Council archive · source document
0015E24E.001
Very large file (13.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Text sections not matched to the original PDF pages. See original document to check page numbers.
tty
Bunnings Noosaville ratte pent eoustcs
© 2007 - TTM Consulting (SC) Pty Ltd Project No: 50545
4. Current and Future (2016) Traffic Volumes
TTM have surveyed intersections along Eumundi Noosa Road
| Table 2: Surveyed 2006 Peak Hour Traffic Volumes and Predicted 2016 Volumes
Intersection Thursday Saturday 2016 .
3:00 — 4:00pm 11:00 —12:00pm PM Peak Hour
16 June 4" June (Note 1)
(% Change vs 2006)
Eumundi Rd / Beckmans Rd
Eumundi Rd West 1514 1515 1000 (-35%)
© Eumundi Rd East 1970 2218 1900 (-5%)
Beckmans Rd 1799 1103 1800 (0%)
Eumundi Rd / Rene St
Eumundi Rd West 2558 2291 1900 (-25%)
Eumundi Rd East 2760 2364 1900 (-30%)
Rene Street 944 510
Eumundi Rd / Eenie Ck Rd
Eumundi Rd West 2825 2627 1900 (-30%)
Eumundi Rd East 1915 1824 1700 (-10%)
Eenie Creek Rd 901 782 1600 (+75%)
Existing Bunnings Site 110 195
Note 1 — This is the weekday peak hour traffic volume based on daily estimates
described in “Coastal Area Traffic & Transport to 2016" report assuming that peak
hour traffic represents approximately 10% of daily traffic and Stage 2 of the Eenie
@ Creek Rd project and the Walter Hay Drive project are completed.
www.ttmgroup.com.au
T: (07) 5479 2455 F: (07) 5479 3651 E: [email protected] Page 7See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E24E.001.pdfRelated documentPublic source context ↗
07/0256 - MCU - Bunnings Warehouse [As Published]Related documentApplication case desk ↗
About this file
- File size
- 13.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.