ORDINARY MEETING MINUTES 19 NOVEMBER 2020
12.3 The Vegetation Clearing Offset program must include the details of the
transfer methods to be engaged including:
12.3.1 The transfer of soil/seed bank media off the site to the designated
receiving site(s);
12.3.2 Methods of transfer including, inter alia, mastication of native
vegetative matter, tile transfer of live soil/plant matrix, peat locations
and extents, sexual and vegetative methods of revegetation of offset
receiving site and other deemed pertinent matters by a person with
industry experience in the successful establishment and/or re-
establishment of heathland vegetation;
12.3.3 Transfer of rare and threatened plant species (sexual and/or
vegetative);
12.3.4 Details of pre-treatment works prior to transfer of soil/seed bank
media off the site and methods of transplanting;
12.3.5 Details of seed collections times and estimated establishment
procedures and times;
12.3.6 Details of the receiving site, including tenure, contractual details,
establishment, monitoring and maintenance details and suitability of
the site for the purpose;
12.3.7 All information must be prepared by a person with industry
experience in the successful establishment and/or re-establishment
of heathland vegetation. Industry and educational institution
involvement is recommended.
The establishment of the vegetation offsets for each stage must be
completed prior to the commencement of the use for each stage. The
Vegetation Clearing Offset program, required by these conditions, must be
implemented in a staged manner reflective of the approved staging of the
development. To this end separate Vegetation Clearing Offset programs
must be developed to reflect the staged delivery of the development, in
particular the staged development of lot 6, and the subsequent development
of lot 9.
12.4 No clearing is permitted unless in accordance with the approved staged
Vegetation Clearing Offset program.
14. The Vegetation Management operational works application must detail the location
and extent and staging of vegetation disturbance on Lot 9 SP252905 and Lot 6
RP901384 must be accurately marked on-site, including any setback requirements
for bushfire mitigation purposes, for Council officers to inspect prior to
commencement of any vegetation clearing.
Bushfire
23. A bushfire evacuation plan for the site must be prepared by a qualified person and
submitted to Council prior to the issue of any Development Permit for Operational
Works.
CIVIL ENGINEERING
Frontage Works
33. Pedestrian crossings shall be provided in Grasstree Court generally as shown on
‘Masterplan’ prepared by Thomson Adsett dated 15 October 2020, Plan Ref:
DA_106 Rev. 3. The crossing shall include linemarking and suitable signage in
accordance with the MUTCD.
Page 14 of 28