B. each Type-A or Type-B sediment basin is to be provided with an automated
system of flocculant dosing and a suitable supply of flocculant/coagulant,
with the type of flocculant/coagulant determined based on Chemical
Coagulants and Flocculants Fact Sheet (IECA, 2018);
C. markers are provided within each basin indicating the maximum sediment
storage level and any additional water storage capacity for water reuse;
D. during discharge from the primary outlet system, the concentration of total
suspended solids (TSS) discharged does not exceed 50mg/L and that pH
is within the range of 6.5-8.54. These discharge standards apply equally to
any intentional release of any water captured or stored within the site;
E. The hydraulic structures such as inlets, outlets, spillways must be
structurally sound for the design events as specified in IECA (2008); and
F. The sediment basin is to be constructed and operational before any
disturbance occurs in the catchment upslope of the basin. Accumulated
sediment from basins and other controls is to be removed and disposed of
appropriately without causing water contamination.
ii. For site sub-catchments less than 2,500m2 in area and where it is not feasible
to divert runoff from these small disturbed areas of the site to a sediment basin,
compensatory erosion and sediment controls are implemented prior to rainfall
to ensure that erosion of those of areas is minimised and Type 2 or Type 3
sediment controls are provided in accordance with IECA (2008).
iii. Controls are to be installed to minimise the tracking of dirt from the site onto
roadways. Any dirt on roadways caused by vehicles leaving the site is to be
removed without causing water contamination, prior to rainfall and at least at
the end of each work day.
d. Manage works within waterways:
i. Waterways, including perennial and permanent waterways, are not to be
altered, nor riparian (including rehabilitated) vegetation disturbed without prior
written approval of the relevant administering authority.
ii. Work within waterways is to be:-
A. only undertaken during the lower rainfall months;
B. promptly rehabilitated conforming to the natural channel form, substrates
and riparian vegetation as far as possible; and
C. undertaken in accordance with Best Practice Erosion and Sediment
Control, Appendix I – Instream works, Sections 14 and 16, (International
Erosion Control Association, 2008).
iii. Temporary vehicular crossings of waterways are to be designed and
constructed to convey flows for the 63%AEP and remain stable for all rainfall
events up to the 10% AEP event of critical duration.
iv. ESCs are not to be constructed within the riparian buffer zone, unless it is not
feasible to site them elsewhere, and then only within cleared areas.
Page 21 of 34
Document Set ID: 24095782
Version: 12, Version Date: 05/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Decision Notice - MCU24 0125, OPW24 158 & RAL24 0021 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 282 KB (small file)
- File type
No other editions are linked here.