BUNNINGS WAREHOUSE, NOOSAVILLE                                          |   )
SURFACE WATER MANAGEMENT PLAN                                       qc          Cardno

         4.6        MUSIC Methodology
         In order to determine the effectiveness of the proposed treatment train in meeting the water
         quality objectives, a stormwater quality analysis was performed using the Model for Urban
         Stormwater Improvement Conceptualisation (MUSIC) Version 3.01.
         The model requires the user to specify meteorological data (rainfall and evaporation), soil
         properties and pollutant loads for each area of the site, and suitable parameters for the
         MUSIC model were adopted in accordance with the recommendations of the Brisbane City
         Council publication Draft Guidelines for Pollutant Export Modelling in Brisbane- Version 7
         (2003). The values adopted for the analysis are listed in Appendix A.
         Rainfall and evaporation data for the site was input to the model using ten years of data
         from 1988 to 1997 for Nambour, and employing a six minute time step.
         4.6.1      Adopted Land Uses
         The modelling guidelines define a range of source nodes reflecting various land use types.
         Based on the descriptions, the land use for the proposed site was modelled as                 @
         ‘commercial’.  The existing situation was also modelled for comparison and, due to the
         disturbed nature of the site in its current state, an ‘urban residential’ node is appropriate.
         The areas of buildings, car parks, bio-retention reserves and landscaped borders were.
         derived from site survey and design plans. Roof areas, car parks, roads and associated
         hardstands were assumed to be completely impervious, and the bio-retention reserves and
         landscaped areas assumed to be completely pervious.
         4.6.2      Nursery area
         The nursery area has been assumed to be completely impervious, and is included in the
         mode! as a ‘building’.   Rainfall on this area will be intercepted either by the concrete
         hardstand or the shade sails.    Although a proportion of incident rainfall will permeate
         through the sails and possibly be intercepted by the plants and their containers, this effect
         has been discounted to enable a conservative quantity assessment.
         Information received from Arterra Landscape Architects and from staff at existing Bunnings
         Warehouses suggests that growing plants would be irrigated at a rate of 20 to 25
         millimetres per week.   From the proposals, the growing area has been assumed to be           @
         equivalent to the area under the shade sails; some 970 m*.
         Separate from the main treatment train, the growing area was modelled as a completely
         pervious agricultural node, using a specially prepared rainfall file which simulated the above
         irrigation rate. it was assumed that plants would require irrigation every day for eight
         months, but only every other day for four summer months - a daily rainfall total of 3.6
         millimetres being applied accordingly. Daily pollutant fluxes were exported from this model
         and saved, and applied to the main treatment train model using an ‘Imported Data’ node.
         The mode! is shown schematically in Figure 1.
         4.7        Device Sizing
         The vegetated reserves located between the car parking bays will be used to contain the
         main treatment device for the development — a series of long bio-retention devices. The
         car park areas will be graded such that the vast majority of the flow resulting from rainfall
         events of up to the three-month return period will be directed toward the devices.  After
         passing through a 500 mm depth of sandy loam filter material, slotted drainage pipes will
         collect the runoff and direct it to the detention basin.

Bunnings Warehouse                             Version 3                             8 February 2007
J:N3501 -54 \WPISW MP3,doc               Commercial in Confidence                          Page 12

Used in these records

About this file

File size
13.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E24E.001.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.