Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

0015E24E.001

of 236

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (13.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Text sections not matched to the original PDF pages. See original document to check page numbers.

BUNNINGS WAREHOUSE, NOOSAVILLE                                  |  S
 SURFACE WATER MANAGEMENT PLAN                              Cc          Cardno

 LIST OF TABLES
Table 1     Rainfall Parameters for Rockhampton .............cccccccsccsssssssscssscsscecscenscesserstessensseaces 2
Table 2     RAFTS Model: Area and Slope .......... ccc cccecccseccccccsssceceesesescausccesscssssvepecectsaeeenveneeses 2
Table 3     Rational Method Calculations ............ccccecccccccecsenssccecccesstsasecccesesrsuuvessentscesseesecene 3
Table 4     Rational Method vs RAFTS Results ..............ccccccceccsescssecsecstsatecessecstanececsnsttatsssesees S
Table 5     Detention Basins Stage Storage Curve .........eeccccesecesesereettvessvensesssasreseeveettensrene S
Table 6     Detention Basin Sizing ReSUlts........0.......cccccescssuscessceseesnsceeseesscssccaceecesseseseceesecersens 4
Table 7     Detention Basin Sizing Results — Including Unattenuated Carpark Area ................5
Table 8     BCC Swale Design Guidelines 0.0.0.0... .cccceccessscceccseseeeseccsesseseseerevstesseceestseesseeseee O
Table 9     Stormwater Management Practices............. ccc cccceeccsecccsecssesscceceessssareccuesccttecerseesee B
Table 10    Water Quality Objectives .000........c ccc ccccceescsnecsescseccessusessnssensecassesecttrsecsenseessreeeee 10
Table 11    Bioretention Device Parametels ...............cccccccssssescestcrecsesserecescveserssttseececesesstneseneee A
Table 12    Total Annual Loads .............ccececceeessescecceeseesuvesseuecocucecussscesesecssscceesensnstatecesercesteeene V3
Table 13    Rainwater Tank Performance ..............cc.:csscsessecscesneccescersesaccestecssascutecsesessssssesercee 14
Table 14    Rainwater Tank Performance ............cc.cceccescssssseessscececeeessuecetsccessssaucvevessteccaseeseeee 15 @
Table 15    Detention Basin Parameters: SUMMALY.............:ccceccsecceseeeceessscecttseceecseeseeesseeerseee 18
LIST OF FIGURES
Figure 1    Schematic Treatment Train
Figure 2    Locality Plan
Figure 3    Existing Site
Figure 4    Proposed Site and Conceptual Drainage Layout

APPENDICES
APPENDIX A      RAFTS Results
APPENDIXB ~~ HEC-RAS Results
APPENDIX C      MUSIC Parameters
APPENDIX D      Statement of Landscape Intent                                               @

Bunnings Warehouse                       Version 3                          8 February 2007
JA3501-54\WP\SW MP3.doc             Commercial in Confidence                      Page iii  ‘

Used in these records

About this file

File size
13.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E24E.001.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.