitors are only permitted to display the menu board for
the Entertainment and Dining Business Type 3 Bar use.
12. Only finger type food is permitted to be sold and/or consumed.
Lighting of External Areas
13. During operating hours, all parking areas, pedestrian areas and entrances/exits
must be well lit with vandal resistant lighting and with intensities to satisfy the
requirements of Australian Standard AS1158 “Public Lighting Code”. Lighting must
be designed to reduce the contrast between shadows and well lit areas.
Page 17 of 28
Section 18
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
Noise Management
14. Noise from the Entertainment & Dining Business – Type 3 Bar, including amplified
or non-amplified noise and patron noise must not exceed:
Continuous Noise
daytime (0700 to 1800 hours): 41.9 + 0 = 42 dB(A) LA10,adj,T;
evening (1800 to 2200 hours): 46.6 + 0 = 47 dB(A) LA10,adj,T
Time Varying Noise
daytime (0700 to 1800 hours): 41.9 + 5 = 47 dB(A) LA10,adj,T;
evening (1800 to 2200 hours): 46.6 + 5 = 52 dB(A) LA10,adj,T
Courtesy Bus
15. A free-on-call courtesy bus must be available at all times during operating hours
and available for patrons within a 15 minute driving radius of the site.
16. The courtesy bus is not permitted to remain on site outside of the hours of
operation.
Staff Numbers
17. A maximum of 3 staff (including 1 dedicated courtesy bus driver) and 1 manager
for the Entertainment and Dining Business Type 3 Bar use are to be on site at any
one time.
Currency Period
18. The Currency Period for this development approval lapses if the use has not
happened by 19 November 2026, unless an application to extend the currency
period is approved by Council.
B. Include the following advisory note on the development approval:
1. The proposed bar is located in an area that is zoned Low Impact Industry under
the Noosa Plan 2020 and a range of industrial uses are planned to establish that
may generate noise, odour, dust, waste nuisance or the like. These industrial
businesses will not be required to include additional measures to address the
potential impacts from these industrial uses on the bar given that they should
reasonably be expected.
3 PLANNING & ENVIRONMENT COURT APPEAL NO. D144 OF 2019 - APPLICATION FOR
BUILDING WORKS AT 54 SEAVIEW TCE, SUNSHINE BEACH
That Council note the report by the Manager, Development Assessment to the Planning &
Environment Committee Meeting dated 10 November 2020 regarding Planning & Environment
Court Appeal No. D144 of 2019 and agree to settle the appeal generally in accordance with
the following conditions:
PLANNING
When Conditions must be Complied With
1. The applicant must provide a copy of the development approval to the private building
certifier who assesses the subsequent development application for a development
permit for building works for the construction of the Detached House and the associated
deck area and pool.
Page 18 of 28
Section 19
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
Approved Plans
2. Development must be undertaken strictly under the approved plans listed in the following
table unless otherwise amended by these conditions.
Drawing No. Revision Drawing Name Date
DD 1.1 A Title Sheet 18-12-18
DD 1.2 A Existing Overlay Site Plan 18-12-18
DD 1.3 A Proposed Site Plan 18-12-18
DD 1.4 A Reference Images 18-12-18
DD 1.5 A DA Eaves and Roof Diagram 18-12-18
DD 1.6 A DA Northern Screen Diagram 18-12-18
DD 1.7 A Lower Ground Floor Plan 18-12-18
DD 1.8 A Ground Floor Plan 18-12-18
DD 1.9 A Level 1 Floor Plan 18-12-18
DD 1.10 A Roof Plan 18-12-18
DD 2.1 A North Elevation 18-12-18
DD 2.2 A South Elevation 18-12-18
DD 2.3 A East Elevation 18-12-18
DD 2.4 A West Elevation 18-12-18
DD 2.5 A West Street Elevation 18-12-18
DD 3.1 A Section A 18-12-18
DD 3.2 A Section B 18-12-18
Approved Documents
3. Development must be undertaken strictly under the approved documents listed in the
following table unless otherwise amended by these conditions.
Document
Tectonic. (2020). “Geotechnical Investigation, 54 Seaview Terrace, Sunshine Beach”,
reference 19078-003-Rev 0, dated 17 July 2020.
Joint Expert Report of the Coastal Erosion Experts dated 9 June 2020, including Figure 8-
3 of Omtrek (2019). “Working Notes: Brett Mason v Noosa Shire Council – 54 Seaview
Terrace, Sunshine Beach”.
Joint Expert Report of the Coastal Erosion Experts dated 14 July 2020.
Performance Bond
4. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
must be submitted to the Council to secure the performance of all conditions of this
approval, before the issue of a Development Permit for Building Works by a Private
Building Certifier. The cash bond or trading bank guarantee will be returned on the
performance of the conditions of approval less any costs incurred by the Council in
respect of enforcing the performance of this permit. Council reserves the right to call
upon the bond or guaranteed sum in the event that the Appellant defaults in compliance
and does not rectify that compliance upon written request of the Respondent which shall
provide a reasonable time within which any such default is to be rectified.
Building Setback and Height
5. The proposed Detached House must be located on the site, as shown on the Proposed
Site Plan, Drawing No. DD1.3, Revision A. The Detached House is not to be located
closer than 4.3m to the seaward boundary on the northern side and 5.6m to the seaward
boundary on the southern side. The proposed elevated deck on the first level is not to
extend closer than 3m to the seaward boundary. Certification of the location of the
Detached House, including the elevated open deck from the seaward boundary, is to be
provided by a licenced surveyor before the issue of a final classification for the Detached
House by the building certifier. The certification must be submitted to Council.
Page 19 of 28
Section 20
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
6. The proposed Detached House must not exceed a maximum height of 8m from the
natural ground level and finished ground level, as shown on the North Elevation, Drawing
No. DD 2.1, Revision A and the South Elevation Drawing No. DD 2.2, Revision A. The
height of the Detached House from natural ground level and finished ground level shall
be certified by a licenced surveyor before the issue of a final classification for the dwelling
by the building certifier. The certification must be submitted to Council.
Geotechnical Stability
7. A footing system and erosion protection system must be designed to withstand the short-
term erosion associated with a 500-year average recurrence interval storm event
combined with shoreline recession due to sea-level rise for 2100 climate change.
The short-term erosion associated with a 500-year average recurrence interval storm
event combined with shoreline recession due to sea-level rise for 2100 climate change
to be considered for the design of stabilisation measures must be that shown on Figure
8-3 of the 2019 Omtrek report “Working Notes: Mason v Noosa Shire Council - 54
Seaview Terrace, Sunshine Beach”, (Reference J0033 R1, 11 May 2019).
8. The footing system and erosion protection system must in accordance with the works
detailed in the Tectonic report “Geotechnical Investigation, 54 Seaview Terrace,
Sunshine Beach”, (Reference 19078-003-Rev 0, 17 July 2020) and other supporting
documents referenced in the Tectonic report.
9. The design must include the protection of the northern and southern boundaries of the
site to prevent erosion on neighbouring properties exposing the side boundaries of the
site to erosion. The minimum extent of the side boundary protection must be determined
by a line drawn at 28° extending upwards to the west from the base of the rear point of
the erosion shown on Figure 8-3 of the 2019 Omtrek report “Working Notes: Mason v
Noosa Shire Council - 54 Seaview Terrace, Sunshine Beach”, (Reference J0033 R1, 11
May 2019).
10. The design must be accompanied by certification by a Registered Professional Engineer
of Queensland (RPEQ) specialising in geotechnical engineering that the design is
satisfactory and will provide a long-term factor of safety concerning slope stability of no
less than 1.5.
11. Following construction, certification must be supplied to Council by an RPEQ specialising
in geotechnical engineering that the works have been constructed under the approved
design.
12. A dilapidation survey shall be carried out of all adjacent properties before the demolition
of the existing dwelling on the site.
13. Due to the risk of instability on the existing dune slope and the potential for settlement of
loose sand on the adjacent properties, vibrations shall be kept to a minimum and shall
be monitored during the construction of the Detached House. Driven piles (both sheet
piles and pile footings) are not permitted on the site.
14. Landscaping at the rear of the property and the crest of the existing dune slope shall be
limited to a maximum surcharge of 5kPa unless a site-specific slope stability analysis is
carried out to demonstrate that higher loads are acceptable.
15. Under no circumstances shall building materials be temporarily stockpiled in the area of
the crest of the existing dune slope or on the slope.
16. Discharge of concentrated stormwater flows onto the dune slope shall be avoided, and
under no circumstances shall subsurface disposal of water be permitted using infiltration
pits.
17. Stormwater runoff from gutters, down-pipes, driveways, and paved areas shall be
collected and directed by pipes into the Council stormwater system along Seaview
Terrace. Where this is not possible, surface water should be directed to infiltrate into
the ground around the edges of hard surfaces, with infiltration areas set back as far as
possible from the crest of the dune slope.
Page 20 of 28
Section 21
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
18. The existing dune slope and any areas disturbed by the construction of the proposed
development shall be revegetated as soon as possible to reduce the potential for erosion.
Earthworks
19. Earthworks required on-site must be carried out under Council’s Planning Scheme Policy
PSP5 Engineering Design Standards, so as not to cause the additional ponding of water
on any adjoining lands or concentrate or direct overland flow on to an adjoining property.
Coastal Protection
20. A mix of native endemic coastal vegetation consisting of ground covers, shrubs and trees
shall be planted for the width of the property, from the edge of the dwelling to the seaward
boundary. The landscaping works is to be consistent with Planning Scheme Policy PSP3
- Landscaping Plants and Guidelines. The planted vegetation must have a minimum pot
size of 200mm and must be planted at the following density:
a. trees must have a maximum spacing of 5m;
b. shrubs must have a maximum spacing of 1.5m; and
c. ground covers planted between the trees and shrub stems from providing dense
coverage.
The development is to provide adequate landscape buffering to protect the character of
the beachfront, to the reasonable satisfaction of the Manager Development Assessment.
Pedestrian Access
21. A pedestrian access gate must not be installed along the seaward property boundary
with direct access by residents to the beachfront area not being permitted.
Significant Weather Event
22. Should a significant weather event occur which results in substantial erosion within the
site, and undermines the structure and/or renders the Detached House uninhabitable,
the owner must
22.1 Immediately secure the perimeter of the property to prevent unauthorised access
and then undertake necessary works upon the land to make the detached house
safe and suitable for habitation in a timely manner.
a. Any work proposed must be designed to ensure that the work will not cause
adverse impacts on other lands or on coastal processes.
b. Rock, concrete and like hard materials must not be used for the construction
of beach protection works.
c. Any work proposed to be carried out must undertaken in accordance with a
Development Permit for Operational Works.
22.2 or remove the Detached House and all associated structures including the footpath
crossover and make the land safe at no cost to the Council.
5 INFRASTRUCTURE SERVICES DEPARTMENT UPDATE – 1ST QUARTER 2020-21
That Council note the report by the Director Infrastructure Services to the Services &
Organisation Committee Meeting dated 10 November 2020 providing an update on operations
of the Infrastructure Services Department for the period 1 July to 30 September 2020.
Page 21 of 28
Section 22
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
6 NOOSA COUNCIL 2019-20 ANNUAL REPORT
That Council note the report by the Director Executive Services to the General Committee
Meeting dated 16 November 2020 and:
A. Adopt the Noosa Council 2019-20 Annual Report incorporating the 2019-20 Audited
Financial Statements provided as Attachment 1 to this report.
B. Authorise the Chief Executive Officer to make any required minor amendments
7 FINANCIAL PERFORMANCE REPORT – OCTOBER 2020
That Council note the report by the Manager Financial Services to the General Committee
Meeting dated 16 November 2020 outlining October 2020 year to date financial performance
against budget, including performance against key financial sustainability indicators.
Page 22 of 28
Section 23
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
9 ORDINARY MEETING REPORTS
Nil.
10 CLOSED SESSION
Nil.
11 PUBLIC QUESTION TIME
Nil.
12 NEXT MEETING
The next Ordinary Meeting will be held on 17 December 2020 at the Council Chambers,
9 Pelican Street, Tewantin commencing at 5pm.
13 MEETING CLOSURE
The meeting closed at 5.23pm.
Page 23 of 28
Section 24
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
ATTACHMENT 1
Page 24 of 28
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
ATTACHMENT 1
From: |
To: Clare Stewart; Mailbox Council Mail; The J
Subject: We strongly oppose Noosa Satanic Black
5 1 1 1 5 8 1235 499 84 27 92 Mass
Date: Thursday, 29 October 2020 4:04:24 PM
Attachments: Protest against the Satanic Black
5 1 1 1 7 7 1113 593 81 31 96 Mass;
5 1 1 1 7 8 1206 591 146 28 96 scheduled
5 1 1 1 7 9 1364 591 41 28 96 for
5 1 1 1 7 10 1416 593 34 26 96 30
5 1 1 1 7 11 1462 591 124 33 96 October,
5 1 1 1 7 12 1599 593 25 26 96 in
5 1 1 1 7 13 1633 591 49 28 96 the
5 1 1 1 7 14 1690 593 14 26 95 J
5 1 1 1 7 15 1716 591 113 33 96 theatre,
5 1 1 1 7 16 1842 593 88 26 92 Noosa
5 1 1 1 7 17 1942 591 178 34 58 (1-2411).xls
4 1 1 1 8 0 270 709 1203 63 -1
5 1 1 1 8 1 270 712 112 46 96 Over
5 1 1 1 8 2 397 709 126 58 96 2,000
5 1 1 1 8 3 541 712 101 60 96 Sign
5 1 1 1 8 4 660 712 168 46 96 Petition
5 1 1 1 8 5 846 717 42 41 96 to
5 1 1 1 8 6 903 712 105 60 96 Stop
5 1 1 1 8 7 1027 712 145 46 95 Noosa
5 1 1 1 8 8 1191 712 136 46 95 ‘Black
5 1 1 1 8 9 1343 712 130 46 82 Mass’
4 1 1 1 9 0 270 786 600 49 -1
5 1 1 1 9 1 270 786 188 49 96 Sydney,
5 1 1 1 9 2 477 786 56 38 96 29
5 1 1 1 9 3 553 786 187 38 96 October
5 1 1 1 9 4 755 786 115 38 95 2020
4 1 1 1 10 0 271 849 624 49 -1
5 1 1 1 10 1 271 849 114 37 96 Dear
5 1 1 1 10 2 403 849 145 49 95 Mayor
5 1 1 1 10 3 563 849 124 37 96 Clare
5 1 1 1 10 4 706 849 189 46 95 Stewart,
4 1 1 1 11 0 270 911 1123 49 -1
5 1 1 1 11 1 270 911 86 38 96 and
5 1 1 1 11 2 375 911 107 38 90 Kerri
5 1 1 1 11 3 502 911 174 46 90 Contini,
5 1 1 1 11 4 699 911 182 38 96 Director
5 1 1 1 11 5 899 911 265 49 96 Community
5 1 1 1 11 6 1182 911 211 45 96 Services,
4 1 1 1 12 0 268 974 1892 50 -1
5 1 1 1 12 1 268 974 93 48 96 We,
5 1 1 1 12 2 378 974 73 40 96 the
5 1 1 1 12 3 469 974 301 50 95 undersigned,
5 1 1 1 12 4 791 974 184 50 96 strongly
5 1 1 1 12 5 992 983 172 41 96 oppose
5 1 1 1 12 6 1181 974 71 40 96 the
5 1 1 1 12 7 1271 974 175 40 93 Satanic
5 1 1 1 12 8 1462 974 139 40 90 'Black
5 1 1 1 12 9 1620 974 131 40 91 Mass'
5 1 1 1 12 10 1768 974 239 40 95 scheduled
5 1 1 1 12 11 2024 974 63 40 96 for
5 1 1 1 12 12 2104 974 56 40 96 30
4 1 1 1 13 0 270 1037 720 37 -1
5 1 1 1 13 1 270 1037 190 37 96 October
5 1 1 1 13 2 474 1037 116 37 96 2020
5 1 1 1 13 3 608 1037 43 37 96 at
5 1 1 1 13 4 665 1037 90 37 96 The
5 1 1 1 13 5 772 1037 23 37 96 J
5 1 1 1 13 6 812 1037 178 37 92 theatre.
4 1 1 1 14 0 268 1102 1764 49 -1
5 1 1 1 14 1 268 1102 61 37 96 As
5 1 1 1 14 2 347 1102 89 37 96 The
5 1 1 1 14 3 454 1102 21 37 94 J
5 1 1 1 14 4 497 1102 34 37 94 is
5 1 1 1 14 5 549 1102 153 37 95 owned
5 1 1 1 14 6 719 1102 85 37 96 and
5 1 1 1 14 7 823 1102 207 49 96 operated
5 1 1 1 14 8 1048 1102 54 49 96 by
5 1 1 1 14 9 1121 1102 149 37 95 Noosa
5 1 1 1 14 10 1290 1102 185 46 95 Council,
5 1 1 1 14 11 1495 1102 26 37 96 it
5 1 1 1 14 12 1537 1102 36 37 96 is
5 1 1 1 14 13 1587 1102 134 37 96 within
5 1 1 1 14 14 1737 1111 105 40 96 your
5 1 1 1 14 15 1859 1102 116 37 94 remit
5 1 1 1 14 16 1988 1102 44 37 94 to
4 1 1 1 15 0 269 1165 1084 48 -1
5 1 1 1 15 1 269 1165 258 48 95 disapprove
5 1 1 1 15 2 544 1165 72 37 95 the
5 1 1 1 15 3 635 1173 81 29 96 use
5 1 1 1 15 4 734 1165 46 37 96 of
5 1 1 1 15 5 793 1165 81 37 96 this
5 1 1 1 15 6 892 1173 139 40 96 space
5 1 1 1 15 7 1047 1165 62 37 96 for
5 1 1 1 15 8 1124 1165 71 37 96 the
5 1 1 1 15 9 1213 1165 140 37 96 event.
4 1 1 1 16 0 268 1227 1788 49 -1
5 1 1 1 16 1 268 1227 100 40 96 This
5 1 1 1 16 2 385 1227 129 40 96 event
5 1 1 1 16 3 531 1227 34 40 96 is
5 1 1 1 16 4 585 1227 71 40 96 not
5 1 1 1 16 5 672 1227 149 49 95 simply
5 1 1 1 16 6 839 1237 54 30 95 an
5 1 1 1 16 7 911 1227 153 40 96 artistic
5 1 1 1 16 8 1082 1227 294 49 96 performance
5 1 1 1 16 9 1392 1237 49 30 96 or
5 1 1 1 16 10 1456 1237 55 30 96 an
5 1 1 1 16 11 1531 1227 250 49 96 expression
5 1 1 1 16 12 1801 1227 45 40 96 of
5 1 1 1 16 13 1862 1227 194 49 96 religious
4 1 1 1 17 0 270 1290 1878 49 -1
5 1 1 1 17 1 270 1290 137 37 96 belief.
5 1 1 1 17 2 429 1290 27 37 90 It
5 1 1 1 17 3 472 1290 36 37 96 is
5 1 1 1 17 4 524 1299 28 28 96 a
5 1 1 1 17 5 568 1290 243 46 94 deliberate,
5 1 1 1 17 6 832 1290 235 37 96 calculated
5 1 1 1 17 7 1088 1290 139 37 96 attack
5 1 1 1 17 8 1243 1299 54 28 96 on
5 1 1 1 17 9 1318 1290 271 49 96 Christianity.
5 1 1 1 17 10 1613 1290 24 37 95 It
5 1 1 1 17 11 1655 1290 34 37 96 is
5 1 1 1 17 12 1707 1290 155 49 96 deeply
5 1 1 1 17 13 1878 1290 210 37 96 offensive
5 1 1 1 17 14 2105 1290 43 37 96 to
4 1 1 1 18 0 270 1355 1936 49 -1
5 1 1 1 18 1 270 1355 235 37 96 Christians
5 1 1 1 18 2 519 1355 255 49 96 throughout
5 1 1 1 18 3 790 1355 216 46 96 Australia,
5 1 1 1 18 4 1027 1355 84 37 96 and
5 1 1 1 18 5 1132 1364 25 28 96 a
5 1 1 1 18 6 1176 1355 167 37 96 serious
5 1 1 1 18 7 1361 1355 173 37 96 offence
5 1 1 1 18 8 1550 1355 171 49 96 against
5 1 1 1 18 9 1737 1355 95 37 96 God
5 1 1 1 18 10 1850 1355 89 37 96 that
5 1 1 1 18 11 1953 1355 72 37 96 will
5 1 1 1 18 12 2042 1355 164 37 96 foment
4 1 1 1 19 0 270 1418 770 49 -1
5 1 1 1 19 1 270 1418 195 49 96 religious
5 1 1 1 19 2 484 1418 100 37 96 hate
5 1 1 1 19 3 602 1418 84 37 96 and
5 1 1 1 19 4 705 1418 335 37 96 discrimination.
4 1 1 1 20 0 268 1480 1000 49 -1
5 1 1 1 20 1 268 1480 79 40 96 We
5 1 1 1 20 2 365 1490 103 39 96 urge
5 1 1 1 20 3 485 1490 82 39 96 you
5 1 1 1 20 4 585 1481 43 39 96 to
5 1 1 1 20 5 646 1480 150 40 96 cancel
5 1 1 1 20 6 812 1480 83 40 96 this
5 1 1 1 20 7 911 1481 130 39 96 event
5 1 1 1 20 8 1055 1480 213 40 96 forthwith.
4 1 1 1 21 0 270 1543 218 188 -1
5 1 1 1 21 1 270 1543 218 188 0 a
4 1 1 1 22 0 268 1734 350 38 -1
5 1 1 1 22 1 268 1734 235 38 92 Australian
5 1 1 1 22 2 520 1734 98 38 91 TFP
4 1 1 1 23 0 270 1796 1055 49 -1
5 1 1 1 23 1 270 1796 67 37 96 On
5 1 1 1 23 2 358 1796 145 37 96 behalf
5 1 1 1 23 3 514 1796 46 37 96 of
5 1 1 1 23 4 574 1796 124 45 96 2,411
5 1 1 1 23 5 722 1796 256 49 95 signatories
5 1 1 1 23 6 995 1796 43 37 96 to
5 1 1 1 23 7 1052 1796 83 37 96 this
5 1 1 1 23 8 1153 1796 172 37 96 Petition
4 1 1 1 24 0 270 1861 1039 49 -1
5 1 1 1 24 1 270 1861 60 49 96 (cf
5 1 1 1 24 2 344 1861 200 38 96 attached
5 1 1 1 24 3 565 1861 124 38 96 Excel
5 1 1 1 24 4 706 1861 66 38 96 file
5 1 1 1 24 5 789 1861 92 38 96 with
5 1 1 1 24 6 900 1861 123 46 96 2,411
5 1 1 1 24 7 1047 1861 262 49 96 signatures)
4 1 1 1 25 0 1919 3316 289 44 -1
5 1 1 1 25 1 1919 3316 106 44 96 Page
5 1 1 1 25 2 2040 3317 48 33 95 24
5 1 1 1 25 3 2105 3316 41 35 95 of
5 1 1 1 25 4 2159 3317 49 34 96 28Section 25
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
ATTACHMENT 2
Page 25 of 28
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
ATTACHMENT 2
To Mayor Clare Stewart,
Councillors Wilkie, Finzel, Lorentson, Stockwell, Jurisevic and Wegener.
Undersigned is over 180 residents of Bushlands and Doonella estates who want
and need another exit besides the two into the congested Beckmans Road.
This petition seeks to build a short (150m) two-way, or even one-way outbound
road between the wide Bushlands Drive through the north-eastern side of
Bushlands Park beside the businesses, to join Gateway Drive opposite the trades
entrance of Bunnings.
As Councillors will know, during the Council and State elections the road outside
the polling booths
becomes very congested, especially during school times!
Council has successfully built roads over low areas like McKinnon Drive, past
Yellowood Close, and Butler Street joining McKinnon Drive to Poinciana Ave. This
section of road, joining Bushlands to Gateway is shorter, and, with fill and
drainage pipes should be successful in providing an alternative exit.
Lastly, residents want, and may need, a quick, accessible exit when needing to
evacuate in the bushfire season. ;
Yours faithfully,
a LAT
a CD
oy MECEive, oe
I NOV 2009 |=)
* Tx|
, a “eee Coune, As)
ds A
SC‘ <cry
Page 25 of 28Section 26
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
Page 26 of 28
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
ps
= ‘
3) S ‘
2/5) 4 fy ao e [ar ff fF
SL LO Inf f ,
= th | ig / /
apie ——or ; § \ <>
st
Sattee fl yt
tnd >)
: > —
9
5 1 1 1 13 2 1316 877 21 81 18 =<
5 1 1 1 13 3 1440 881 45 60 2 \S
4 1 1 1 14 0 692 947 819 123 -1
5 1 1 1 14 1 692 997 143 73 47 a
5 1 1 1 14 2 1322 947 57 86 30 a
5 1 1 1 14 3 1464 983 47 68 55 2
4 1 1 1 15 0 629 1036 891 91 -1
5 1 1 1 15 1 629 1036 244 91 56 eR,
5 1 1 1 15 2 1345 1042 60 66 56 %
5 1 1 1 15 3 1475 1056 45 42 82 \3
4 1 1 1 16 0 437 1140 1114 101 -1
5 1 1 1 16 1 437 1140 468 101 0 atmis+oO
5 1 1 1 16 2 1510 1163 41 61 0 S
4 1 1 1 17 0 463 1206 523 84 -1
5 1 1 1 17 1 463 1206 339 75 23 trae
5 1 1 1 17 2 817 1207 169 83 46 As!
5 1 1 1 17 3 1329 1231 17 26 91 \
4 1 1 1 18 0 509 1276 1072 64 -1
5 1 1 1 18 1 509 1279 321 61 0 CUA
5 1 1 1 18 2 857 1276 153 61 14 sO
5 1 1 1 18 3 1580 1299 1 4 16 :
4 1 1 1 19 0 547 1319 920 79 -1
5 1 1 1 19 1 547 1319 238 79 0 BAVA
5 1 1 1 19 2 814 1328 151 67 0 O%
5 1 1 1 19 3 1409 1354 58 38 21 y
4 1 1 1 20 0 584 1374 405 66 -1
5 1 1 1 20 1 670 1379 48 37 28 A
5 1 1 1 20 2 748 1376 67 51 63 4
5 1 1 1 20 3 841 1374 64 66 43 S
5 1 1 1 20 4 945 1402 44 31 19 co
4 1 1 1 21 0 622 1426 785 89 -1
5 1 1 1 21 1 622 1441 52 48 8 _
5 1 1 1 21 2 695 1426 166 89 0 .
5 1 1 1 21 3 875 1428 36 71 0 :
5 1 1 1 21 4 1328 1425 38 74 32 SN
4 1 1 1 22 0 649 1485 456 89 -1
5 1 1 1 22 1 649 1485 327 80 8 aon
5 1 1 1 22 2 1029 1503 76 71 1 FZ,
4 1 1 1 23 0 699 1550 717 58 -1
5 1 1 1 23 1 699 1551 134 51 61 st
5 1 1 1 23 2 879 1550 153 55 5 RE
5 1 1 1 23 3 1083 1575 46 33 5 Sy
4 1 1 1 24 0 828 1588 581 71 -1
5 1 1 1 24 1 828 1602 13 47 54 Qo
5 1 1 1 24 2 922 1588 138 71 0 LN,
5 1 1 1 24 3 1121 1603 23 45 61 oO
5 1 1 1 24 4 1400 1607 9 28 83 /
4 1 1 1 25 0 736 1631 654 72 -1
5 1 1 1 25 1 736 1631 156 72 58 Tay
5 1 1 1 25 2 943 1639 153 60 28 Se
5 1 1 1 25 3 1386 1672 4 12 86 |
4 1 1 1 26 0 866 1680 250 53 -1
5 1 1 1 26 1 866 1680 47 32 0 e
5 1 1 1 26 2 1073 1690 43 43 0 e
4 1 1 1 27 0 841 1705 844 81 -1
5 1 1 1 27 1 841 1706 20 80 47 sy
5 1 1 1 27 2 891 1705 69 67 31 ot
5 1 1 1 27 3 1086 1707 47 62 9 “7
5 1 1 1 27 4 1660 1742 25 9 0 ~
4 1 1 1 28 0 935 1766 718 51 -1
5 1 1 1 28 1 935 1768 44 33 86 9
5 1 1 1 28 2 1125 1766 49 39 0 <
5 1 1 1 28 3 1348 1784 8 26 69 j
5 1 1 1 28 4 1544 1783 109 34 15 Pen:
4 1 1 1 29 0 961 1806 373 67 -1
5 1 1 1 29 1 961 1806 34 67 49 Lt
5 1 1 1 29 2 1333 1855 1 3 84 |
4 1 1 1 30 0 1289 1960 562 58 -1
5 1 1 1 30 1 1289 1979 10 35 66 fa
5 1 1 1 30 2 1399 1986 4 22 44 |
5 1 1 1 30 3 1710 1960 66 42 61 4R
5 1 1 1 30 4 1793 1971 58 47 61 Pg
4 1 1 1 31 0 1167 1989 768 81 -1
5 1 1 1 31 1 1272 2020 16 50 30 |
5 1 1 1 31 2 1836 1989 99 44 9 IRA
4 1 1 1 32 0 1235 2035 107 97 -1
5 1 1 1 32 1 1235 2072 37 60 48 /
5 1 1 1 32 2 1326 2035 16 80 34 i}
4 1 1 1 33 0 428 2153 563 68 -1
5 1 1 1 33 1 428 2157 81 58 6 OFF
5 1 1 1 33 2 509 2153 51 68 6 ic
5 1 1 1 33 3 989 2208 2 2 0 ,
4 1 1 1 34 0 553 2180 483 103 -1
5 1 1 1 34 1 553 2182 186 95 38 “Worrs
5 1 1 1 34 2 947 2180 89 103 55 ee
4 1 1 1 35 0 935 2270 91 66 -1
5 1 1 1 35 1 935 2270 271 78 15 a
4 1 1 1 36 0 1236 2389 167 22 -1
5 1 1 1 36 1 1236 2403 3 1 0 s
5 1 1 1 36 2 1332 2389 13 21 88 \
5 1 1 1 36 3 1401 2409 2 2 52 ‘
4 1 1 1 37 0 244 2424 1232 162 -1
5 1 1 1 37 1 244 2539 50 38 46 <Z
5 1 1 1 37 2 318 2538 170 39 38 na
5 1 1 1 37 3 1354 2424 122 162 47 SY
4 1 1 1 38 0 332 2579 1202 94 -1
5 1 1 1 38 1 332 2579 59 41 33 —
5 1 1 1 38 2 406 2582 79 52 27 VO;
5 1 1 1 38 3 509 2612 114 27 28 “Ahan
5 1 1 1 38 4 1494 2585 40 88 35 \;
4 1 1 1 39 0 599 2674 947 71 -1
5 1 1 1 39 1 599 2687 13 2 94 =
5 1 1 1 39 2 652 2688 36 45 19 Toe
5 1 1 1 39 3 696 2700 163 24 19 eee
5 1 1 1 39 4 1029 2689 54 56 26 ie
5 1 1 1 39 5 1356 2683 23 54 31 “J
5 1 1 1 39 6 1494 2674 52 51 46 Ire
4 1 1 1 40 0 1919 3316 289 44 -1
5 1 1 1 40 1 1919 3316 106 44 96 Page
5 1 1 1 40 2 2040 3317 48 34 95 26
5 1 1 1 40 3 2104 3316 41 35 95 of
5 1 1 1 40 4 2159 3317 49 34 95 28Section 27
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
Page 27 of 28
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
Petition to build a road link from Bushlands drive to Gateway drive
(approximately across 100m of bushland opposite Bunnings trades entrance).
This will provide an alternative access for residents and schoo! traffic and help
decongest Beckman’s road on school mornings.
Name, Address ) —_ _ Phone Signature _
i ff} #7 / fy -—_ (optional rs _|
f 7
|
!
|
|
|
0]
oa?!
| ]
Page 27 of 28Section 28
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
ATTACHMENT 3
Page 28 of 28
ORDINARY MEETING MINUTES 19 NOVEMBER 2020
ATTACHMENT 3
17 Nov 20
To: Noosa Council
Re: Treehouse in Lowry Park at the intersection of Paldao Rise and Juniper Crt
We the undersigned support the retention of the treehouse built in Lowry Park at the intersection
of Paldao Rise and Juniper Crt, Peregian Beach and urge the leaders of Noosa Shire Council to
allow the said treehouse to remain in situ. The said treehouse was built (under adult supervision
and assistance) and is used by many local children and is therefore of benefit to the community.