Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

0015E24E.001

of 236

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (13.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Text sections not matched to the original PDF pages. See original document to check page numbers.

tiny
              Bunnings Noosaville                                                                          Tratte PertiE Reoustios
         "©2007 - TTM Consulting (SC) Pty Ltd                                                           Project No: 50545

              16.      Conclusions

              Based on the investigations and considerations described in this report TTM are of the following
              opinions:

                  e   There are sound transport and traffic engineering reasons which support locating this type of
                      development in this location.

                  e   The location of the development on Eumundi Road is consistent with the past, current and
                      planned function of Eumundi Road as a major arterial road route serving local and regional!
                      travel.

                  e   The impact of the proposed development on the operation of Eumundi Road intersections
                      compared with the impact of an alternative industrial development of similar size is insignificant.

                  e   The primary increase in traffic congestion and delays in Eumundi Road over the foreseeable
                      future will arise from “normal” traffic growth which Council has already responded to in various
                      new road improvements.

                  e   There is capacity in the existing road network to accommodate the proposed development with
                      any increases in short term congestion being accommodated in a minor extension of peak traffic
                      period at the Beckmans Road roundabout:

                  It is considered there are no transport and traffic engineering considerations which should
@            :    reasonably cause the proposed development not to be approved.

              www.timgroup.com.au               :                                                           .
                                                  T: (07) 5479 2455 F: (07) 5479 3651 E: [email protected] Page 21

Used in these records

About this file

File size
13.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E24E.001.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.