INTEGRATED PLANNING ACT 1997                                                                          IDAS Assessment Checklist, Version 18.0, 10 November 2006
         Whether particular buildings may be | 16.        An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
         occupied for residential purposes                referral to the local government as the concurrence agency.
         For more information go to schedule 2 table 1 of the
        IP Regulation.
         Assessment period 15 days. No response is a
         deemed refusal.                                                                                                                                  ,
         Design and siting                          17.   An application may trigger referral to the local goverment as the concurrence agency if the building work
         For more information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
        IP Regulation.                              18.   An application may trigger referral to the local government as the concurrence agency # the building work
         Assessment period 5 days. No response is a       does not comply with the qualitative statement for building clearance and site cover.
         deemed refusal                             19.   An application may trigger referral to the local government as the concurrence agency if the building work
                                                          does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
                                                          Development Code, part 11 or 12.
         Fire safety in particular budget           20.   An application may trigger referral to the local government as the concurrence agency to determine the
         accommodation buildings                          building will comply with the fire safety standard under the Building Act 1975 when the building work has
         For mare information go to schedule 2 table 1 of the been completed.
        IP Regulation.
         Assessment period 15 days. No response is a
         deemed refusal.
         Higher risk personal appearance            21.   An application may trigger referral to the local government as the concurrence agency to determine if the
         services                                         building work
         For more information go to schedule 2 table 1 of tha e — complies with the performance criteria of the Queensland Development code part 15; and
        IP Regulation and the QOC part 15.               e     the work does not comply with an acceptable solution stated in the part.
         Assessment perlod 15 days. No response is a
@        deemed refusall.
         Building work for residential service | 22.      An application for building work for premises in which residential care service under the Residential
         For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
        IP Reaulation and the QOC part 20.                teferral to the local goverment as the concurrence agency.
         Assessment period 15 days. No response is a
         deemed refusal.
         Building work for removal or               23.   An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
         rebuiiding                                       referral to the local government as the concurrence agency.
         For more information go to schedule 2 table 1 of the
        IP Reaulation.
         Assessment period 5 days. No response is a
         deemed refusa.
         Building work for rainwater tank in      | 24.   An application may trigger referral to the local government as the concurrence agency to determine if the
         designated rainwater tank area                   building work or structure complies with the relevant performance criteria if -
         For mora information go to schedule 2 table 4 of the e Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
        IP Requlation and the QOC part 25.                    building work, in a designated rainwater tank area; and
         Assessment period 15 days. No response is a   -  @   Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
         deemed refusal                                       solution for a relevant performance criteria.

                                                                                          Page 11

Used in these records

About this file

File size
13.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E24E.001.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.