Council archive · source document
Decision Notice - Approved by Delegation of Authority MCU26 0068 & OPW26 0096 (As Published) · MCU26/0068
4. ASSESSMENT MANAGER CONDITIONS
Approved Plans
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
D-MS-70283-01 B Site Plan & Water Allocation 11/09/2026
Prepared by Marine Structures
D-MS-70283-02 B Layout Plan 11/09/2026
Prepared by Marine Structures
D-MS-70283-03 A Elevation 25/05/2026
Prepared by Marine Structures
D-MS-70283-04 A Bearer & joist Detail Plan 25/05/2026
Prepared by Marine Structures
D-MS-70283-05 A Jetty Details 25/05/2026
Prepared by Marine Structures
D-MS-70283-06 B Pile Setout 11/09/2026
Prepared by Marine Structures
Currency Period
2. The Currency Period for this development approval lapses if all conditions have not been
complied with, and the plan of survey lodged with Council for endorsement by 21 September
2028, unless an application to extend the currency period is approved by Council.
Performance Bond
3. Security in the form of a cash bond or trading bank guarantee to the sum of $5000 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
commencement of the works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of this approval less any costs incurred by Council in respect
of enforcing performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
Bonds
4. Bonds must:
a. meet the requirements of Council’s relevant Planning Scheme Policy for performance
and uncompleted works.
b. be lodged with Council and accompanied by the Bond Administration Fee/s.
c. be requested for release by writing to Council, when relevant approval requirements
have been met.
General Conditions
5. All structures must be designed and constructed such that they are free standing within the
waterway and are not connected to or behind the revetment wall
6. All structures must have no detrimental effects on stormwater drains and/or easements.
Page 2 of 6
Document Set ID: 25191042
Version: 3, Version Date: 22/09/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority MCU26 0068 & OPW26 0096 (As Published).pdfRelated documentApplication case desk ↗
Decision Notice - Approved by Delegation of Authority MCU26 0068 & OPW26 0096 (As Published)Related documentApplication case desk ↗
About this file
- File size
- 148 KB (small file)
- File type
No other editions are linked here.