INTEGRATED PLANNING ACT 1997                                                                    IDAS Assessment Checklist, Version 18.0, 10 November 2006
 Electricity infrastructure               18.  The application involves: (tick the applicable box/es)
 For more information refer to schedule 2of the IP CF (i) reconfiguring a lot where any part of the lot is -    |           oe
 Unless you answered “none of the above" to Q18,         * subject to an easement in favour of a distribution entity or transmission entity under the
 the application triggers referral to the gaency to        Electricity Act 1994 and the easement is for a transmission grid or supply network under
which the easement is granted in favour of as advice       that Act; or
 agency.                                                 * situated within 100m of a substation site:
                                               [_] (ii)  a material change of use, assessable against a planning scheme and not associated
                                                         with reconfiguring a lot if —
                                                         * any part of the premises is subject to an easement in favour of a distribution entity or
                                                           transmission entity under the Electricity Act 1994 and the easement is for a transmission
                                                           grid or supply network under that Act; and
                                                         * any structure or work that is the natural and ordinary consequence of the use is, or will be,
                                                           located wholly or partly in the easement;
                                               (7 (ii)   a material change of use, assessable against a planning scheme and not associated
                                                         with reconfiguring a lot if any part of the premises is situated within 100m of a substation
                                                         site;
                                               C1 (iv) operational work that is filling or excavation assessable against the planning scheme,
                                                         not associated with reconfiguring a lot, if -
                                                        * any part of the premises is subject to an easement in favour of a distribution entity or
                                                           transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
                                                           the easement;
                                                        « the work is located wholly or partly within 10m of a substation site;                 ©
                                               [1 (v)_  none of the above.
 Land designated for community            19.  Does the application involve development assessable against the planning scheme and on land
 infrastructure                                designated for community infrastructure?
    Kcations involving d     Jand                   OG                    :                         Sy
designated for communi inestucar may tigger    (i)  intended to be supplied by a public sector entity; and
 this referral.                                (ii) on land not owned by or on behalf of the State; and
 For more information refer to schedule 2 of the IP es                                                            ‘
 Regulation.                                   {iii) other than development —
 {you answered ves" 10 019, the appcation tn       {a)   for the designated purpose; or
 depariment administering the Act authorising the  (b)   carried out by, or on behalf of, the designator.
               nt          xecull                           :                                  .
 development for the designated purpose.       x NO
 If an agency other than the designator is the
 assessment manager for the application, the   ] YES
 designating agency will be a concurrence agency for
 the application in relation to this matter.

                                                                             Page 6

Used in these records

About this file

File size
13.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E24E.001.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.