Original source · versioned page text
Proposal Plans
1. RENDER 'GREEN' 2. SCRIBBED RENDER 'GREEN' 3. GB HONED CONCRETE BLOCK 4. OFF-FORM CONCRETE
'PORCELAIN'
5. VERTICAL BATTEN SCREEN 6. POWDERCOAT ALUMINIUM 7. EXPOSED AGG. DRIVEWAY 8. STONE STEPPERS
'GREEN' 'PEWTER PEARL' 'SALT AND PEPPER'
DA DOCUMENTATION
DATE REV DESCRIPTION NOTES: Office 1 - 2 / 2460 Gold Coast Hwy, CLIENT: CONSULTANTS: PROJECT: SCALE: DRAWN BY:
Mermaid Beach, QLD
BOTTLEBRUSH
17.04.25 1 DA DOCUMENTATION
M: 0407 655 238 STRUCTURE: N/A 1:1 @ A3 LB
E: [email protected] CIVIL: N/A SHEET NAME:
W: www.studioworkshop.com.au
J. HAINES ELECTRICAL:
MECHANICAL:
N/A
N/A MATERIALS AND FINISHES
ALL DIMENSIONS TO BE VERIFIED BY BUILDER. ALL WORKS TO COMPLY WITH A.S.1684 AND LOCATION:
FIRE: N/A
23 BOTTLEBRUSH AVE
OTHER RELEVANT CODES. THESE DESIGNS, PLANS, SPECIFICATIONS AND COPYRIGHT
THEREIN ARE THE PROPERTY OF STUDIO WORKSHOP AND MUST NOT BE USED, COPIED OR
REPRODUCED WITHOUT CONSENT. © 2025 HYDRAULIC: N/A JOB NO: DRAWING NO: ISSUE:
ABN 92 603 817 983 Nominated Architect - Chris Knapp | QLD Reg - #5922 | NSW Reg - #11997 CERTIFIER: LATERAL CERTIFICATION GROUP NOOSA HEADS QLD 4567 24-33 DA06 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Proposal Plans.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.