Delegated Report - Code - Planning MCU25 0053 · MCU25/0053

of 19

Text shows just the words. Original shows the document exactly as it was published.

               DEVELOPMENT ASSESSMENT DELEGATED REPORT

               Author                   Development Planner, Matthew Pinese
                                        Development Assessment



                  APPLICATION DETAILS

                  Application No.                   MCU25/0053 and OPW25/0074

                  Applicant                         Seymour Leisure P/L TTE

                  Proposal                          Material Change of Use - Dwelling house (Basement)

                  Properly Made Date                8 May 2025

                  Information Request Date          9 June 2025

                  Information Response Date         26 September 2025

                  Decision Due Date                 21 November 2025

                  Report Reviewed &                 Andrew Gaffney – 21 November 2025
                  Finalised By


                  PROPERTY DETAILS

                  Property Address                  7 Noosa Parade, Noosa Heads Qld 4567

                  RP Description                    BUP10936

                  Land Area                         1120m²

                  Existing Use of Land              Multiple Dwelling (3 Units and 2 Professional Units (Real Estate
                                                    and Architect)


                  STATUTORY DETAILS

                  SEQRP Designation                 Urban Footprint

                  Zone                              Medium Density Residential Zone

                  Precinct                          Precinct

                  Local Plan Area                   Noosa Heads

                  Overlays                          Land Subject to Acid Sulphate Soils Overlay
                                                    -      5 metres AHD or Below (Area 1)
                                                    Flood Hazard Overlay Map
                                                    -      Flooding and Inundation Extent

                  Assessment Type                   Code




Document Set ID: 24261132
Version: 12, Version Date: 26/11/2025
Full text of the other 18 pages

Page 2

               1.     PROPOSAL
               The application seeks approval for a Material Change of Use - Dwelling house (Basement). The
               proposal includes excavation:
               •      exceeding 1.5 metres in depth relative to ground level; and
               •      of more than 100m3 of material with Area 1 of the Acid Sulfate Soils Overlay Map
               •      or filling other than for the purpose of a dam, where involving more than 10m3 of material.
               The application also includes a Material Change of Use for a Dwelling House on land subject to
               the Flood Hazard Overlay (Flooding and Inundation Area)
               This excavation is proposed for a basement that includes a six-car garage, service and storage
               areas for bins, gardening and pool equipment, plant, a cellar, a sauna, a spa and a shower.
               Above the basement is a proposed two-storey dwelling that includes six bedrooms, a pool and pool
               terrace, a rear terrace and a landscaped front court.
               The locality and proposal plan are included below.




                                                         Figure 1 – Locality




                                                                                                     Page 2 of 19

Document Set ID: 24261132
Version: 12, Version Date: 26/11/2025

Page 3

                                        Figure 2 – Site Plan




                                                               Page 3 of 19

Document Set ID: 24261132
Version: 12, Version Date: 26/11/2025

Page 4

                                        Figure 3 – Floor Plan




                                                                Page 4 of 19

Document Set ID: 24261132
Version: 12, Version Date: 26/11/2025

Page 5

                                                      Figure 4 – Elevations

               2.     SITE DETAILS
               2.1. Site History
               51901.4280 (TPC 656) – Town Planning Consent for Multiple Dwelling 3 Units and 2 Professional
               Units (Real Estate and Architect was given on 11 July 2025.
               2.2. Site Description
               The site is located at 7 Noosa Parade, Noosa Heads and comprises five (5) allotments, one of
               which comprises a community titles scheme, formally described as Lot 0 on BUP10936 (Common
               Property) and Lot 1-4 on BUP10936. The site is not identified as being burdened by or benefitting
               from any easements. The site has a single frontage to Noosa Parade to the northern boundary of
               the site (approximately 20 metres) and back onto the Noosa Sound canal system.


                                                                                                  Page 5 of 19

Document Set ID: 24261132
Version: 12, Version Date: 26/11/2025

Page 6

               The site is subject to an existing community title scheme, being the No. 7 Noosa Parade
               Community Titles Scheme 4624. The community titles scheme will be collapsed to create a single
               freehold title.
               2.3. Surrounding Land Uses
               The following images depict the surrounding site context, which can be summarised as follows:
               North – land uses to the north of the site comprise one and two storey detached dwellings.
               South – on the southern side of the Noosa Sound canal system, opposite the site, are
               predominantly two storey detached dwellings.
               East – the site adjoins a public park (Noosa Park East).
               West – the site adjoins a two-storey, 4 dwelling building and a public park (Witta Park).
               3.     ASSESSMENT
               3.1. Instruments for Statutory Assessment
               Under the Planning Act 2016 the application must be assessed against each of the following
               statutory planning instruments to the extent they are relevant to the development:
               •      State Planning Policy;
               •      South East Queensland Regional Plan;
               •      Planning Regulation 2017; and
               •      Noosa Plan 2020 (25 September 2020).
               3.2. Noosa Plan 2020
               The following codes from the Noosa Plan 2020 are applicable to this development:
               •      Medium Density Residential Zone Code;
               •      Noosa Heads Local Plan Code;
               •      Low Density Housing Code;
               •      Works Codes;
               •      Acid Sulfate Soils Overlay Code
               •      Flood Hazard Overlay Code
               The subject site is in Noosa Heads and is zoned Medium Density Residential. The proposed use
               is identified as a consistent use within the zone and is required to follow a code assessable
               application process.
               The application has been found to generally comply with all applicable statutory instruments. The
               pertinent issues arising out of the assessment are discussed below:

                Criteria                   Planning Scheme                Proposal                    Complies


                Building height
                •    storeys               2 storeys max                  2 storeys                        
                •    metres                8 metres                       7.9 metres                       

                Site cover                 40%                            37.5%                            

                Gross floor area           N/A in Medium Density 457 m²                                    
                                           Residential Zone

                Boundary setbacks
                Ground Floor Plan / up to 4.5m

                                                                                                     Page 6 of 19

Document Set ID: 24261132
Version: 12, Version Date: 26/11/2025

Page 7

                Criteria                   Planning Scheme        Proposal                         Complies


                Frontage                   6.0m min               11 m to wall                        
                                                                  2.25m to blade           wall       X
                                                                  running  parallel        with
                                                                                                      X
                                                                  driveway
                                                                  0.8m to front fence and
                                                                  gate                                X
                Side (east)                1.5m min               3.9 m to ground floor wall          
                Side (west)                1.5m min               1.5 m to ground floor wall          
                Rear                       6.0m min               10.2 m to ground floor wall         

                First Floor Plan / 4.5m – 7.5m

                Frontage                   6.0 m min              7.2m to front balcony               
                Side (east)                2.0 – 2.5m min         2m to first floor wall              
                Side (west)                2.0 – 2.5m min         2m to first floor wall              
                Rear                       6.0m min               7.3 metres to first floor           
                                                                  balcony

                Length of wall             15 metres max          12.2 metres                         

                Landscaping
                Soft landscaping           Min 20% of site area   225m² (20.9%)                       

                Carparking                 2 covered min          6 covered                           

               Setbacks
               Acceptable Outcome AO12.1 of the Medium Density Residential Zone Code states:




                                                                                                  Page 7 of 19

Document Set ID: 24261132
Version: 12, Version Date: 26/11/2025

Page 8

               The applicant is proposing the reduced setbacks for the front fence and wall and shown in the table
               above and as such the development does not comply with AO12.1 and AO12.2 of the Medium
               Density Residential Zone Code. The proposal is therefore required to comply with the
               corresponding Performance Outcome PO12 of the Medium Density Residential Zone Code,
               which states:




               Assessment
               The outermost projection of the proposed dwelling, being the front balcony, achieves a minimum
               setback of 7.2 metres from the front boundary. This setback exceeds the minimum requirements
               and contributes positively to the amenity of both the subject site and adjoining properties by
               enhancing visual and acoustic privacy. Given that Noosa Parade functions as a distributor road,
               the increased setback provides an appropriate buffer that mitigates traffic-related noise impacts,
               thereby improving acoustic amenity for occupants. Additionally, the proposed setback supports
               visual separation and maintains sightlines to the adjoining property at 9 Noosa Parade, contributing
               to a respectful interface between dwellings.

                                                                                                     Page 8 of 19

Document Set ID: 24261132
Version: 12, Version Date: 26/11/2025

Page 9

               Within the front setback area, the development incorporates a curved block front fence, within a
               landscaped area, recessed 0.75 metres from the front boundary. The associated driveway and
               pedestrian access gates are further recessed, achieving a setback of approximately 1.75 metres.
               The proposed fencing arrangement, located adjacent to a distributor road, complies with the
               Acceptable Outcomes AO17.1 to AO17.4 of the Medium Density Residential Zone Code.
               Specifically, the front fence height does not exceed 1.8 metres, consistent with AO17.4, and the
               design ensures visual interest and articulation in accordance with the zone code’s intent to maintain
               streetscape character, amenity and pedestrian safety.
               Streetscape
               Acceptable Outcome AO14.5 of the Medium Density Residential Zone Code states:




               The development proposes a vertical distance of 3.7m between the ground and the lowest
               suspended floor and as such the development does not comply with AO14.5 of the Medium Density
               Residential Zone Code. The proposal is therefore required to comply with the corresponding
               Performance Outcome PO14 of the Medium Density Residential Zone Code, which states:




               Assessment
               The proposed vertical separation of 3.7 metres between natural ground level and the suspended
               floor fronting Noosa Parade is appropriately moderated by a front setback of 7.2 metres. This
               setback ensures the built form does not visually dominate the streetscape and maintains a human

                                                                                                      Page 9 of 19

Document Set ID: 24261132
Version: 12, Version Date: 26/11/2025

Page 10

               scale consistent with the intended character of the Medium Density Residential Zone. The front
               façade, boundary fence, pedestrian entry and driveway are integrated within a landscaped
               forecourt and additional planting forward of the fence line, contributing to a softened interface with
               the public realm.
               The architectural treatment of the façade, combined with the landscaped setback, introduces
               individualised design elements that enhance visual interest and positively contribute to the
               streetscape character. The proposal satisfies Performance Outcome PO14 of the Medium Density
               Residential Zone Code by ensuring that building bulk and scale are appropriately managed, and
               that the development integrates well with its surrounding context.
               Acceptable Outcome AO22.1 of the Medium Density Residential Zone Code states:




               The proposal involves excavation to a depth of approximately 3.8m to facilitate the basement level
               of the dwelling house and as such the development does not comply with AO14.5 of the Medium
               Density Residential Zone Code. The proposal is therefore required to comply with the
               corresponding Performance Outcome PO14 of the Medium Density Residential Zone Code,
               which states:




               Assessment
               The basement is proposed to be excavated without the need for retaining walls at the side
               boundaries. The basement is located immediately under the proposed dwelling house and the
               ground level around the perimeter of the site beyond the footprint of the dwelling house will remain
               relatively undisturbed and will be suitably landscaped. Where existing landscaping is removed as
               a part of construction, replanting will be facilitated to the boundaries of the site to maintain a high-
               level of landscape amenity to adjoining residents and street frontages.
               To ensure the proposed amount of cut does not lead to erosion, SCG have prepared civil drawings
               including bulk earthworks and have submitted a Dewatering Management Plan and Geotechnical
               Report.
               4.     CONSULTATION
               4.1. Referral Agencies
               Not Applicable
               4.2. Internal Council Referrals
               The application was forwarded to the following internal Council officers for review and/or comment:
               •      Senior Development Engineer, Development Assessment

               Refer to the Senior Development Engineer’s Internal Memo in ECM for further information
               regarding their assessment of this combined application, including the recommended conditions.

                                                                                                       Page 10 of 19

Document Set ID: 24261132
Version: 12, Version Date: 26/11/2025

Page 11

               5.      CONCLUSION & REASONS FOR DECISION
               The proposed development generally complies with the requirements of the planning scheme and
               does not raise any significant issues that cannot be addressed by reasonable and relevant
               conditions. The application is therefore recommended for approval.
               The report is provided in accordance with Section 63(5) of the Planning Act 2016.
               RECOMMENDATION
               With regard to Application No MCU25/0053 and OPW25/0074 for a Material Change of Use -
               Dwelling house (Basement) and Operational Works - Excavation situated at 7 Noosa Parade,
               Noosa Heads Qld 4567 and described as BUP10936, it is recommended the application be
               approved in accordance with the following details for the Decision Notice:
               1.      APPLICATION DETAILS

                   Application No:               MCU25/0053 and OPW25/0074

                   Street address:               7 Noosa Parade, Noosa Heads Qld 4567

                   Real property description:    BUP10936

                   Planning Scheme:              Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
               •       Development Permit for Material Change of Use – Dwelling house (Basement)
               •       Development Permit for Operational Works – Excavation
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

                           DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE (MCU25/0053)
                                                  DWELLING HOUSE (BASEMENT)
               PLANNING
               When Conditions must be Complied With
               1.      Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
                       the use commencing, and then compliance maintained at all times while the use continues.
                       Currency Period
               2.      This development approval lapses if the use has not happened by 21 November 2031,
                       unless an application to extend the currency period is approved by Council.
                       Approved Plans
               3.      Development authorised by this approval must be undertaken generally in accordance with
                       the Approved Plans listed in the table below.

                Plan No.                Rev.    Plan/Document Name                                  Date

                24048 AR 10.01           4      Site Plan – Existing, Grid Setout and Proposed 22/09/2025
                                                prepared by Bureau Proberts

                24048 AR 21.01           10     G.A. Basement Plan prepared by Bureau Proberts      22/09/2025

                                                                                                      Page 11 of 19

Document Set ID: 24261132
Version: 12, Version Date: 26/11/2025

Page 12

                24048 AR 21.02          9     G.A. Ground Floor Plan prepared by Bureau 22/09/2025
                                              Proberts

                24048 AR 21.03          8     G.A. First Floor Plan prepared by Bureau Proberts       22/09/2025

                24048 AR 21.04          7     G.A. Roof Plan prepared by Bureau Proberts              22/09/2025

                24048 AR 30.01          7     North and South Elevations prepared by Bureau 22/09/2025
                                              Proberts

                24048 AR 30.03          7     East and West Elevations prepared by Bureau 22/09/2025
                                              Proberts

                24048 AR 40.01          9     Sections 1 and 2 prepared by Bureau Proberts            22/09/2025

                24048 AR 40.02          7     Sections 3 and 4 prepared by Bureau Proberts            22/09/2025

                24048 AR 40.03          7     Sections 5 and 6 prepared by Bureau Proberts            22/09/2025

                      Car Parking
               4.     Car parking spaces must be provided on site as shown on the approved plans and made
                      available and accessible at all times for residents. Vehicle manoeuvring areas are provided
                      on site in accordance with the Australian Standards for Off-street car parking so vehicles
                      enter and leave the site in a forward gear.
                      Lighting Amenity
               5.     No flood lighting must be used on site. Any vertical illumination resulting from direct, reflected
                      or other incidental external lighting emanating from the site must not exceed 8 lux when
                      measured at any point 1.5 metres outside the boundary and at any level from ground level
                      upward.
                      Environment
               6.     Sediment or any other material including building materials or waste products must not be
                      deposited or released into the road reserve, stormwater drain or adjacent properties.
                      Landscaping Works
               7.     A minimum of 20% of the site must be retained as soft landscaping.
                      Side boundaries are to include a mix of vegetation which includes shrubs and trees. The
                      plants are to be sourced from the Noosa Plan 2020 - PSP2 Landscaping planning scheme
                      policy and maintained for the life of the use at the site.
                      Existing vegetation in the road reserve must be retained, unless written authorisation from
                      Council is granted for the clearing.
                      Fencing
               8.     The maximum height any fences adjoining a residential use must not exceed 2.0m above
                      the natural ground level at any point. Unless is required to satisfy the acoustic condition of
                      this notice and accepted as generally in accordance by Council.
               9.     Street fencing must be provided generally as shown on the Approved Plans, and not exceed
                      1.8 metres in height along Noosa Parade
               10.    The area of land between the fence and the front property boundary must be landscaped to
                      screen the fence from the street. Landscaping must not encroach more than 500 millimetres
                      into the road reserve or within 1.5 metres of a sealed footpath.



                                                                                                        Page 12 of 19

Document Set ID: 24261132
Version: 12, Version Date: 26/11/2025

Page 13

                      Property Access and Driveways
               11.    Vehicle access to the subject site is limited to the constructed driveway only. A clause must
                      be included in the contract of sale for the subject site which requires vehicle access to be
                      from the constructed driveway only, and which prohibits the driveway from being relocated
                      without Council agreement.
               12.    Car parking spaces must be provided on site as shown on the approved plans and always
                      made available and accessible for residents. Vehicle manoeuvring areas are to be provided
                      on site in accordance with the Australian Standards for Off-street car parking so vehicles
                      enter and leave the site in a forward gear.
                      Stormwater Drainage
               13.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge without causing scour or damage to the subject site or any adjoining properties.
                      Easements
               14.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               15.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               16.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Geotechnical Stability
               17.    All works must be carried out in accordance with the recommendations contained in PTG
                      Consulting’s Geotechnical Investigation Report (PTG/01608-0001, Rev. 0) dated 28
                      February 2025 and endorsed as part of the building approval.
               18.    A dilapidation survey must be carried out of all adjacent properties, structures and
                      infrastructure prior to the commencement of works and endorsed as part of the building
                      approval.
                      Acid Sulfate Soils
               19.    All works must be carried out in accordance with PTG Consulting’s Acid Sulfate Soil
                      Management Plan (PTG/01608-0002, Rev. 0) dated 11 April 2025 and endorsed as part of
                      the building approval.
                      Dewatering
               20.    All dewatering works must be carried out in accordance with ADG Consulting’s Dewatering
                      Management Plan (ADG1777.25, Rev. 0) dated 1 May 2025 and endorsed as part of the
                      building approval.
                      Earthworks and Retaining Walls
               21.    All earthworks and associated batters/retaining structures, both above and below ground
                      level, both temporary and permanent, must be undertaken in accordance with the conditions
                      of this approval and contained entirely within the subject site unless written permission from
                      the respective landowner(s) is provided to Council.
               22.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height.
                      Damage to Services and Assets
               23.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:

                                                                                                     Page 13 of 19

Document Set ID: 24261132
Version: 12, Version Date: 26/11/2025

Page 14

                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.




                              DEVELOPMENT PERMIT FOR OPERATIONAL WORKS (OPW25/0074)
                                                         (EARTHWORKS)
               APPROVED PLANS
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                           Plan No.          Rev.    Plan/Document Name                            Date

                           0423 – OW3.1        B     Bulk Earthworks Plan prepared by SCG 1/05/2025
                                                     Consulting
                                                     As annotated by Council

                           0423 – OW3.2        B     Earthworks Sections prepared by SCG 1/05/2025
                                                     Consulting
                                                     As annotated by Council

                           0423 – OW3.3        A     Earthworks Sections prepared by SCG 1/05/2025
                                                     Consulting
                                                     As annotated by Council

               CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 21 November 2027, unless an application to extend the currency
                      period is approved by Council.
               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               3.     All necessary approvals from external service providers (e.g., Unitywater) and external
                      parties on which the development works are proposed have been obtained and a copy
                      supplied to Council.
               4.     A condition report including photographs of the frontage of the site must be completed prior
                      to any works commencing.
               5.     Any changes to the details associated with the supervising RPEQ or Principal Contractor
                      during construction, must be notified to council in writing within five business days of the
                      change occurring.
               6.     Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.




                                                                                                     Page 14 of 19

Document Set ID: 24261132
Version: 12, Version Date: 26/11/2025

Page 15

               DURING CONSTRUCTION
                      Engineering
               7.     The developer must meet any costs to repair damage to any Council asset during
                      construction, where damage is a result of the development works. Damage to assets must
                      be repaired immediately where it creates a hazard to the community. In circumstances where
                      the damage does not create a hazard to the community, it must be repaired immediately on
                      completion of the works associated with the development.
               8.     All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
                      who is independent of the Developer and Principal Contractor, and they must certify that all
                      works conform to the Operational Works permit. Where municipal works are involved, such
                      confirmation must be submitted for the respective hold points prior to any site inspection by
                      Council Officers.
               9.     All works must be constructed and work procedure undertaken in accordance with:
                      a.      The approved plans/documents and conditions detailed in this Decision Notice;
                      b.      All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines; and
                      c.      The latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site.
                      Works within Road Reserve/Reinstatement
               10.    Safe pedestrian and vehicle access on all streets in the vicinity of the development must be
                      maintained at all times. Should footpath/road closures be necessary to carry out construction
                      works, Council’s Engineering Officer must be notified prior to the proposed closure and all
                      requirements complied with.
               11.    All frontage works must match neatly with existing road and verge/footpath features.
                      Additional works beyond the frontage may be required to provide an acceptable transition to
                      existing road and verge/footpath profiles.
               12.    Electrical conduits or other services proposed to be installed within existing and proposed
                      road reserves under existing sealed carriageways, concrete pathways, concrete/sealed
                      driveways or significant vegetation must be installed by boring. Trenching is not permitted,
                      unless specifically approved by Council.
                      Earthworks and Retaining Walls
               13.    All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines
                      on Earthworks for Commercial and Residential Development.
               14.    All earthworks and associated batters/retaining structures, both above and below ground
                      level, both temporary and permanent, must be contained entirely within the subject site
                      unless written permission from the respective landowner(s) is provided to Council. The
                      retaining systems shown on the engineering drawings do not form part of this approval.
               15.    Fall protection must be provided to retaining walls that are over 1m high.
               16.    Slope and batters are a maximum grade of:
                      a.      1 in 6 where in proximity to waterbodies;
                      b.      1 in 4 for grassed areas;
                      c.      1 in 3 for planted areas; and
                      d.      1 in 2 for combined structural engineering and planting solutions.




                                                                                                    Page 15 of 19

Document Set ID: 24261132
Version: 12, Version Date: 26/11/2025

Page 16

                      Stormwater Drainage
               17.    Appropriate scour protection must be provided at the outlet of all stormwater pipes including
                      temporary outlets.
               18.    Works associated with this permit must not adversely impact on the existing drainage
                      conditions on other properties (e.g., by blocking or interfering with natural overland flows).
               19.    Construction of all internal stormwater drainage works must comply with the relevant
                      section/s of Australian Standard AS/NZS 3500.3.
                      Erosion and Sediment Control
               20.    Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection
                      Regulation 2019) must not be released from the site or to waters within the site, or be likely
                      to be released should rainfall occur, unless all reasonable and practicable measures are
                      taken to prevent or minimise the release and concentration of contamination.
               21.    Sediment and erosion control measures must be in place prior to works commencing. If such
                      measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such
                      fines can be issued if sediments from the site are found to enter or have the potential to enter
                      Council’s stormwater system, natural waterways, any downstream stormwater filtration
                      system or adversely impacting on other properties. The sediment and erosion control design
                      and measures have NOT been approved, it is the site's Supervising Engineer who is
                      responsible for ensuring that the sediment and erosion control measures have:
                      a.      Been duly designed by an RPEQ or CPESC and constructed in accordance with "best
                              practise" methods,
                      b.      Been revised by an RPEQ or CPESC to address the issues raised by changes in the
                              projected construction schedule and/or methods,
                      c.      Been revised to address predicted rainfall events, and
                      d.      Achieve the desired environmental outcomes.
                      Council may request further controls to be installed should the implemented measures be
                      found inefficient.
               22.    The erosion and sediment control measures must be designed, installed and maintained in
                      accordance with the supervising engineer instructions and the current best practice
                      standards.
                      (*) Refer to Advisory Note.
               23.    The developer must ensure non-essential exposure of soil is prevented by restricting the
                      extent of disturbance and minimising the duration of soil exposure to adverse weather
                      conditions and effectively turf, cover or stabilise any disturbed area without delay and prior
                      to rainfall occurring.
               24.    The developer must ensure sediment does not leave the site or enter onto adjoining
                      properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or
                      machinery. It is essential to implement appropriate approved erosion and sediment control
                      measures throughout the site during all phases of construction including vehicle shakedown
                      pad/grid (or similar) at the access to the construction site. Where sediments or other
                      contaminants are deposited on a road, they must be removed so as not to enter Council’s
                      drainage system or waterways.
               25.    Prior to the completion of the development and commencement of use, all site surfaces must
                      be effectively stabilised using methods which have achieved effective short-term stabilisation
                      and which will continue to achieve effective stabilisation in the medium to long-term.
                      For the purpose of this condition, an effectively stabilised surface is defined as one that does
                      not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion
                      or lead to sedimentation, or lead to water contamination.


                                                                                                            Page 16 of 19

Document Set ID: 24261132
Version: 12, Version Date: 26/11/2025

Page 17

                      Damage to Services and Assets
               26.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.


               5.     REFERENCE DOCUMENTS

                Plan No.                    Rev.   Plan/Document Name                                Date

                PTG/01608               –    O     Geotechnical Investigation Report prepared by 28/02/2025
                0001                               PTG Consulting

                PTG/01608               –    1     Acid Sulfate Soil Investigation Management Plan 11/04/2025
                0002                               prepared by PTG Consulting

                ADG1777.25                   O     Dewatering Management Plan prepared by ADG 1/05/2025
                                                   Consulting

               6.     REFERRAL AGENCIES

               Not applicable.
               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
               1.     An applicant for a development application may make an agreement with an assessment
                      manager, referral agency or other person to establish the responsibilities, or secure the
                      performance, of a party to the agreement about a development condition.
                      Building and Construction Industry (Portable Long Service Leave) Levy
               2.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.
                      General Advisory Notes
               3.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
                      the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.
               4.     Should any changes or modifications to the approved plans be required as a result of
                      construction constraints, a “Request to change an existing approval” under the Planning Act
                      2016 must be made. Amended plans clearly indicating the changes must be lodged with this
                      application along with the appropriate fees.




                                                                                                      Page 17 of 19

Document Set ID: 24261132
Version: 12, Version Date: 26/11/2025

Page 18

                      Environmental Advisory Notes
               5.     The Environmental Protection Act 1994 states that a person must not carry out any activity
                      that causes, or is likely to cause, environmental harm unless the person takes all reasonable
                      and practicable measures to prevent or minimise the harm. Environmental harm includes
                      environmental nuisance. In this regard persons and entities, involved in the civil, earthworks,
                      construction and landscaping phases of this development are to adhere to their ‘general
                      environmental duty’ to minimise the risk of causing environmental harm.
                      Erosion and Sediment Control
               6.     Accepted best practice standards include International Erosion Control Association
                      Australasia Best Practice Erosion and Sediment Control.
               7.     Qualified Person, for the purpose of erosion and sediment control is a Certified Professional
                      in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional
                      Engineer of Queensland (RPEQ).
               8.     As a general rule, a site is determined to have achieved effective short-term stabilisation if
                      at the time of the plan sealing inspection:
                      a.      Methods of stabilisation are:
                              •    appropriate for slopes and slope lengths; and
                              •    are consistent with best practice environmental management practices such as in
                                   the Manual for Erosion and Sediment Control or the IECA Manual; and
                      b.      Stormwater runoff from the site is not currently and is not likely to result in visible
                              evidence of sedimentation or erosion, or lead to water contamination.
                      Road Reserve Permit
               9.     This development permit provides the applicant with written authority to undertake the
                      development in accordance with the conditions. Any additional activities that are undertaken
                      inside Council’s Road reserve for the purpose of acting on this development permit may
                      require a Road Reserve Permit. These additional activities may include, but are not limited
                      to, hoarding, pedestrian diversions, laneway closures, etc. To apply for a Road Reserve
                      Permit, or for more information, Contact Council’s Road Reserve Officer at
                      [email protected] Act 2014 – Fire Ant Control
               10.    Developers must remain vigilant for the presence of fire ants. Under the Biosecurity Act 2014,
                      individuals and businesses are responsible for ensuring that they follow the movement
                      controls for specific organic materials to help prevent the spread of fire ants within South
                      East Queensland’s fire ant biosecurity zones. Movement of a fire ant carrier from within a fire
                      ant biosecurity zone may need a biosecurity instrument permit. More information is available
                      on https://www.fireants.org.au/treat/business-andindustry/movement-controls.
               8.     PROPERTY NOTES

               Not applicable.
               9.     VARIATION APPROVAL DETAILS

               Not applicable.
               10.    FURTHER DEVELOPMENT PERMITS REQUIRED

                Development Permit for Building Works             All building work.

               11.    SUBMISSIONS

               Not applicable.


                                                                                                      Page 18 of 19

Document Set ID: 24261132
Version: 12, Version Date: 26/11/2025

Page 19

               12.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.
               13.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available online at
               www.noosa.qld.gov.au or at Council Offices.




                                                                                                    Page 19 of 19

Document Set ID: 24261132
Version: 12, Version Date: 26/11/2025

Used in these records

About this file

File size
3.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU25 0053.pdf · 3.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.