Skip to the record
Accept no imitations.

Council archive · source document

0015E24E.001

of 236

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (13.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Text sections not matched to the original PDF pages. See original document to check page numbers.

rr |
                                                                                 We

approximately 3.5m lower than Noosa-Eumundi Road, thereby sinking the built form and presenting a
6m building height to street level.
To facilitate an effective interface to Gateway Drive the proposal will step the car park across its width to
bring the level of the carpark back to a workable level above Gateway Drive. This stepping also assists
with the effective drainage management of the site through vegetated swales to ensure the highest
quality stormwater discharge.
Urban services are available to the site and extensions and connections to these services will be
provided as part of establishing the proposal.
ENGINEERING ASSESSMENT
The attached Surface Water Management Plan as prepared by Cardno (Qld) Pty Ltd (refer to Appendix
F), demonstrates that the proposed Bunnings Warehouse can adequately manage the stormwater
runoff through the use of various bioretention devices, which will clean and detain stormwater runoff and
allow for this water to be reused in various onsite applications such as. Furthermore, this management      @
plan also provides strategies to mitigate the potential of erosion occurring across the site in all phases of
the development and the effects erosion may have on the surrounding environment. This plan will
effectively ensure that the proposal will not add to the possible flood risk of the surrounding area as well
as ensuring that the surrounding waterways are maintained in the current ecological state.

TRAFFIC ASSESSMENT
TTM Group have undertaken a Traffic and Parking Impact Report (refer to Appendix D) in order to
determine what impact the proposal will have on existing and future traffic conditions. TTM have
determined that the proposal will generate increased traffic levels along Eumundi-Noosa Road by 4%
on weekdays and by 7% on weekends. The Department of Main Roads considers an increase of less
than 5% to be insignificant and so on this basis the weekday increases can be seen as being “barely
significanf’, while the weekend increase may be seen as being significant.
Despite these estimated increases in traffic volume, TTM have reported that the proposal will not
compromise the functionality of Eumundi-Noosa Road and that this road is currently operating well
under its capacity. This will be further offset by new road improvements that Council will be undertaking   @
in anticipation of the areas future growth.
ECONOMIC ASSESSMENT
Leyshon Consulting have undertaken an Economic Impact Assessment (refer to Appendix E) of the
proposed Bunnings Warehouse and have determined that there is an economic need for such a
proposal. This is further supported by the conclusion made by His Honour Judge Robertson, who as
part of the appeal by Bunnings to the decision made by Council on the previous development
application for a Bunnings Warehouse that “The evidence establishes a planning need for a mega
hardware store of the kind proposed by Bunnings”. This is in response to evidence supplied by Leyshon
Consulting and Urban Economics.
The impact a new Bunnings Warehouse will have on existing and future hardware, furniture, floor
coverings and camping equipment market segments will be minimal, with the proposal estimated to
capture only 7.7% of these markets. The impact the proposal may have on the Shire Business Centre is
also likely to be minimal as much of Stage 1 of this development has been leased with only small
tenancies that could not accommodate a Bunnings Warehouse being available. It should be noted that

    743 Ann Street, PO Box 1559, Fortitude Valley QLD 4006 Phone 07 3237 8899 Facsimile 07 3237 8833
                                Page 8 | 6631_planning.report_mdm_280706.doc

Used in these records

About this file

File size
13.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E24E.001.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.