Skip to the record
For the highest quality transcripts.

Council archive · source document

0015E24E.001

of 236

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (13.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Text sections not matched to the original PDF pages. See original document to check page numbers.

tiny
             Bunnings Noosaville                                                                  Tieltie Past Re oustics
             © 2007 - TTM Consulting (SC) Pty Ltd                                              Project No: 50545

             If development traffic generation was to be distributed with 35% of traffic to/from the west, 5% to/from
             Rene Street, 15% to/from Eenie Creek Road and 45% to/from the east, the resultant distribution of
             development traffic would be as shown in Figure 3.
                                                 ,            45%                   S/5   L Plcov
                                            Noosa             1170vpd Thurs =      {7  or eld
                                                       .      1735 vpd SavSun         aEGRE    ad,
                                7 ani) }S       mf              ae          3     E Cer /      64
                       20%                  " gs S               |         ge    Sa       %, Ca
                       520 vpd Thurs                  »         a      Ag        sree ae Sar
                       770 vpd Sat/Sun       vA say   A        Neer, B/,° Gane      age YO   Te
                                     gant V8 BO =           &       MP   EEL ING                 /
                            ==        . ze a |    * ; 4 | D a    :         a a Te
                                         ee         Tod    piv    comsede  <a c~     a
                              .      EE                >   Al      ‘a ones        1 5 Yo
                                                       3     ome        gS        390 vpd Thurs
@                                                   El      pe    8               580 vpd Sat/Sun
                                   15%                     5%
                             1~_|  390 vpd Thurs    HE)                                    \
                                                     5     130 vpd Thurs                         L
                                >} 580 vpd Sat/Sun         190 vpd Sa/Sun
             Figure 3:  Estimated Development Traffic Distribution

             Based on the estimated distribution shown in Figure 3 and assuming a development traffic generation of
             2,600 vpd and 3,850 vpd for weekdays and weekend days respectively, the proposed development will
             cause traffic increases at each of the nearby roundabout controlled intersections as shown in Table 4.

             Table 5:   Estimated Intersection Volume Increases

©@           Eumundi Rd Intersection   | Traffic          Traffic Generation |TrafficIncrease _|Increase

             Beckmans Rd                  26260   24130]    910     1350      683     1013    2.6%     4.2%
             Rene Street                  31140   25780 | 2600      3850     1950     2888    6.3%     11.2%
              Eenie Ck Rd                 31800   29420 | 1560      2315     1170     1736    3.4%     5.9%
              Note : The above development traffic increase estimate is based on an assumption that approximately 25%
                    of generated traffic occurs as "drop-in" trips.
             The estimates shown in Table 5 indicate that the development will increase traffic volumes at nearby
             intersections on Eumundi Road by in the order of 4% on weekdays and 7% on Saturdays and Sundays.
             Authorities (eg. DMR) generally accept that increases of less than 5% are not “significant”. In that context
             the weekday traffic increases at intersections are barely significant whilst the weekend day increase is
             significant. However, the weekend increase becomes less significant when considered in the context of
             economic impact.

            www.timgroup.com.au                             —_
             -                               T: (07) 5479 2455 F: (07) 5479 3651 E: [email protected] Page 9

Used in these records

About this file

File size
13.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E24E.001.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.